I. PEKERJAAN PERSIAPAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
II. PEKERJAAN TANAH
1
2
3
4
III. PEKERJAAN STRUKTUR BAWAH
1
4
5
10
11
12
IV. PEKERJAAN STRUKTUR ATAS
1
2
3
4
5
6
7
2
3
30
30
30
2
5 MCK 2
2
1.5
6 Kantor Lapangan 8
8
8 Jadwal Konstruksi
9 Air Kerja
10 Listrik Kerja
11 Perizinan Kerja
12 Mobilisasi dan Demobilisasi
13 Bedeng 7
6
14 K3L
PEKERJAAN TANAH
1 Galian
Galian Abutment A1 3.8
3,8
1,25
1.8
35
1,80
Galian Abutment A2 1.8
4,9
1,8
4.9
35
1,80
2 Timbunan 50
STA 19+600 - STA 19+650
50
1,4
3,8
35
25
1,45
2,55 35
4.3
1.48
4.29
3 Pemadatan Tanah 50
STA 19+600 - STA 19+650
50
35
b. Pile
3 Abutment a. Bekisting
3.6
3.6
1.1
0.78
0.78
Total
b. Beton
0.5
1.6
Total
4 Wing Wall a. Bekisting
1.48
4.3
4.5
4.3
4.3
0.3
1.69
b. Beton
4.5
4.3
1.48
4.3
Total
5 Pelat Injak a. Bekisting
5
0.5
0.688
0.33
0.535
0.3
b. Beton
5
0.5
0.688
Total
Pile Head P1
1 Bore Pile Ø800 (L= 17m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Pile Head P2
1 Bore Pile Ø800 (L= 17m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P3
1 Bore Pile Ø800 (L= 17m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P4
1 Bore Pile Ø800 (L= 17m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P5
1 Bore Pile Ø800 (L= 17m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P6
1 Bore Pile Ø800 (L=20m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P7
1 Bore Pile Ø800 (L=20m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P8
1 Bore Pile Ø800 (L=20m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head P9
1 Bore Pile Ø800 (L=20m) a. Beton
0.8
b. Unit
2 Beton 15.49
15.1
1.038
2.189
Total
3 Bekisting 2.189
1.038
1.038
2.189
15.49
15.1
Total
Pile Head A2
1 Bore Pile Ø800 (L=14m) a. Beton
0.8
b. Pile
3 Abutment a. Bekisting
3.6
3.6
1.1
0.78
0.78
Total
b. Beton
0.5
1.6
Total
4 Wing Wall a. Bekisting
1.48
4.3
4.5
4.3
4.3
0.3
1.69
b. Beton
4.5
4.3
1.48
4.3
Total
5 Pelat Injak a. Bekisting
5
0.5
0.688
0.33
0.535
0.3
b. Beton
5
0.5
0.688
Total
6 Lining Batu Kali 1.75
2
7.62
8.12
Total
Penulangan Abutment 1
Wingwall L (A1)
Reinforcement Code Diameter (mm)
W1 13
W1a 13
W2 16
W2a 16
W3 16
W3a 16
W3b 16
W4 13
W4a 13
W4b 13
W5 16
W6 13
Jumlah 1 Segment Wingwall
Jumlah Total
Abutment A1
Reinforcement Code Diameter (mm)
A1 16
A2 16
A3 16
A3a 16
A4 16
A5 16
A6 19
A7 19
A8 16
A9 13
A10 13
A11 13
A12 13
A13 13
Jumlah 1 Abutment
Jumlah Total
P1 19
P2 19
P3 19
P4 19
P5 19
Jumlah 1 Pelat Injak
Jumlah Total
Penulangan Abutment 2
Wingwall L (2)
Reinforcement Code Diameter (mm)
W1 13
W1a 13
