You are on page 1of 1

LEGEND / NOTES:

1 )-NODIMENSIONAL INFORMATION SHALL BE OBTAINED BY


SCALING FROM DWG.
ALL DIMENSIONS ARE IN MILLIMETERS

All steel & brackets shall be hot dip galvanized and


painted in reference to project specification
requirement of division 099600.3.6.D - Exterior High
Performance Coatings

3
LOAD CENTRE C
EXTERNAL WASTE COMPOUND
GA PLANS, ELEVATIONS & SECTIONS
7000

250 3000 250 3250 250

190 3185 3435 190


DETAIL A DETAIL B
(TYPICAL) (TYPICAL)
IPE 160 IPE 160
A

Z PURLIN Z PURLIN

FACILITY KEY PLAN

Z PURLIN Z PURLIN

KEYPLAN NORTH

H
KA
AK
LC-C

M
PROJECT
NORTH

Provide section
IPE 180

IPE 180

IPE 180
3600

5900
REVISION:
Z PURLIN Z PURLIN

10/ 2 /19 FIRST ISSUE FOR APPROVAL


REV. DATE DESCRIPTION OF REVISION APP.
(dd/mm/yyyy)

DRAWN BY: DESIGNED BY: CHECKED BY: APPROVED BY: DATE:


(dd/mm/yyyy)

IRFAN ENG. ANAS ENG. ANAS ENG. ANAS 30/ 11 /16

ARCH CIVIL STRC PAVN ELEC MECH ETLN DATE


APPROVED AS SUBMITTED
APPROVED WITH IND. CHANGES
DISAPPROVED RESUBMIT

Z PURLIN Z PURLIN

IPE 160 IPE 160


B

CLIENT:

KINGDOM OF SAUDI ARABIA


GENERAL AUTHORITY OF CIVIL AVIATION
KING ABDULAZIZ INTERNATIONAL AIRPORT
C130 ROOF PLAN DEVELOPMENT PROJECT

SCALE 1: 20 CONSTRUCTION MANAGER:

CONTRACTOR: SUB CONTRACTOR:

PROJECT
NORTH
NORTH
PHASE & DISCIPLINE:
SHOP DRAWING
STEEL STRUCTURE
DRAWING TITLE:

DETAIL PLAN OF STEEL ROOF


LOAD CENTRE C
EXTERNAL WASTE COMPOUND
MAKKAH GA PLANS, ELEVATIONS & SECTIONS

PROJECT NUMBER DRAWING NUMBER SHEET REV.


J-10-422-PF-0 001
SCALE (A0) 00
N.T.S 001

You might also like