Professional Documents
Culture Documents
SAP Testing Scenarios - Results
SAP Testing Scenarios - Results
Version 1
Last Rev
Description:
Table of Contents
1. PURPOSE...............................................................................1
2. PROCEDURE...........................................................................1
2.1. Create Inbound and Post Goods Receipt: VL31N/VL32N..................................................2
2.2. Visible in MB51.................................................................................................................... 3
2.3. Visible in PO History............................................................................................................ 3
1. PURPOSE
The purpose of this Standard Work Instruction is to provide a solution for when the packing
list is not visible in MB51.
2. PROCEDURE
Issue: The packing list not visible in MB51
Solution: Populate Packing List in “External Reference” and ”GR /GI Slip” to satisfy both requirements
This document does not contain any US export controlled technical data .
UTC Aerospace Systems Proprietary – ECCN: EAR99 Page 1/4
2.1. Create Inbound and Post Goods Receipt: VL31N/VL32N
This document does not contain any US export controlled technical data .
UTC Aerospace Systems Proprietary – ECCN: EAR99 Page 2/4
Navigate to “Administration” tab to enter “Packing List” under External ID
Tip: Please use to bring “GR/GI Slip” from hidden field into MB51 report.
Invoice Creation
This document does not contain any US export controlled technical data .
UTC Aerospace Systems Proprietary – ECCN: EAR99 Page 3/4
MIRO – When we select delivery note
Partha
This document does not contain any US export controlled technical data .
UTC Aerospace Systems Proprietary – ECCN: EAR99 Page 4/4