W2 16
W2a 16
W3 16
W3a 16
W3b 16
W4 13
W4a 13
W4b 13
W5 16
W6 13
Jumlah 1 Segment Wingwall
Jumlah Total
Abutment A2
Reinforcement Code Diameter (mm)
A1 16
A2 16
A3 16
A3a 16
A4 16
A5 16
A6 19
A7 19
A8 16
A9 13
A10 13
A11 13
A12 13
A13 13
Jumlah 1 Abutment
Jumlah Total
P1 19
P2 19
P3 19
P4 19
P5 19
Jumlah 1 Pelat Injak
Jumlah Total
Penulangan Pier 1-9
Pier 1-9
Reinforcement Code Diameter (mm)
A1 16
A2 16
A3 16
A3a 16
A4 16
A5 16
A6 19
A7 19
A8 16
A9 13
A10 13
A11 13
A12 13
A13 13
Jumlah 1 Pier
Jumlah 9 Pier
b. Bekisting
0.55
0.55
0.07
b. Bekisting
0.625
0.95
0.625
1.961
0.07
Diagfragma
Reinforcement Code Diameter (mm)
D1 13
D2 22
D3 13
Jumlah 1 Diafragma
Jumlah Total
G1 13
G2 13
G3 13
G4 13
G5 13
G6 13
G7 13
G8 13
D1a 22
Jumlah
Jumlah Total (120 Unit)
W1 10
W1a 10
W2 10
Jumlah
Jumlah Total
Jumlah 120 Unit
Satu Segmen Balok Girder Type 2
Reinfoecement Code Diameter (mm)
G1 13
G2a 13
G3 13
G4a 13
G5 13
G6a 13
G7a 13
G7 13
G8 13
D1a 22
Jumlah
Jumlah Total (120 Unit)
Bar Bending Lifting Bar
Strand Code Diameter (mm)
W1 10
W1a 10
W2 10
Jumlah
Jumlah Total
Jumlah 120 Unit
RC Plate
Reinforcement Code Diameter (mm)
R1 13
R2 13
Jumlah Total R1 (1560 Unit)
Jumlah Total R2 (240 Unit)
Jumlah
b. Bekisting
0.25
0.25
3 Barrier a. Beton
0.204
0.15
0.203
0.3
0.296
0.526
0.725
0.5
b. Bekisting
0.203
0.3
0.296
0.526
0.725
1.271
0.731
0.32
0.35
PEKERJAAN UTILITAS
1 Marka Jalan
Type B-1 (menerus) 150
Type A (putus-putus) 75
(ukuran 3mx0,12m dengan jarak 3m)
2 Lampu Jalan Lampu setiap jarak 15m
3 Rambu Lalu Lintas
Rambu Besar
Rambu Kecil (Rambu Peringatan)
4 Grill Setiap jarak 15m untuk 2 lajur
PEKERJAAN DRAINASE
1 Instalasi Pipa PVC 12" 150
4
JUMLAH KUANTITAS SATUAN
L (Lebar) T (Tinggi)
2400 PEKERJAAN PERSIAPAN
30 1 1200 m 2
30 1 1200 m2
30 1 3000 m2
264
132 132 m2
132 132 m2
2 3 18 m2
2 6 24 m2
6 1 48 m2
4 2 32 m2
1 1 Ls
1 1 Ls
1 1 Ls
1 1 Ls
1 1 Ls
6 2 84 m2
1 1 Ls
35 1.25 1 122.50 m3
35 1.8 1 211.05 m3
35 1.4 1 4550 m3
3.8
35 1.45 1 1750 m3
2.55
35 1 1750 m2
35 1 875 m2
7249.02346 m3
14 10 70.336 m3
10 10 unit
1.6 4 23.04 m2
16.5 4 237.6 m2
16.5 2 36.3 m2
0.5 4 1.56 m2
16.5 4 51.48 m2
349.98 m2
4.5 4 52.02 m2
0.22 4 3.872 m2
0.3 2 2.58 m2
0.3 2 0.18 m2
0.3 2 1.014
Total 59.666 m2
8.3838 m3
0.33 2 3.3 m2
0.22 2 0.26136 m2
15.98 2 10.5468 m2
15.98 2 17.0986 m2
15.98 2 9.588 m2
Total 40.79476 m2
17 10 85.408 m3
10 10 unit
1.6 1 2 48.944 m3
Total 52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
Total 76.28236 m2
17 10 85.408 m3
10 10 unit
1.6 1 2 48.944 m3
