LATIHAN

PENGHANTARAN
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

COMPETENCY

Refresher Course for Switch Station Operator


1 Module 1 SSO 3 2-4 18-20 6-8
Ulangkaji Pengendali Stesen Suis SSO Modul 1

Refresher Course for Switch Station Operator


2 Module 2 SSO 3 6-8 21-23 20-22
Ulangkaji Pengendali Stesen Suis SSO Modul 2

3 500 kV Live Line Training (Refresher di tapak JB) Liveline 5 19-23 7-11 4-8

4 132/275 kV Live Line Training (Malim Nawar) Liveline 40 Upon request

5 132/275 kV Live Substation Training Livesubstation 5 25/2 - 1/3

Substation 132/275kV Competency


6 Non CP Substation 4 18-21 20-23 15-18 12-15 20-23
Kompetensi Pencawang 132/275 kV

Substation 275/500kV Competency Competent


7 3 Upon request
Kompetensi Pencawang 275/500kV 132k275/500kV

Overhead Lines & Cable 132/275kV Competency


8 Non CP Line 4 9-12 18-20 19-22
Kompetensi Talian Atas & Kabel 132/275kV

Tower Climbing Training (Seremban) 8-10 11-13


9 Lines & Non Lines 3 29-31 19-21
Kursus Memanjat Menara (Seremban) 29-31 25-27

E12 & E13


10 Earthing Resistance & Soil Resistivity measurement 1 11 8 9 7 18 9
line & SS

Telecontrol Competency
11 CP Telecontrol 5 7-11
Kompetensi Telecontrol

HVDC Competency
12 HVDC 3 4-6
Kompetensi HVDC
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

Authorised Person Revision


13 AP Cert 1 1 5 15
Ulangkaji Orang Berkebenaran

Electric Safety Rules Level II 7-9 6-8 3-5 7-9


14 Open to All 3 19-21 17-19 19-21 20-22
Aturan Keselamatan Elektrik Level II 21-23 13-15 17-19 21-23

15 Reliability Engineering Competency (New) Non CP RE 3 Upon request

Non CP 132kV Prot


132kV Transmission Protection Competency
16 5 18-22 22-26 17-21
Training Part 1

Non CP 132kV Prot


132kV Transmission Protection Competency
17 5 4-8 6-10 1-5
Training Part 2

Non CP 275kV Prot


500/275kV Transmission Protection Competency
18 4 26-29
Training (Module 1)

Non CP 275kV Prot


500/275kV Transmission Protection Competency
19 4 17-20
Training (Module 2)

Non CP 275kV Prot


500/275kV Transmission Protection Competency
20 4 14-17
Training (Module 3)

Non CP RSV / AD
21 Perlindungan Sistem Kuasa dan SAS (Module 1) 3 20-22
Technician

Non CP RSV / AD
22 Perlindungan Sistem Kuasa dan SAS (Module 2) 3 4-6
Technician

Introduction to SCADA Communication


23 TT09-E15 2 4-5
for Transmission

Introduction to SCADA Plant Interfacing


24 TT09-E14 3 18-20
for Transmission

25 Master System in Transmission TT09-E14 3 15-17


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

MANDATORY

Power System 1
26 TT05 2 4-5 16-17
Sistem Kuasa 1

Introduction to Primary Equipment (Substation)


27 Pengenalan Kepada Peralatan Utama TT05 2 26-27 14-15
(Pencawang)

Introduction to Primary Equipment (Lines & Cable)


28 Pengenalan Kepada Peralatan Utama (Talian & TT05 2 25-26 6-7
Kabel)

Electric Safety Rules (Transmission)


29 TT05 & TT09 4 25-28 2-5 26-29 23-26
Aturan Keselamatan Elektrik (Penghantaran)

30 Hazard Identification & Risk Assesment/Control TT06 2 9-10

Site Supervising
31 TT06 2 3-4
Penyeliaan Tapak

Primary Equipment (Substation) - Module 2


32 TT06 3 16-18
Peralatan Utama (Pencawang) - Modul 2

Primary Equipment (Lines & Cable) - Module 2


33 TT06 3 12-14
Peralatan Utama (Talian & Kabel) - Modul 2

Introduction to Technical Report


34 TT07 2 23-24
Pengenalan Kepada Laporan Teknikal

Testing & Commissioning


35 TT07 3 26-28
Pengujian & Mulatugas

Basic Condition Monitoring


36 TT07 2 15-16
Asas Condition Monitoring

Lines Maintenance
37 TT07 3 26-28
Senggaraan Talian
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

