Professional Documents
Culture Documents
2phase Diagram of Soil PDF
2phase Diagram of Soil PDF
Soil: A 3-
3-Phase Material
Air
Water
Solid
grain
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Va Air
Vv
Vw Water Ww Vw=Vv Water Va=Vv Air
Ws Vs Ws
Vs Soil solids Soil solids Vs Soil solids
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
PROPERTIES OF SOIL
Volumetric relationships
•Void ratio (e)
•Porosity (n)
•Degree of saturation (S) or (Sr)
•Air content (ac)
•Percentage air voids (na)
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Void ratio (e)
The ratio between volume of voids
to that of total volume of soil solids Va Air
Vv
Vw Water Ww
It is expressed in decimal
Vv
e
Vs
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Porosity (n) or percentage
voids
The ratio between volume of voids to Va Air
Vv
that of total volume of soil Vw Water
Vs Soil solids
It can not exceed 100%
Vv
n 100
V Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Porosity in terms of void ratio
V v
n
V
1 V V v V s
n V v V v
1 1 e 1
1 or
n e e
e
n
1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Hence porosity “n“ is given by,
e
n
1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Void ratio in terms of porosity
1 1
wkt , 1 or
n e
1 1 1 n
1 or
e n n
n
e
1 n
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Degree of saturation (S) or (Sr)
The ratio between volume of water
Va Air
to the volume of voids Vv
Vw Water Ww
It is expressed in percentage
Its value ranges between 0-
0- 1 V
Vw
S 100
Vv
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Air content (ac)
Va Va
ac Vv
Air
Vv Vw Water Ww
Ws
Va Vs Soil solids
na
V
The values of ac and
na are zero for a
saturated soil
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Water content (w) or moisture content
Mw
w 100
Ms
For some soils water content may be more
than 100%
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Volume mass relationship
Bulk mass density M
V
M s Where V = Unit
Dry mass density d
V total volume and
the unit for mass
M s at density is kg/m3
Saturated mass sat
V (or) g/cm3
density
M s ub
Submerged mass '
density V
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Volume weight relationship
Bulk unit weight W This is also known as total or wet
3
V unit weight. Its unit is kN/m
W
Dry unit weight d s
V
NOTE : V = Unit
Saturated unit W s at
sat total volume
weight V
Submerged or W s ub
buoyant unit weight '
V
Unit weight of soil Ws
solids s
Vs
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
SYMBOLS AND UNITS
Description Symbol
Mass density Weight density or unit
(g/cm3) weight ( kN /m3)
kN/m
Total or bulk t b t
or
Submerged sub or (
(’) sub or (’)
Dry d d
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
NOTE
= g
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Example
134.9cm3 Wa~0
Air
W =1.00
243.9cm3
Water 109.0g
109.0cm3
585.0cm3 1013.0g
s =2.65
341.1cm3 Solid 904.0g
Volumes Weights
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Example
134.9cm3 Air
w=1.00
243.9cm3
109.0cm3 Water
585.0cm3
G=2.65
341.1cm3 Solid
Vv 243.9
e 0.72
Vs 341.1
Volumes Vv 243.9
n(%) 100% 100 41.7%
V 585.0
V 109.0
S (%) w 100% 100 44.7%
Geotechnical Engg- Vv
Engg-I/Civil Engg./SKCET/ 243.9
Coimbatore
Three phase diagram in terms of void ratio (e)
ea Air Ma=0
e ea Air Wa=0
e
ew= Se Water ew=Se
Mw=S e w Water Ww=Sew
1+e
Ms Ws
Vs
Gs w Gs w
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
The mass-
mass-volume relationship can be written directly from the fig.