Total 52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
17 10 85.408 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
17 10 85.408 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
17 10 85.408 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
20 10 100.48 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
20 10 100.48 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
20 10 100.48 m3
10 10 unit
1.6 1 2 48.944 m3
1 4 61.18 m2
76.28236 m2
20 10 100.48 m3
10 10 unit
1.6 1 2 48.944 m3
52.764768 m3
1.6 2 7.0048 m2
1.6 2 3.3216 m2
0.74 4 4.77596 m2
1 4 61.18 m2
76.28236 m2
14 10 70.336 m3
10 10 unit
1.6 4 23.04 m2
16.5 4 237.6 m2
16.5 2 36.3 m2
0.5 4 1.56 m2
16.5 4 51.48 m2
349.98 m2
4.5 4 52.02 m2
0.22 4 3.872 m2
0.3 2 2.58 m2
0.3 2 0.18 m2
0.3 2 1.014
Total 59.666 m2
8.3838 m3
0.33 2 3.3 m2
0.22 2 0.26136 m2
15.98 2 10.5468 m2
15.98 2 17.0986 m2
15.98 2 9.588 m2
Total 40.79476 m2
34 0.3 1 80.274 m3
118.524 m3
Dimenion (cm)
a b c d e f
20 575
20 537.5
20 575
20 537.5
20 410 20 20 420 20
20 305 20 20 315 20
20 370 20 20 380 20
20 410 20 20 420 20
20 305 20 20 315 20
20 370 20 20 380 20
225 165 505
20 19 8
Dimenion (cm)
a b c d e f
20 575 1180 20
20 575 1180 20
20 575 1180 20
165
20 118 575 20
230
105 55 230
20 410 145 305 145
300 230
300 1200 300 30 30 1200
300 1200 300 60 30 1200
300 1200 300 80 30 1200
8 105 8
8 145 8
Total Length
Dimenion (cm) (m)
a b c d e
20 1180 490 20 17.1
20 1180 490 20 17.1
15 435 25 40 20 5.35
15 490 15 5.2
8 20 8 0.36
Dimenion (cm)
a b c d e f
20 575
20 537.5
20 575
20 537.5
20 410 20 20 420 20
20 305 20 20 315 20
20 370 20 20 380 20
20 410 20 20 420 20
20 305 20 20 315 20
20 370 20 20 380 20
225 165 505
20 19 8
Dimenion (cm)
a b c d e f
20 575 1180 20
20 575 1180 20
20 575 1180 20
165
20 118 575 20
230
105 55 230
20 410 145 305 145
300 230
300 1200 300 30 30 1200
300 1200 300 60 30 1200
300 1200 300 80 30 1200
8 105 8
8 145 8
Total Length
Dimenion (cm) (m)
a b c d e
20 1180 490 20 17.1
20 1180 490 20 17.1
15 435 25 40 20 5.35
15 490 15 5.2
8 20 8 0.36
Dimenion (cm)
a b c d e f
20 575 1180 20
20 575 1180 20
20 575 1180 20
165
20 118 575 20
230
105 55 230
20 410 145 305 145
300 230
300 1200 300 30 30 1200
300 1200 300 60 30 1200
300 1200 300 80 30 1200
8 105 8
8 145 8
0.925 2 1.0175 m2
14.2 0.925 2 26.2700 m2
14.2 1 7.8100 m2
14.2 2 1.9880 m2
14.2 0.075 2 2.1300 m2
Total (120) 4705.86 m2
Total 224.12925 m3
0.925 2 1.456875 m2
1 720 1274.4 m2
Total Length
Dimenion (cm) (m)
a b c d e
8 86 18 2.24
110 160 3.8
160 1.6
Dimenion (cm)
a b c d e f