Substation Maintenance
38 TT07 3 9-11
Senggaraan Pencawang

Electric Supply Act (447) & Electric Rules 1994


39 Akta Bekalan Elektrik (447) & Peraturan Elektrik TT07 & TT10 2 1-2
1994

Substation Design and Maintenance


40 TT09 3 12-14 6-8 29-31 5-7 25-27
Rekabentuk dan Senggaraan Pencawang

Lines & Underground Cable Design and


Maintenance
41 TT09 3 16-18 20-22 5-7 13-15 9-11 8-10
Rekabentuk dan Senggaraan Talian & Kabel
Bawah Tanah
Operation of High Voltage Equipment and Power
42 System TT10 3 7-9
Kendalian Radas Voltan Tinggi dan Sistem Kuasa

Introduction to SEMS
43 TT11 2 23-24
Pengenalan Kepada SEMS

Substation Testing & Commissioning


44 TT11 3 11-13
Pengujian dan Mulatugas Pencawang

OSHA Act
45 TT12 2 27-28
Akta OSHA

46 Power Quality TT12 3 21-23

47 Condition Based Monitoring TT12 3 14-16

Non CP Civil / RSV


48 Civil Modules (Engineers & 15 Upon request
Technicians)

Basic Pilling Work Non CP Civil / AD /


49 3 Upon request
Kerja-Kerja Asas Cerucuk RSV (Technicians)

Non CP Civil / AD /
50 Teknologi Konkrit & Besi Tetulang 3 Upon request
RSV (Technicians)
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

Non CP Civil / AD /
51 Pemahaman Lukisan Teknikal & Aplikasi Kerja-kerja Dalam BQ 3 Upon request
RSV (Technicians)

Non CP RSV
52 Keperluan Penyeliaan Bagi Tujuan RSV 2 Upon request
(Technicians)

11-12
53 Pengenalan Kepada Peralatan Sekunder TT05 2
19-20

54 Peralatan Sekunder - Module 2 TT06 3 25-27

Pengenalan Kepada Perlindungan Sistem Kuasa / 9-11 6-8


55 TT9 3
Kawalan 16-18 20-22

56 Perlindungan Sistem Kuasa dan SAS (Module 1) TT10 3 19-21

57 Perlindungan Sistem Kuasa dan SAS (Module 2) TT11 3 25-27

58 SCADA System (M1) TT10 3 25-27 2-4

59 SCADA System (M2 + Refresher) - Transmission TT11 3 19-21


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

IN HOUSE PROGRAM

60 Tower Top Inspection Live Line (Malim Nawar) Line 5 17-21 19-23

2-4
Tower Top InspectionLive Line (REFRESHER- 19-21 23-25 21-23 4-6
61 Line 3 29-31 5-7 2-4
Practical) di tapak semua Region 26-28 30/4-2/5 28-30 25-27

62 KEMA Practical Line 5 8-12 6-10 10-14

63 4x4 Training Line Divers 5 14-18 4-8 8-12 27-31

64 Operation & Maintenance Power Transformer AM Technicians 3 Upon request

65 Operation & Maintenance Circuit Breaker AM Technicians 3 Upon request

66 Operation & Maintenance Isolator AM Technicians 2 Upon request

67 Operation & Maintenance CT / CVT AM Technicians 2 Upon request

68 Operation & Maintenance Surge Arrester AM Technicians 2 Upon request

Transmission Lines Insulator Maintenance


69 AM Technicians 3 Upon request
Senggaraan Penebat Talian Penghantaran

Transmission Lines Conductor Maintenance


70 AM Technicians 3 Upon request
Senggaraan Pengalir Talian Penghantaran

Design, Testing, Installation & Maintenance of Low


Voltage & High Voltage Power Cable for Upon request
71 Technicians
Technicians
Rekabentuk, Ujian, Pemasangan &
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

Understand Power System for Non Technical Support Service


72 2 Upon request
Managers Managers

73 OLTC Training for Technicians AM Tech SS 4 Upon request

74 OLTC Training for Engineers AM Engineers SS 3 Upon request

75 Motor Drive Unit (MDU) Circuitry AM Engineers SS 2 Upon request


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

ADVANCED / SPECIALISED

76 Advanced HV Substation Design E14 - E17 3 Upon request

Design, Testing, Installation & Maintenance of


77 E14 - E17 3 Upon request
Overhead Lines

Design, Testing, Installation & Maintenance of


78 E14 - E17 3 Upon request
Medium Voltage & High Voltage Cables

Design, Testing, Installation, Maintenance &


79 E14 - E17 3 Upon request
Failure Investigation of Transformer Bushing

understanding Transformer Insulation & Life


80 E14 - E17 3 Upon request
Extension Management

Condition Based Monitoring for Medium Voltage


81 E14 - E17 3 Upon request
& High Voltage Power Transformer

82 Faikure Investigation of Transformer Faults E14 - E17 3 Upon request

83 Failure Investigation & Analysis E14 - E17 3 Upon request

84 Advanced Project Management 3 3 Upon request

85 Fault Analysis in Transmission system Open to All 3 Upon request

86 Electrical Safety Rules for Contractor Open to All 3 Upon request

Non Prot.Engineer/
87 Protection for Non Protection Engineers 2 12-13 30-31
Manager
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