Porosity (n)
ea Air Ma=0
Vv e e e
n n ew= Se
V 1 e 1 e Water Mw=S e w
Degree of saturation (S
(Sr)
1+e
Vw ew
S Ms=Gw
Vv e 1 Soil solids
M s G w
d
V 1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Bulk density or total density “”
M s M w G w Se w (G Se) w
V 1 e 1 e
Saturated density “sat”
(G e) w ea Air Ma=0
sat e
1 e
ew= Se Water Mw=S e w
Submerged density “sub” or ’ for
fully saturated soil sub = sat - w
(G e) w 1+e
' w Ms=Gw
1 e Soil solids
1
Submerged density “sub” or ’
for partially saturated soil sub = sat- w
(G Se) w
' w
1 e Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
The weight volume relationship can be written directly from the fig.
Porosity
ea Air Wa=0
Vv e e
n
V 1 e ew= Se Water Ww=S e w
Degree of saturation
V e 1+e
S w w
Vv e
Soil solids Ws=Gw
1
Bulk unit weight or total
unit weight “ ”
Ws Ww G w Se w
V 1 e
(G Se) w
1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Saturated unit weight or “ sat”
Ws Ww G w Se w ea
sat Air Wa=0
e
V 1 e
ew= Se Water
(G Se) w (G e) w Ww=S e w
sat
1 e 1 e
1+e
Dry unit weight “ dry”
Soil solids Ws=Gw
1
Ws G w
d
V 1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Submerged unit weight for saturated soil
sub = sat - w
Ws Ww G w Se w
ea Air Wa=0
V 1 e e
(G Se) w (G e) w ew= Se Water Ww=S e w
w sub
1 e 1 e
1+e
Submerged unit weight for partially
saturated soil sub = sat - w Soil solids Ws=Gw
1
Ws Ww G w Se w
V 1 e
(G Se) w
w sub
1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of porosity
na Air Ma=0
n na Air Wa=0
nw=S n Water Mw=S n w nw Water Ww=S n w
1
Soil solids
Soil solids
Ms=Gw(1-n)
1-n Ws=Gw(1-n)
1-n
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of porosity
Void ratio “e”
na V n
Air Ma=0 e v
n V s 1 n
nw=Sn Water Mw=S n w
Dry density “d”
M s G w 1 n
1 d
Soil solids V 1
Ms=Gw(1-n)
1-n Bulk or total density “”
M Ms M
w
G w 1 n Sn w
V V
G 1 n Sn w
Ms Ws
Vs
Gs w Gs w
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of porosity
sat G 1 n n w
1
Soil solids
Ms=Gw(1-n)
1-n
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of porosity
1 sat G 1 n n w w
Soil solids
Ms=Gw(1-n)
1-n
Submerged density for partially saturated
soil “sub”
M Ms Mw
sat
V V
G w 1 n Sn w w
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
These relationships can be obtained in
terms of unit weight also
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of porosity
Void ratio “e”
na V n
Air Ma=0 e v
n V s 1 n
nw Water Mw=S n w
Dry unit weight “d”
1 M s G w 1 n
Soil solids d
V 1
Ms=Gw(1-n)
1-n
Bulk or total unit weight “”
M Ms M
w
G w 1 n Sn w
V V
G 1 n Sn w
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of void ratio & water content
V
Ms=Gw
Vs Soil solids 1 Soil solids
Ms=VsGw
Water content, w
M w Se W
w Se wG
M s G W
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Se=wG
Product of degree of saturation and
void ratio is equal to product of
water content and specific gravity
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Three phase diagram in terms of air voids
V
Ms Ws
Vs Soil solids Vs Soil solids
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
V V s V w V a
V V s V w V a
V V V V
V s V w V s V w
1 n a 1 n a
V V V V
M s M W
G w w
1 n a
V V
wM s
d w
1 n a
G w V
d w d d 1
1 n a w
G w w w G
d 1
1 n a w
w G
1 n a G w
d
1 wG
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
List of formulae
Mass density Unit weight Mass density Unit weight
(kg/m3) (kN/m3) (kg/m3) (kN/m3)
(G Se) w G w G w
(G Se) w d d
1 e
1 e 1 e
1 e
(G e) w (G e) w d
sat sat 1 w d
1 e 1 e 1 w
(G 1) w (G 1) w (1 na )G w (1 na )G w
' ' d d
1 e 1 e 1 wG 1 wG
n n na nac
e e na nac
1 n 1 n
e
n
e 1 ee
se wG se wG n n
1 e 1 e
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Determination of water content of soil
Pycnometer method
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Determination of water content of soil
Clean the empty container, dry it and weigh it with lid (M1).