35
4 10 10 10 10 4
6 105 10 105 6
Total Length
Dimenion (cm) (m)
a b c d e
10 1190 410 10 16.2
8 70 0.86
10 410 1190 10 16.2
8 75 0.91
10 1190 410 10 16.2
8 55 90 85 85 3.31
8 115 25 35 1.91
8 115 28 2.74
10 1190 410 10 16.2
15 135 1.5
Dimenion (cm)
a b c d e f
35
4 10 10 10 10 4
6 105 10 105 6
Total Length
Dimenion (cm) (m)
a b c d e
4 91.4 0.994
4 169.3 1.773
Total 1245.3375 m3
150 4 150 m2
16.5 4 16.5 m2
Total 166.50 m2
15.3 0.05 2 229.5 m3
527.85 ton
0.725 8 1.4587 m2
0.296 8 0.973248 m2
0.526 8 3.0508 m2
150 4 762.6 m2
150 4 438.6 m2
150 4 192 m2
150 4 210 m2
Total 1608.68 m2
0.12 4 72 m2
0.12 6 54 m2
5 unit
10 unit
ak 15m untuk 2 lajur 4 40 unit
4 600 m
22 88 m
Total 688.00 m
edyp.pw2.pnj@gmail.com
EKERJAAN PERSIAPAN
Total Length (m) Number Unit Weight (kg/m) Total Weight (kg)
24 2.22 912.96
24 2.22 912.96
107 2.22 1273.46
107 2.22 1237.75
594 2.22 475.70
Total Weight 4812.84
Total Weight 9625.68
Total Length (m) Number Unit Weight (kg/m) Total Weight (kg)
24 2.22 912.96
24 2.22 912.96
107 2.22 1273.46
107 2.22 1237.75
594 2.22 475.70
Total Weight 4812.84
Total Weight 9625.68
Total Length (m) Number
g h
17.95 10
17.95 8
17.95 12
1.65 0
7.33 14
2.3 14
3.9 8
10.25 160
5.3 90
305 30 33.95 152
305 60 34.55 20
305 80 34.95 0
1.21 0
1.61 0
Number Unit Weight (kg/m) Total Weight (kg)
8 1.04 18.66
6 2.98 68.00
2 1.04 3.33
Total Weight 90.00
Total Weight 21599.15
4 1.04 67.48
152 1.04 96.56
4 1.04 67.48
15 1.04 7.97
2 1.04 33.74
76 1.04 226.36
76 1.04 250.11
8 1.04 134.97
6 2.98 32.21
Total Weight 916.89
Total Weight 110026.4881647
Total Length (m) Number Unit Weight (kg/m) Total Weight (kg)
4 1.04 67.48
76 1.04 68.07
6 1.04 101.23
15 1.04 14.22
2 1.04 33.74
76 1.04 261.98
76 1.04 151.17
76 1.04 216.87
8 1.04 134.97
6 2.98 26.84
Total Weight 1076.56
Total Weight 129,187.576
Total Length (m) Number Unit Weight (kg/m) Total Weight (kg)
10 1.04142025 10.35
5 1.04142025 9.23
Total Weight R1 16148.68
Total Weight R2 2215.73
Total Weight 18364.40
Tulangan Barrier
Utama Ø16 - 300 Panjang Jalan m 150
Berat Jenis kg/m' 1.577536
Panjang 1 Tulangan m 3
Jumlah Tulangan sepanjang 150m Buah 750
Berat Tulangan Kg 177472.8
Berat Tulangan Utama Kg 354945.6
1.58 113.27
1.58 56.63
1.58 141.58
1.58 31.24
1.58 115.63
1.58 21.77
2.22 737.45
2.22 1938.16
1.58 66.89
1.04 106.07
1.04 179.91
1.04 509.57
1.04 108.37
1.04 508.04
Total Weight 4018.16
Total Weight 8036.31
Unit Weight (kg/m) Total Weight (kg)
1.58 113.27
1.58 56.63
1.58 141.58
1.58 31.24
1.58 115.63
1.58 21.77
2.22 737.45
