Project No.: RIT No.

:
Project Name:
Document Description:
Location: Substation
Equipment Description: HV Over Current & Earth Fault Relay of Transformer - 1

INSPECTION [ √ ] TEST [ √ ] DATE:


QIP Item
Description of Inspection / Test Activities Ref. Doc. No.
No.

(viii) Testing of Over Current Protection Relay Testing

Document1 Page 1 of 6
General Data:

Line/Feeder Power Transformer T-1 Serial Number

Relay Type HV Over Current & Earth Relay Model/Make


Fault

CT Ratio System Voltage

Relay Checks:

Items Status
Visual Inspection
Relay Damaged
Rating Information
Case Earth Installed
Test Block connection checked

Relay Energized

Relay Auxiliary Supply

Relay Healthy LED Working

Alarm LED Working

Trip LED Working

Measurement Checks
Input CT Ratio Injected Current (A) Calculated Current (A) Measured Current (A)

Document1 Page 2 of 6
B

Over Current (Low Set) I >


Curve: IEC S Inverse

Pick Up Test

Phase Set Pick Up Current (A) Observed Pick Up (A) Drop Off Current (A)

AB

BC

CA

ABC

Trip Time Test (2X)


TMS =

Phase Injected Current (A) Calculated Time (Sec) Observed Time (Sec)

AB

BC

CA

ABC

Document1 Page 3 of 6
Over Current (High Set) I >>
Curve Type: Instantaneous Trip

Trip Time Test (x1.2)

Phase Set Pick Up Current (A) Injected Current (A) Set Trip Time Observed Time (Sec)
AB

BC

CA

ABC

Earth Fault (Low Set) Ie >


Curve: IEC S Inverse

Pick Up Test
Phase Set Pick Up Current (A) Observed Pick Up (A) Drop Off Current (A)

Trip Time Test (X2)


TMS =

Phase Injected Current (A) Calculated Time (Sec) Observed Time (Sec)

Document1 Page 4 of 6
A

Earth Fault (High Set) Ie >>


Curve Type: Instantaneous trip

Trip Time Test (x1.25)

Phase Set Pick Up Current (A) Injected Current (A) Set Trip Time Observed Time (Sec)

Testing Equipment Data:


Name of Equipment:

Model/ Type:

Manufacturer:

Serial No:

Calibration Expiry Date:

Document1 Page 5 of 6
Document1 Page 6 of 6