88 WISP & Protocol Internals E14-E17 3 5-7

89 IEC 101 & Protocol Internal E14-E17 3 5-7


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

POST PEP

90 Transmission Grid System E07/E08/E12/E13 3 16-18 19-21

91 Transmission Planning E07/E08/E12/E13 2 19-20 18-19

92 Energy Procurement E07/E08/E12/E13 1 18 20

93 Substation Equipment E07/E08/E12/E13 2 9-10 1-2 12-13 4-5

94 Wayleave E07/E08/E12/E13 1 2

95 Lines & Cable E07/E08/E12/E13 3 3-5 12-14 26-28 23-25

96 Electro Technical (Lightning) E07/E08/E12/E13 1 25 28 21

97 GIS Substation E07/E08/E12/E13 3 26-28 6-8 28-30

98 HVDC Substation E07/E08/E12/E13 2 22-23

99 Telecontrol E07/E08/E12/E13 1 6 22

100 Telecommunication E07/E08/E12/E13 1 7 23

101 Safety Working on HV Apparatus E07/E08/E12/E13 2 27-28 30-31 19-20


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

102 On Load Tap Changer For Young Engineers E07/E08/E12/E13 2 24-25 29-30 5-6 28-29 4-5

103 On Load Tap Changer For Managers E14/E15 1 15 28 19

104 Transformer Asset Management E07/E08/E12/E13 2 10-11 8-9 11-12

105 O&M CB / Isolator E07/E08/E12/E13 3 4-6 2-4

106 O&M LA / CT (KL South) E07/E08/E12/E13 1 9 12

107 O&M Capbank / SVC (KL South) E07/E08/E12/E13 1 10 13

108 O&M Transmission line E07/E08/E12/E13 3 20-22 16-18 4-6

109 Condition Monitoring E07/E08/E12/E13 2 12-13 23-24 5-6

110 Transmission Power System Protection (Module 2) E07/E08/E12/E13 3 25-27 2-4 21-23 25-27

111 Project Management (Modul 1) E07/E08/E12/E13 2 Upon request

112 Project Management (Modul 2) E07/E08/E12/E13 3 Upon request

Project Management Tools, Technique &


113 E13/E14/E15 3 22 - 24 25 - 27 20 - 22
Template

Project Management Contract Monitoring &


114 E13/E14/E15 3 3-5 25 - 27 24 - 26
Audit
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

E07/E08/E12/E13/E14/
115 FIDIC Yellow Book 2 7-8 8-9
E15

E07/E08/E12/E13/E14/
116 FIDIC Green Book 2 5-6 4-5 6-7 1-2
E16

E07/E08/E12/E13/E14/
117 Engineering Economics (UNITEN) 3 Upon request
E17

E12/E13
118 Transmission Power System Protection (Module 2) 3 25-27 2-4 21-23 25-27
(Post PEP + RSV)
ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

For ICT Only (ENGINEERING SERVICES TRAINING)

119 First Aid CPR & Basic First Aid TT09 3 27-28

Electric Safety Rules (Transmission)


120 TT09 4 6-9
Aturan Keselamatan Elektrik (Penghantaran)

121 Fundamentals of Telecommunication System TT09 2 11-12

122 Principle of Fiber Optic Cable TT09 4 14-17

123 48V DC system for Telecommunication TT09 3 5-7

124 Sistem SCADA (M1) for ICT-Telecommunication TT10 3 25-27

125 IT for Telecommunication Technologies TT11 3 19-21

126 Transmission Technology - PDH TT12 5 11-15 6-10

127 Transmission Technology - SDH TT13 5 14-18 1-5

128 Basic Protection for Telecommunication TT10 –Engineer 2 11-12

129 Last Mile Fibre TT11 3 22-24

130 Fundamentals Of Packet Switching TT11 3 16-18


ILSAS PROGRAM SCHEDULE FY2012/2013

TRANSMISSION TRAINING

Target Participant Duration


No Course Title Sept 12 Oct 12 Nov 12 Dec 12 Jan 13 Feb 13 Mac 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13
(Grade) (days)

131 Synchronization Theory & Application TT11 3 27-29

132 Basic Router Configuration TT12 4 7-10

133 OSHA Act TT13-14 2 29-30

134 Introduction To IP-PBX Open to All 2 5-6

Tower Climbing
135 Open to All 3 14-16
Memanjat Menara