Potential cause

Potential failure Potential effect of /mechanism of


Item mode failure SEV failure Occur

Function

Piston ring

Compression No end gap


1) Seal compression Leakage Power loss 7 desciption 6

High blow by No plating specs 6

Low tang. Force 7

Engine

Customer Tight crankshaft


1) Generate power Low power dissatisfaction 8 clearance 7

Air cleaner
capacity 6

Restricted fuel
supply 4
Current design Resp &
control preventation DET RPN Recommended action target date Action results

Action taken SEV OCC DET

Component Mention of end gap in Design dept.


supplier's standard 4 168 component drg. (10.11.2010) Doc updated

Drg. Updation for chrome


Supplier's specs 5 210 plating DO Doc updated

Force specs
FEA analysis and resulted defined in
NA 8 392 tang. Force on drg. DO drawing

Competitor engine
benchamarking 7 392 Drawing modifications DO Drg modified

CFD analysis and specs


Design calculations 5 240 modifications DO Drg modified

Filter replacement
None 3 96 schedule to be finalized. DO Drg modified
esults

RPN