M

M 52

√ √ √ √

√ √ √

EPC Contractor: PROJECT :


Name of Project Developer:
DWG. NO. TITLE Corporate Office: 7.5 MW Canal Top Solar Power Plant,Punjab
Sukhbir Agro Energy Limited (SAEL) M/s Vijay Printing Press Pvt. Ltd Ghaggar Branch Canal between RD73772 to RD88610
REFERENCE DRAWING
A-4 3rd Floor,Green Park Main , Civil Lines, Jalandhar - 144001
DRG. TITLE :
New Delhi
02 GENERAL REVISION VS SM KN 16.02.2018
AC SINGLE LINE DIAGRAM
01 GENERAL REVISION VS AS RV 20.01.2018 Regd. Office :
DRAWN VS DRAWING NO. SAEL-VPPPL-PUN-GM-7.5MW-DOC-ELE-027
00 FOR APPROVAL PURPOSE VS AS RV 23.11.2017 Sadiq Faridkot,Guruharsahai,
CHECKED SM SHEET SIZE A1 SCALE NTS
REV.NO. REVISION DESCRIPTION DRAWN CHECKED APPROVED DATE Distt-Ferozpur,Punjab-152022 APPROVED KN DATE 16.02.2018 REVISION 02