Professional Documents
Culture Documents
Tan, Mark Working Drawings PDF
Tan, Mark Working Drawings PDF
N 69
°24' E
186.0
5m
F20
F19
F18
C06
F17
F16 C05
3
F15 C04
MATERIALS
F14 C03 RECOVERY
PATROL CAR
6.29m
F13 FACILITY
C02 PARKING
N 30°36' W 13 F12
TERMINAL C01
F11
BUILDING -
ONE-LEVEL
75.000
F10 R07
TRANSIT WING GUARDHOUSE
F09
R06
GENSET HOUSE F08
R05
F07
89.54m
R04
F06
THREE-LEVEL MIXED
R03
63.500
PATROL CAR F05 USE PARKING
PARKING R02 BUILDING W/ ROOF
F04
DECK
S 35°0'36" E
F03 R01
F02
F01
BRIDGE
14.000
TERMINAL BUILDING -
GUARDHOUSE THREE-LEVEL
COMMERCIAL WING WITH
ROOF DECK
S I D E W A L K S I D E W A L K
13.000
13.000
10M SETBACK
10.000
2.667
TA XI Q UEUI NG L ANE TRICYCLE QUEUING L ANE
LOADING &
5.333
INFORMATION UNLOADING
8.000
PYLON PLATFORM INFORMATION
2.667
PYLON
1 S 55° W 190.70m 4
M C A R T H U R H I G H W A Y
ONE-LEVEL
FIXED
TERMINAL
SLIDE
SLIDE
FIXED
BUILDING -
75.000
FIXED
SLIDE
TRANSIT WING
SLIDE
FIXED
THREE-LEVEL MIXED
63.500
USE PARKING
BUILDING W/ ROOF
DECK
BUILING - COMMERCIAL
WING WITH ROOF DECK
S I D E W A L K S I D E W A L K
13.000
13.000
10M SETBACK
10.000
2.667
TA XI Q UEUI NG L ANE TRICYCLE QUEUING L ANE
LOADING &
5.333
UNLOADING
8.000
PLATFORM
2.667
10.006 12.000 12.000 9.200 10.000
M C A R T H U R H I G H W A Y
POLISHED CONCRETE
FLOORING
2.667
5.333
8.000
2.667
KEY PLAN
SCALE 1:5000 MTS
A B C D E F G H I K M N O P Q R S T U
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.300 9.050 9.050 5.300 5.000 5.000 5.000 5.000 5.000 5.000 5.000
5.825 3.225
16 TO
TRANSIT WING
6.000
17
5.700
TICKETING
TICKETING
QUEUE
OFFICE
AREA
18
1.075
.900
FIRE ATM
18* ROOM
SICK ROOM
ATM
ATM
FIXED
FIXED ATM
AREA
SLIDE
6.100
SLIDE
COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE COMMERCIAL SPACE ACCESS TO
7.400
ATM
CLINIC
PHARMACY UP FASTFOOD ATM FASTFOOD UP COFFEE SHOP CONVENIENCE PARKING BLDG
80 sq.m.
SLIDE
6.825
A-3 A-14
5.700
H A L L W A Y EXIT ENTRANCE H A L L W A Y
(MEDIUM SECURITY)
21*
S I D E W A L K S I D E W A L K
A-3 A-15
B
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - COMMERCIAL WING A
GROUND FLOOR PLAN
03
A R C H I T E C T U R E D E P A R T M E N T
2.667
5.333
8.000
2.667
KEY PLAN
SCALE 1:5000 MTS
A B C D E F G H I K M N O P Q R S T U
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.300 9.050 9.050 5.300 5.000 5.000 5.000 5.000 5.000 5.000 5.000
16
6.000
17
5.700
O P E N B E L O W
ACCU
PLATFORM
18
1.075
.900
DWN DWN
18*
OPEN
6.100
BELOW COMMERCIAL SPACE COMMERCIAL SPACE ACCESS TO
7.400
6.825
A-3 A-14 H A L L W A Y H A L L W A Y
5.700
O P E N B E L O W
21*
A-3 A-15
B
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - COMMERCIAL WING A
SECOND FLOOR PLAN
04
A R C H I T E C T U R E D E P A R T M E N T
2.667
5.333
8.000
2.667
KEY PLAN
SCALE 1:5000 MTS
A B C D E F G H I K M N O P Q R S T U