2.22 1938.16
1.58 66.89
1.04 106.07
1.04 179.91
1.04 509.57
1.04 108.37
1.04 508.04
Total Weight 4634.56
Total Weight 9269.12
Unit Weight (kg/m) Total Weight (kg)
1.58 283.17
1.58 226.53
1.58 339.80
1.58 0.00
1.58 161.89
1.58 50.80
2.22 69.41
2.22 3648.30
1.58 752.48
1.04 5374.15
1.04 719.62
1.04 0.00
1.04 0.00
1.04 0.00
Total Weight 11626.14
Total Weight 104635.29
Daftar Kuantitas Proyek Jembatan Pangarengan - Tol Cijago
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengukuran Lokasi Kerja
3 Pemagaran Lokasi Kerja
4 Papan Nama Kerja
5 MCK
6 Kantor Lapangan
7 Material dan Pekerjaan
8 Jadwal Konstruksi
9 Air Kerja
10 Listrik Kerja
11 Perizinan Kerja
12 Mobilisasi dan Demobilisasi
13 Bedeng
14 K3L
II. PEKERJAAN TANAH
1 Galian Tanah Abutment
2 Timbunan Tanah Abutment
3 Pemadatan Tanah Abutment
4 Pekerjaan Mendatangkan Tanah
III. PEKERJAAN STRUKTUR BAWAH
1 Pile Head A1
Bore Pile Ø800 (L=14m)
Pier Beton
Lean Concrate
Abutment
Wing Wall
Pelat Injak
Bekisting
2 PileHead P1
Bore Pile Ø800 (L=17m)
Beton
Bekisting
3 PileHead P2
Bore Pile Ø800 (L=17m)
Beton
Bekisting
4 PileHead P3
Bore Pile Ø800 (L=17m)
Beton
Bekisting
5 PileHead P4
Bore Pile Ø800 (L=17m)
Beton
Bekisting
6 PileHead P5
Bore Pile Ø800 (L=17m)
Beton
Bekisting
7 PileHead P6
Bore Pile Ø800 (L=20m)
Beton
Bekisting
8 PileHead P7
Bore Pile Ø800 (L=20m)
Beton
Bekisting
9 PileHead P8
Bore Pile Ø800 (L=20m)
Beton
Bekisting
10 PileHead P9
Bore Pile Ø800 (L=20m)
Beton
Bekisting
11 PileHead A2
Bore Pile Ø800 (L=14m)
Pier Beton
Lean Concrate
Abutment
Wing Wall
Bekisting
Pelat Injak
Lining Batu Kali
12 Penulangan
Abutment 1
Abutment 2
Wing Wall 1
Wing Wall 2
Pelat Injak 1
Pelat Injak 2
Pier 1
Pier 2
Pier 3
Pier 4
Pier 5
Pier 6
Pier 7
Pier 8
Pier 9
IV. PEKERJAAN STRUKTUR ATAS
1 Diafragma
2 Girder Type 1
3 Girder Type 2
4 RC Plate Type 1
5 RC Plate Type 2
6 Bekisting
7 Penulangan Girder
Tulangan Diafragma
Tulangan Girder Type 1
Strand Girder Type 1
Tulangan Girder Type 2
Strand Girder Type 2
RC Plate Type 1 & 2
V. PEKERJAAN LANTAI JEMBATAN
1 Slab Lantai Jembatan
2 Penulangan Slab Lantai Jembatan
3 Aspal Hotmix
4 Barrier
5 Penulangan Barrier
6 Bekisting
VI. PEKERJAAN UTILITAS
1 Marka Jalan Thermoplastic
Type B-1(menerus)
Type A (putus-putus)
2 Lampu Jalan
Rambu Lalu Lintas
3 Papan Rambu Besar
Papan Rambu Kecil (rambu peringatan)
4 Grill
VII. PEKERJAAN DRAINASE
1 Instalasi Pipa PVC 12"
atan Pangarengan - Tol Cijago 150m
SATUAN KUANTITAS
JAAN PERSIAPAN
m2 2,400.00
m2 3,000.00
m2 264.00
m2 18.00
m2 24.00
m2 48.00
m2 32.00
Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
Ls 1.00
m2 84.00
Ls 1.00
ERJAAN TANAH
m3 333.55
m3 7,249.02
m3 2,625.00
m3 7,249.02
AN STRUKTUR BAWAH
unit 10.00
m3 70.34
m3 5.25
m3 200.31
m3 8.38
m3 31.42
m2 450.44
unit 10.00
m3 138.17
m2 76.28
unit 10.00
m3 138.17
m2 76.28
unit 10.00
m3 138.17
m2 76.26
unit 10.00
m 3 138.17
m2 76.28
unit 10.00
m 3 138.17
m2 76.28
unit 10.00
m 3 153.24
m2 76.28
unit 10.00
m 3 153.24
m2 76.28
unit 10.00
m 3 153.24
m2 76.28
unit 10.00
m 3 153.24
m2 76.28
unit 10.00
m 3 70.34
m3 5.25
m3 200.31
m3 8.38
m2 450.44
m3 31.42
m3 118.52
kg 8,036.31
kg 9,269.12
kg 2,876.83
kg 2,876.83
kg 9,625.68
kg 9,625.68
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
kg 11,626.14
AAN STRUKTUR ATAS
m3 169.92
m3 919.31
m 3 224.13
m3 89.21
m3 17.84
m2 8,915.52
kg 21,599.15
kg 110,026.49
kg 1,952.20
kg 129,187.58
kg 1,952.20
kg 18,364.40
AN LANTAI JEMBATAN
m3 1,245.34
kg 257,720.20
ton 527.85
m3 398.29
kg 359,414.33
m2 1,775.18
ERJAAN UTILITAS
m 72.00
m 54.00
unit 40.00
unit 5.00
unit 10.00
unit 40.00
RJAAN DRAINASE
m 688.00
DAFTAR HARGA SATUAN BARANG
2 Semen
Semen Tiga Roda PC (50kg) kg
Semen Tiga Roda Portland Cement (40kg) kg
Semen Holcim PC (50kg) kg
Semen Holcim Portland Cement (40kg) kg
Semen Gresik PC (50kg) kg
Semen Gresik Portland Cement (40kg) kg
Semen Padang (50kg) kg
Semen Padang (40kg) kg
Semen Putih Tiga Roda kg
3 Batu
Batu Kali Pecah m3
Batu Gamping m3
Batu Pecah ukuran 1-2 cm m3
Batu pecah ukuran 2-3 m3
Batu Bata (oven) bh
Batu split m3
Batako bh
Batu Belah m3
4 Kayu
RENG
Meranti 2 x 3 Batang (4 m)
Meranti 3 x 4 Batang (4 m)
Borneo 2 x 3 Batang (4 m)
Borneo 3 x 4 Batang (4 m)
Kamper 2 x 3 Batang (4 m)
Kamper 3 x 4 Batang (4 m)
KASO
Meranti 4 x 6 Batang (4 m)
Meranti 5 x 7 Batang (4 m)
Borneo 4 x 6 Batang (4 m)
Borneo 5 x 7 Batang (4 m)
Kamper 4 x 6 Batang (4 m)
Kamper 5 x 7 Batang (4 m)
GALAR
Meranti 5 x 10 Batang (4 m)
Borneo 5 x 10 Batang (4 m)
Kamper 5 x 10 Batang (4 m)
BALOK
Meranti 6 x 12 Batang (4 m)
Meranti 8 x 12 Batang (4 m)
Borneo 6 x 12 Batang (4 m)
Borneo 8 x 12 Batang (4 m)
Kamper 6 x 12 Batang (4 m)
Kamper 8 x 12
TRIPLEK Lembar
Tebal 3 mm Lembar
Tebal 4 mm Lembar
Tebal 6 mm Lembar
Tebal 9 mm Lembar
Tebal 12 mm Lembar
Tebal 15 mm Lembar
Tebal 18 mm Lembar
Tebal 21 mm
PAPAN
Kamper 3 x 20 Lembar
Meranti 3 x 20 Lembar
Borneo 3 x 20 Lembar
DOLKEN
sedang 8 x 10 x 400 cm Batang
kecil 6 x 7 x 400 cm Batang
besar 10 x 12 x 400 cm Batang
5 PLYWOOD
Teak wood
90 x 210 x 3 mm lbr
120 x 240 x 3 mm lbr
90 x 210 x 4 mm lbr
