Market research study on

“Travel pattern in near future”


of western railway

Report by

220 Heemanish Midde

MMS – 1 (2007 – 2008)


Xavier Institute of Management & Research, Mumbai
Mumbai University
ACKNOWLEDGEMENTS

I would like to thank especially our friends Vishal Bhatia and Balasaheb Mahajan for their support and
encouragement in and during the collection of data. They have been instrumental in completion of this project.

I am grateful to The Western Railway for their patience and generosity in sharing of data.

I would like to thank the Statistics department of St. Xavier’s College for their support and guidance in
completion of this interesting project. Their advice and encouragement is appreciated.

I am grateful to Prof. Macario for giving us this opportunity to work on the same.

- Heemanish Midde

1
TABLE OF CONTENTS

i. ACKNOWLEDGEMENTS
1. INTRODUCTION

1.2. CURRENT SITUATION

2. RESEARCH OBJECTIVE

2.2. PROBLEM STATEMENT

2.3. AIM

2.4. OBJECTIVE

2.5. PURPOSE

3. ASSUMPTIONS AND DECLARATIONS

4. RESEARCH METHODOLOGY

4.2. Research Design

4.3. Data Collection & Analysis

4.4. Calculations

4.5. Preliminary Conclusion

5. DATA INTERPRETATION

6. CONCLUSION

6.2. Causes

7. RECOMMENDATION

2
1
INTRODUCTION

The Mumbai Suburban Railway system, part of the public transportation system of Mumbai, is provided for by
the state-run Indian Railways' two zonal Western Railways and Central Railways. The system carries more than
6.1 million commuters on a daily basis and constitutes more than half of the total daily passenger capacity of
the Indian Railways itself. It has the highest passenger density of any urban railway system in the world.

1.2 CURRENT SITUATION

The Western Railway line between Churchgate terminus and Dahanu Road carries about 2.6 million passengers
per day, almost 43 percent of the total Mumbai suburban rail traffic. The annual passenger traffic density for
the Western Line exceeds 145 million passenger-km per km of route per year. In other words, more than 145
million passengers travel, on average, over each km of line per year. The busiest segment, 60 km between
Churchgate terminus and Virar, carries almost 900 million passengers per year. The annual traffic density,
about 255 million passenger-km per km of route, is believed to be the world record for passenger rail
transport.

Due to its extensive reach across the Mumbai Metropolitan Region, and its intensive use by the local urban
population, overcrowding has grown to be a compelling problem (4,700 passengers are packed into a 9-car
rake during peak hours, as against the rated carrying capacity of 1,700). This has resulted in what is known as
Super-Dense Crush Load of 14 to 16 standing passengers per square meter of floor space. Trains on the
suburban line are on average more than 4 minutes apart, contributing to the problem of overcrowding.

People in this belt face a big commuting problem. Men even travel atop the trains and even precariously hang
out, risking their lives nearly everyday. Many women also travel on one foot or half heels inside the train and
half heels outside! Accidents are common along this belt. People living in these areas have been crying for
better train facilities since many years. Their dreams will hopefully be a reality soon! The quadrupling project
which began in 1990s was always halted or delayed due to number of reasons like - hutments in the way of the
proposed tracks and many other ones!

3
With population in the Borivali to Virar region rising (reason being rising real estate rates in main Mumbai and
people moving for cheaper and bigger flats beyond), the commuting problem worsened.

4
2
RESEARCH OBJECTIVES

2.1 PROBLEM STATEMENT


A Person will board a Virar Local from Borivali Station during peak hours

2.2 AIM OF THE MARKET RESEARCH


Calculating the probability of getting into a Virar bound Local from Borivali station during the peak hours

2.3 OBJECTIVE
 To Identify Causes of overcrowding
 To Identify Alternatives modes of transport

2.4 PURPOSE OF THE MARKET RESEARCH


To verify the efficiency of Virar Locals

5
3
ASSUMPTIONS & DECLARATIONS

 Our research is based on Data collected in year 2006


 Considered only Virar bound local trains from 6.49pm to 8.19pm from Borivali Station
 Neglected Human Error
 Sample follows Normal Distribution

6
4
RESEARCH METHODOLOGY

4.1 Research Design

 Primary Data to be collected through direct observations


 Counting the number of people (in a virtual area) before the train arrives at Borivali Station
 Counting the number of people (in that virtual area) after the train leaves Borivali Station
 The above is to be done for three coaches of the same train such that it covers most number of
coaches of the train

 Secondary Data to be collected from Western Railway Headquarters, Churchgate


 Total capacity (seating and standing)
 Train Traffic
 Approximate Passenger Traffic

7
4.2 Data Collection & Analysis

Primary data

m: Number of people who manage to get inside the coach


n: Number of people who tried to get inside the coach
p: Probability/chance of getting inside the coach