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.300 9.050 9.050 5.300 5.000 5.000 5.000 5.000 5.000 5.000 5.000
16
6.000
17
5.700
O P E N B E L O W
18
1.075
.900
6.100
TERMINAL SECURITY
BELOW COMMERCIAL SPACE COMMERCIAL SPACE ACCESS TO
7.400
6.825
A-3 A-14
5.700
H A L L W A Y H A L L W A Y
21*
A-3 A-15
B
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - COMMERCIAL WING A
THIRD FLOOR PLAN
05
A R C H I T E C T U R E D E P A R T M E N T
2.667
5.333
8.000
2.667
KEY PLAN
SCALE 1:5000 MTS
A B C D E F G H I K M N O P Q R S T U
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.300 9.050 9.050 5.300 5.000 5.000 5.000 5.000 5.000 5.000 5.000
16
6.000
17
5.700
O P E N B E L O W
18
1.075
.900
A C C U P L A T F O R M
18* ELECTRICAL
OPEN AND
6.100
BELOW SERVER ACCESS TO
7.400
6.825
A-3 A-14
5.700
21*
A-3 A-15
B
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - COMMERCIAL WING A
ROOF DECK PLAN
06
A R C H I T E C T U R E D E P A R T M E N T
2.667
5.333
8.000
2.667
KEY PLAN
SCALE 1:5000 MTS
A B C D E F G H I K M N O P Q R S T U
5.000 5.000 5.000 5.000 5.000 5.000 5.000 5.300 9.050 9.050 5.300 5.000 5.000 5.000 5.000 5.000 5.000 5.000
16
6.000
17
5.700
3.075
18
1.075
.900
18*
6.100
7.400
TRANSFORMER
PAD G A R D E N D E C K
B E L O W
20
A
6.825
A-3 A-14
5.700
21*
4.125
8.875
A-3 A-15
B
PROPERTY LINE
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - COMMERCIAL WING A
ROOF PLAN
07
A R C H I T E C T U R E D E P A R T M E N T
2.667
FLOORING
KEY PLAN
SCALE 1:5000 MTS
1 2 3 4 6 8 10 12 14 16 17
M MALE
T&B
CUSTODIAN
WAITING AREA
CLOSET ENTRANCE
9.050
(HIGH SECURITY)
FEMALE
T&B
B
K A-3 A-15
PASSENGER
WAITING
AREA
355 PAX
9.050
WAITING AREA TO
EXIT
COMMERCIAL WING
I
LOADING & UNLOADING PLATFORM
FEEDER ROUTES
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - TRANSIT WING A
GROUND FLOOR PLAN
08
A R C H I T E C T U R E D E P A R T M E N T
2.667
1 2 3 4 6 8 10 12 14 16
2.270
7.300 7.000 7.000 7.000 7.000 7.000 7.000 7.000 7.000 9.429
4.530
02 KEY PLAN
SCALE 1:5000 MTS
15.500
2.300
M
11.350
22.700
B
K A-3 A-15
9.050
I
2.300
12.500
TERMINAL BUILDING - TRANSIT WING
01 ROOF PLAN
A-9 A-9 SCALE 1:300 MTS
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING - TRANSIT WING A
ROOF PLAN
09
A R C H I T E C T U R E D E P A R T M E N T
ALUMINUM COMPOSITE
PANEL
WALL CLADDING
SQUARE TUBE
HORIZONTAL LOUVRE WALL
A B C D E F G H I J K L M N O P Q R S T U
TOP OF CANOPY
3.500 .850
3.000 1.350
TOP OF PARAPET
1.800
ROOF DECK FFL
3.500
SECOND FFL
10.500
3.500
MEZZANINE FFL
.150 3.500
GROUND FFL
DRIVEWAY FFL
REFLECTIVE TEMPERED
GLASS
SQUARE TUBE
VERTICAL LOUVRE WALL
TERMINAL BUILDING
01 FRONT ELEVATION
A-10 A-10 SCALE 1:300 MTS
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING A
FRONT ELEVATION
10