Take the required quantity of the wet soil specimen in the
container and close it with lid. Take the mass (M2)
Place the container, with its lid removed in the oven at a
temperature of 110oC 5oC for 24 hours till the mass becomes
constant.
When the soil has dried, remove the container from the oven,
using tongs and cool it in a desiccator with the lid.
Find the mass (M3) of the container with lid and dry soil
sample.
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
S. No. Observation and calculation Trial Numbers
1 2 3
Observations
1.
Container number
2.
Mass of empty container, with lid, M1
3.
Mass of container with wet soil, M2
4.
Mass of container with dry soil, M3
Calculations
5.
Mass of water, Mw = M2 – M3
6.
Mass of solids, Ms = M3 – M1
7.
Water
M (M M )
content, = w M 100 = w M M x100
w
s
2
3
3
8.
Average water content (w) %
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Determination of water content of soil using pycnometer
Water
Water
M1 M2 M3 M4
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Determination of water content of soil by
Pycnometer method
Mass of empty pycnometer with lid = M1
Mass of pycnometer and wet soil =M2
Mass of pycnometer soil and water=M3
Mass of pycnometer and water=M4
G
M w (M 2 M 1 ) M 3 M 4
G 1
G
(M 2 M 1 ) M 3 M
4
M w G 1 x 100
w x 100
M G
s
M 3 M 4
G 1
G
M M 4
G 1
3
(M 2 M 1 )
w x 100
G G
M 3 M 4 G 1 M 3 M 4
G 1
(M 2 M 1) G 1
w 1 xEngg-
100
M M 4 G Geotechnical Engg-I/Civil Engg./SKCET/
3 Coimbatore
(M 2 M 1) G 1
Hence, water content w 1 x 100
M 3 M 4 G
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Determination of specific gravity of soil using pycnometer
Water
Water
M1 M2 M3 M4
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Mass of empty pycnometer with lid = M1
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Mass of solids (Ms)= M2- M1 , Substitute in equation I
G 1
M 3 M 4 M s eqnI
G
G 1
M 3 M 4 M 2 M 1
G
M 2 M 1 G M 2 M 1
M 3 M 4
G
1
M 3 M 4 M 2 M 1 M 2 M 1
G
1 M 2 M 1 (M 3 M 4 )
G M 2 M 1
M 2 M 1
G
M 2 M 1 (M 3 M 4 )
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Hence, specific gravity G =
M
M 1 2
G
M 2 M 1 (M 3 M 4 )
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Numerical:
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Numerical:
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Numerical:
5. There are two borrow areas A and B which have soil with
void ratios of 0.8 and 0.7 respectively
respectively.. The in place water
content is 20
20%% and 15
15%
% respectively
respectively.. The fill at the end of
construction will have a total volume of 10000 m3, bulk
density of 2 g/m3 and a placement water content of 22 %.
Determine the volume of soil required to be excavated from
both areas
areas.. Take G = 2.6565.. If the cost of excavation of soil
Rs.. 200 per 100 m3 for area A and Rs
and transportation is Rs Rs..
220 per 100 m3 for area B. Which of the borrow area is more
economical?
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Numerical: Borrow In situ Transp
6. An airport runway fill pit void ortatio
needs 600000 m3 of soil
ratio n Cost
compacted to a void ratio
of 0.75. There are two A 0.80 Rs. 10
borrow pits A and B from
m3
where the required soil can
be taken and transported
to the site. Which of the B 1.7 Rs. 5
borrow pit would be more
economical?
m3
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore
Numerical:
Geotechnical Engg
Engg--I/Civil Engg./SKCET/
Coimbatore