1st Coach 6th Coach 10th Coach


Train
m n m n m n
6.49 15 45 19 57 22 46
7.03 18 60 9 47 37 56
7.11 32 52 27 46 43 55
7.27 29 43 26 42 33 50
7.38 20 54 27 57 34 54
7.49 13 61 32 63 32 53
7.58 20 54 26 59 49 59
8.04 16 63 34 66 26 47
8.19 10 54 38 72 26 60

Coach 1

90

80

70

N 60 n
u n
50 n n n n
m
n
b
40 n n
e
r 30

20
m m
10 m m m m
m m m
0
6.49 7.03 7.11 7.27 7.38 7.49 7.58 8.04 8.19
Train Timings

8
Coach 2

120

100

N 80
n
u n
m n
60 n n
b
e n
n n
r 40
n

20 m m
m m m
m m
m
m
0
6.49 7.03 7.11 7.27 7.38 7.49 7.58 8.04 8.19
Train Timings

Coach 3

120

100

N 80 n
u n
m n
n n
60 n n
b
e n
n
r 40

m
m
20 m m m m
m m m

0
6.49 7.03 7.11 7.27 7.38 7.49 7.58 8.04 8.19
Train Timings

Secondary Data

Train Capacity: 1,700


Train Traffic: 9 trains in 1 hr 30 mins
Passenger Traffic at Borivali Station: 650

9
4.3 Calculations

1st Coach 6th Coach 10th Coach


Train
m n p m n p m n p
6.49 15 45 0.333 19 57 0.333 22 46 0.478
7.03 18 60 0.3 9 47 0.191 37 56 0.661
7.11 32 52 0.615 27 46 0.587 43 55 0.782
7.27 29 43 0.674 26 42 0.619 33 50 0.66
7.38 20 54 0.37 27 57 0.474 34 54 0.63
7.49 13 61 0.213 32 63 0.508 32 53 0.604
7.58 20 54 0.37 26 59 0.441 49 59 0.831
8.04 16 63 0.254 34 66 0.515 26 47 0.553
8.19 10 54 0.185 38 72 0.528 26 60 0.433

m: Number of people who manage to get inside the coach


n: Number of people who tried to get inside the coach
p: Probability/chance of getting inside the coach

Statistical Calculation

 Mean = 0.4867
 Median = 0.508
 Mode = 0.333
 Range = 0.646
 Inter – Quartile Range = 0.2655
 Sample Variance = 0.0311
 Sample Standard Deviation = 0.1763
 Sample Skewness = -0.073
 Sample Kurtosis = -0.7162
 Population Variance = 0.0299
 Population Standard Deviation = 0.1730
 Population Skewness = -0.069
 Population Kurtosis = -0.8045

10
Probability calculated on the basis of Train and Coach

Train Probability Coach Probability


6.49 0.380 1st 0.362
7.03 0.399 6th 0.467
7.11 0.663 10th 0.627
7.27 0.652
7.38 0.488
7.49 0.439
7.58 0.550
8.04 0.437
8.19 0.390

Probability (Train)

0.7

0.6

P
0.5
r
o
b
0.4
a
b
i
0.3
l
i
t
0.2
y

0.1

0
6.49 7.03 7.11 7.27 7.38 7.49 7.58 8.04 8.19
Train

11
Probability (Coach)

0.7

0.6

P
r 0.5
o
b
0.4
a
b
i
0.3
l
i
t 0.2
y

0.1

0
1st 6th 10th
Coach Number

4.4 Preliminary Conclusion

 Probability of boarding the train from the 10th coach (0.627) is the highest while that of 1st coach
(0.362) is lowest
 Probability of boarding the 7.11 local (0.663) is the highest while that of 6.49 local (0.380) is the lowest
 P [Getting into a Virar bound Local from Borivali station during the peak hours] = 0.486

12
5
DATA INTERPRETATION

The Probability of 0.486 shows that a person at Borivali Station waiting to board the Virar Local during the
peak hours has a chance of less than 50% of being successful

We can also interpret that the reason of higher success rate at/around coach number 10 could be because of
the foot over bridge, which leads to the bus stop and the auto rickshaw stand outside the station

13
6
CONCLUSION
Probability of success being only 48.6% is very low

In the near future the probability may drop even further due to the residential developments in the Vasai –
Virar region and the commercial developments in the Borivali region

The Western railways may end up falling into big trouble if they act fast!!!

6.1 Causes
 No direct road link between Borivali and Vasai-Virar
 No alternative mode of transportation

14
7
RECOMMENDATION

The project of Quadrupling of the railway tracks between Borivali and Virar has to take the front seat

The old engines has to be replaced by newer and faster engines, which will increase the train speed and hence
the frequency of the trains could be looked upon

Old coaches/racks has to be replaced by new spacious and lighter ones

15
A Positive outcome is that, The Western Railway has already taken its first step towards the improvement of
Western Railway. They have started replacing their old engines and racks with new ones from May 2007
onwards. But they need to accelerate in the Quadrupling project.

*****