A R C H I T E C T U R E D E P A R T M E N T
TRANSLUCENT
POLYCARBONATE CLEAR TEMPERED GLASS
ROOFING
REINFORCED CONCRETE;
ANTI HEAT-GAIN
EXTERIOR PAINT FINISH
TRANSLUCENT
POLYCARBONATE
ALUMINUM COMPOSITE ROOFING
PANEL WALL CLADDING
U T S R Q P O N M L K J I H G F E D C B A
TOP OF CANOPY
3.000 1.350
3.500 .850
TOP OF PARAPET
SECOND FFL
10.500
3.500
MEZZANINE FFL
3.500
GROUND FFL
REINFORCED CONCRETE
WALL; ANTI-HEAT GAIN FIRE EXIT; FIRE-RATED
EXTERIOR PAINT FINISH STEEL DOOR
TERMINAL BUILDING
01 REAR ELEVATION
A-11 A-11 SCALE 1:300 MTS
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING A
REAR ELEVATION
11
A R C H I T E C T U R E D E P A R T M E N T
1 2 3 4 6 8 10 12 14 16 17 18 18* 20 21*
BOTTOM OF PASSENGER
LOUNGE ROOF
10.920
9.920
GROUND FFL
ALUMINUM COMPOSITE
WALL CLADDING
TERMINAL BUILDING
01 LEFT SIDE ELEVATION
A-12 A-12 SCALE 1:300 MTS
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N TERMINAL BUILDING A
LEFT SIDE ELEVATION
12
A R C H I T E C T U R E D E P A R T M E N T
ALUMINUM COMPOSITE
PANEL WALL CLADDING
21* 20 18* 18 17 16 14 12 10 8 6 4 3 2 1
TOP OF CANOPY
3.000 1.350
BOTTOM OF CANOPY
SECOND FFL
3.500
MEZZANINE FFL
3.500
GROUND FFL
SQUARE TUBE
REFLECTIVE TEMPERED HORIZONTAL LOUVRE
GLASS WALLS
ALUMINUM COMPOSITE
REINFORCED CONCRETE
PANEL WALL CLADDING
COLUMN; ANTI-HEAT GAIN
EXTERIOR PAINT
TERMINAL BUILDING
01 RIGHT SIDE ELEVATION
A-13 A-13 SCALE 1:300 MTS
AR521-ARCHITECTURAL DESIGN 10 AR. JOE ALLEN TAN, uap RIGHT SIDE ELEVATION
FIRE EXIT; SHEAR WALL
CANOPY; ALUMINUM
COMPOSITE PANELS
A B C D E F G H I J K L M N O P Q R S T U
TOP OF CANOPY
3.500 .850
3.000 1.350
TOP OF PARAPET
ELEV. ELEV.
MACHINE MACHINE
1.800
ROOM ROOM
T&B T&B
FEMALE MALE
SECOND FFL FIRE EXIT T E R M I N A L A D M I N I S T R A T I O N O F F I C E TOUR & RENT-A-CAR SERVICE OUTSOURCED PAYMENT AND REMITTANCE CENTER
10.500
3.500
ELEV. ELEV.
PIT PIT
TERMINAL BUILDING
01 SECTION THRU A
A-3 A-14 SCALE 1:300 MTS
1 2 3 4 6 8 10 12 14 16 17 18 18* 20 21*
HALLWAY
BOTTOM OF PASSENGER
LOUNGE ROOF
2/F
HALLWAY
10.920
9.920
MEZZANINE
HALLWAY
P A S S E N G E R W A I T I N G A R E A
T I C K E T I N G O F F I C E
GROUND FFL
TICKETING OFFICE
WINDOW; CLEAR FIXED
GLASS PANEL
TERMINAL BUILDING
01 SECTION THRU B
A-3 A-15 SCALE 1:300 MTS
N
5 7 9 11 13 15 16* 17 18** 19 21
8.000 5.750 6.500 5.750 5.750 6.500 5.750 6.750 5.750 6.000
8.000
ZM
FIRE EXIT
5.175
6.250
FEMALE MALE
KEY PLAN UP
T&B T&B
25 50
ZK
5.425
30 24 49
6.250
FIXED FIXED SLIDE SLIDE
SLIDE
EXIT
SLIDE FIXED
ENTRANCE
FIXED
23 48
(MEDIUM SECURITY)
ZJ 29
22 47
21 46
ZI
6.358
20 45
18 28 19 44
6.250
18 43
17 42
ZH 17 27
16 41 POWDER
ZG ROOM
01 S
6.358
15 40
08 16 26 14 39
POWDER
6.250
ROOM I
13 38
02
12BICYCLE37
ZF 07 15 25 PARKING36
RENTABLE
D
11 OFFICE
ZE SPACE
FIXED
10 35 01
SLIDE
6.358
E
231.45 sq.m.
06 14 24 09 34
SLIDE
6.250
FIXED
FEMALE MALE
08 33 T&B T&B W
07 32
ZD 05 13 23
RAMP RAMP 06 31 A
FIXED
SLIDE
UP DOWN
FIXED
05 30
ZC TO FROM
SLIDE
6.358
PARKING AREA
SLIDE
ENTRANCE/EXIT L
FIXED
2F 2F 04 12 22 04 29 (MEDIUM SECURITY)
SLIDE
6.250
FIXED
03 28 ELEV
K
ZB 02 27
02
03 11 21
2.858
01 26 CCTV ELEV
ZA ROOM
01
3.500
INFORMATION LOBBY EXIT
B HELPDESK UP
A-16 A-23
Y 01 09 19
FIXED
SLIDE
ENTRANCE
(MEDIUM SECURITY)
X
SLIDE
FIXED
6.358
6.250
FIXED
SLIDE
EXIT
SLIDE
FIXED
W FIXED
SLIDE
FIXED
SLIDE
V ACCESS TO
TERMINAL BUILDING
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
GROUND FLOOR PLAN
16
A R C H I T E C T U R E D E P A R T M E N T
N
5 7 9 11 13 15 16* 17 18** 19 21
8.000
8.000 5.750 6.500 5.750 5.750 6.500 5.750 6.750 5.750 6.000
2.667 5.333 2.667
ZM
DWN
5.175
FIRE EXIT
KEY PLAN
6.250
FEMALE MALE
UP
T&B T&B
ZK 20 40
5.425
30
19 39
6.250
FIXED FIXED SLIDE SLIDE
EXIT ENTRANCE
(MEDIUM SECURITY) 18 38
ZJ 29
17 37
ZI
6.358
16 36
18 28
15 35
6.250
14 34
ZH 17 27
13 33 POWDER
ROOM
ZG 01
6.358
12 32
08 16 26
11 31 POWDER
6.250
ROOM
02
10 30
07 15 25 MOTORCYCLE
ZF RENTABLE
09PARKING
29 OFFICE
SPACE
ZE 02
08 28
6.358
364.45 sq.m.
06 14 24
07 27
6.250
FEMALE MALE
T&B T&B
06 26
ZD 05 13 23
RAMP RAMP 05 25
FIXED
SLIDE
UP DOWN
FIXED
ZC TO TO
SLIDE
04 24 PARKING AREA
6.358
SLIDE
ENTRANCE/EXIT
FIXED
3F GF 04 12 22 (MEDIUM SECURITY)
SLIDE
03 23
6.250
FIXED
ELEV
02 22
ZB 02
03 11 21
01 21
2.858
ELEV
ZA 01
3.500
LOBBY
FIRE EXIT
B
UP
A-16 A-23 09
Y 01 19
6.358
OPEN BELOW
6.250
W FIXED
SLIDE
FIXED
SLIDE
V ACCESS TO
TERMINAL BUILDING
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
SECOND FLOOR PLAN
17
A R C H I T E C T U R E D E P A R T M E N T
N
5 7 9 11 13 15 16* 17 18** 19 21
8.000 5.750 6.500 5.750 5.750 6.500 5.750 6.750 5.750 6.000
8.000
ZM
DWN
5.175
FIRE EXIT
6.250
KEY PLAN UP
FEMALE
T&B
MALE
T&B
ZK
5.425
30 40
6.250
FIXED FIXED SLIDE SLIDE
EXIT ENTRANCE
(MEDIUM SECURITY)
ZJ 29 39
ZI
6.358
18 28 38
6.250
ZH 17 27 37
POWDER
ZG ROOM
01
6.358
08 16 26 36 POWDER
6.250
ROOM
02
ZF 07 15 25 35 RENTABLE
OFFICE
ZE SPACE
03
6.358
364.45 sq.m.
06 14 24 34
6.250
FEMALE MALE
T&B T&B
ZD 05 13 23 33
RAMP RAMP
FIXED
SLIDE
UP DOWN
FIXED
ZC FROM TO
SLIDE
6.358
PARKING AREA
SLIDE
ENTRANCE/EXIT
FIXED
2F 2F 04 12 22 32 (MEDIUM SECURITY)
SLIDE
6.250
FIXED
ELEV
ZB 02
03 11 21 31
2.858
ELEV
ZA 01
3.500
LOBBY
FIRE
FIRE EXIT
B EXIT
A-16 A-23 UP
Y 01 09 19
6.358
OPEN BELOW
6.250
W FIXED
SLIDE
FIXED
SLIDE
V ACCESS TO
TERMINAL BUILDING
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
THIRD FLOOR PLAN
18
A R C H I T E C T U R E D E P A R T M E N T
N
5 7 9 11 13 15 16* 17 18** 19 21
8.000 5.750 6.500 5.750 5.750 6.500 5.750 6.750 5.750 6.000
8.000
ZM
DWN
5.175
FIRE EXIT
6.250
KEY PLAN FEMALE
T&B
MALE
T&B
ZK COUNTER
5.425
ENCLOSED ENCLOSED
CONFERENCE CONFERENCE CONFERENCE CUBICLE ROOM
6.250
ROOM ROOM
SLIDE SLIDE ROOM ROOM ROOM
04 03
FIXED FIXED
06 05
ZI
6.358
6.250
ZH
WORKHUB
OPEN AREA
ZG
6.358
6.250
ZF RENTABLE
OFFICE
ZE SPACE
02
6.358
G A R D E N D E C K
6.250
FEMALE MALE
T&B T&B POWDER
ROOM
02
ZD
POWDER
ROOM
ZC
6.358
01
6.250
ELEV
ZB 02
2.858
ELEV
ZA 01
Z
6.250
DWN
3.500
FIRE EXIT
B
A-16 A-23
Y
W A T E R
X T A N K S
6.358
STORAGE
AND
UTILITY
6.250
ROOM
V
ACCESS TO
TERMINAL BUILDING
ROOF DECK
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
ROOF DECK PLAN
19
A R C H I T E C T U R E D E P A R T M E N T
N
5 7 9 11 13 15 16* 17 18** 19 21
8.000
8.000 5.750 6.500 5.750 5.750 6.500 5.750 6.750 5.750 6.000
2.667 5.333 2.667
ZM
5.175
KEY PLAN
6.250
SCALE 1:5000 MTS
ZL
ZK
5.425
6.250
FIXED FIXED SLIDE SLIDE
ZJ
ZI
6.358
6.250
ZH
ZG
6.358
6.250
ZF
ZE
6.358
6.250
G A R D E N D E C K B E L O W
ZD
ZC
6.358
6.250
ZB
2.858
ZA
Z
6.250
3.500
B
A-16 A-23
Y
W A T E R
T A N K S
X B E L O W
6.358
6.250
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
ROOF PLAN
20
A R C H I T E C T U R E D E P A R T M E N T
V W X Y Z ZA ZB ZC ZD ZE ZF ZG ZH ZI ZJ ZK ZL ZM
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
REINFORCED CONCRETE
WALL, ANTI-HEAT GAIN GREEN LOW WALL
PAINT
ZM ZL ZK ZJ ZI ZH ZG ZF ZE ZD ZC ZB ZA Z Y X W V
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
FRONT ELEVATION
21
A R C H I T E C T U R E D E P A R T M E N T
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
ALUMINUM COMPOSITE
PANELS
5 7 9 11 13 15 16* 17 18** 19 21
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
RIGHT SIDE ELEVATION
22
A R C H I T E C T U R E D E P A R T M E N T
V W X Y Z ZA ZB ZC ZD ZE ZF ZG ZH ZI ZJ ZK ZL ZM
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
5 7 9 11 13 15 16* 17 18** 19 21
CLEAR TEMPERED GLASS
TOP OF PARAPET
4.000
THIRD FFL
3.500
SECOND FFL
3.500
GROUND FFL
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N MIXED-USE PARKING BUILDING A
SECTION THRU A
23
A R C H I T E C T U R E D E P A R T M E N T
2.667
5.333
8.000
2.667
02 KEY PLAN
.850
.850
SCALE 1:5000 MTS
2.200
3.000
2.150
2.150
1.400
T&B
.150
.150
TYPICAL GUARDHOUSE TYPICAL GUARDHOUSE
02 FRONT ELEVATION 03 REAR ELEVATION
4.000
A-24 A-24 SCALE 1:50 MTS A-24 A-24 SCALE 1:50 MTS
LOUVRES LOUVRES
POST
CLEAR TEMPERED GLASS CLEAR TEMPERED GLASS
WINDOW WINDOW
.850
3.000
TYPICAL GUARDHOUSE
2.150
2.150
01 FLOOR PLAN
A-24 A-24 SCALE 1:50 MTS
PANEL DOOR
S C H O O L O F E N G I N E E R I N G A N D A R C H I T E C T U R E
A ST UDY O N TRANSP O RTAT IO N URBA NISM A ND THE SO CIO S PATI AL EF FECTS O F TRANS PO RTAT IO N GUARDHOUSE: TYPICAL A
DETAILS
24
A R C H I T E C T U R E D E P A R T M E N T
ATM
SLIDE SLIDE
FIXED FIXED
ATM
ATM
FIXED
FIXED
FIXED ATM
SLIDE
SLIDE
SLIDE
ATM
ATM
SLIDE
SLIDE
FIXED
FIXED
FIXED FIXED
SLIDE SLIDE
FIXED FIXED
3.750
9.345
2.667
7.550
5.333
8.000
2.667
1.650
PROPERTY LINE
2.650
13.187 40.600 17.497 102.568 11.650
2.650