90 x 210 x 9 mm lbr
90 x 210 x 12 mm lbr
90 x 210 x 15 mm lbr
90 x 210 x 18 mm lbr
Tripleks
120 x 240 x 3 mm lbr
120 x 240 x 4 mm lbr
120 x 240 x 6 mm lbr
Multitripleks
120 x 240 x 9 mm lbr
120 x 240 x 12 mm lbr
120 x 240 x 15 mm lbr
120 x 240 x 18 mm lbr
6 Tanah
Padas m3
Liat m3
7 Seng
Seng Plat Tebal 0.020 2mx1m
Seng Plat Tebal 0.025 2mx1m
Seng Gelombang 0,02x90x180
Seng Gelombang 0,03x90x180
plat GRC lbr
Asbes Gel uk 180 x 80 x 035 mm 0.5
8 Paku Kayu
Paku Kayu 2 cm kg
Paku Kayu 2,5 cm kg
Paku Kayu 3 cm kg
Paku Kayu 4 cm kg
Paku Kayu 5 cm kg
Paku Kayu 7 cm kg
Paku Kayu 10 cm kg
Paku Kayu 12 cm kg
Paku Beton Putih
Paku Beton 2,5 cm kg
Paku Beton 3 cm kg
Paku Beton 4 cm kg
Paku Beton 5 cm kg
Paku Beton 6 cm kg
Paku Beton 7 cm kg
Paku Beton 10 cm kg
Paku Beton 12,5 cm kg
Paku Beton Hitam
Paku Beton 3 cm kg
Paku Beton 5 cm kg
Paku Beton 7 cm kg
Paku Payung/Seng
Spesifikasi Barang satuan
Paku Payung/Seng 7 cm kg
Paku Payung/Seng 10 cm kg
9 Kerikil
Timbun m3
Sawur/ Koral m3
Beton 0,5/1 m3
Beton 0,1/2 m3
Beton 0,2/3 m3
Biasa m3
Tras Giling m3
10 Besi Tulangan
besi beton ulir kg
Besi Polos Diameter 6mm (12m) batang
Besi Polos Diameter 8mm (12m) batang
Besi Polos Diameter 10mm (12m) batang
Besi Polos Diameter 12mm (12m) batang
Besi Polos Diameter 16mm (12m) batang
Besi Polos Diameter 19mm (12m) batang
Besi Polos Diameter 22mm (12m) batang
Besi Ulir Diameter 10mm (12m) batang
Besi Ulir Diameter 13mm (12m) batang
Besi Ulir Diameter 16mm (12m) batang
Besi Ulir Diameter 19mm (12m) batang
Besi Ulir Diameter 22mm (12m) batang
Besi tulangan kg
Buis beton diameter 80cm buah
Plat Baja kg
Besi Ulir Polos kg
baja siku kg
besi strip kg
11 Buis Beton
d = 10-100cm bh
d = 20-100cm bh
d = 30-100cm bh
d = 50-100cm bh
d = 60-100cm bh
d = 70-100cm bh
U = 10-100cm bh
U = 15-100cm bh
U = 20-100cm bh
U = 30-100cm bh
12 Bahan Besi
BESI BETON
besi beton polos kg
besi beton prestress kg
besi beton ulir kg
BESI PLAT
besi strip kg
BESI PROFIL
besi profil kg
KAWAT
Ikat beton/ bendrat kg
Harmonika 12 x 45 mm m2
Harmonika 12 x 24 mm m2
Harmonika 14 x 30 mm m2
Harmonika 14 x 35 mm m2
Kawat nyamuk nylon m2
Kawat kasa : m2
-saringan pasir m2
-kawat loket m2
-kawat duri rol
kawat bronjong kg
15 Instalasi Air
Closet Jongkok putih CE 6 Toto Unit
Closet Duduk complete set CW702J/SW784JP Unit
Stop Kran bh
Lem Pipa bh
TANGKI AIR MERK PENGUIN 1050 LITER bh
Tower Air (h=3m) buah
sumur peresapan kedalam 3m unit
Pompa Air SHIMIZU PC-250 BIT Jet Pump bh
sewa alat perbulan
pembuatan kebun paket
sewa mobil angkut unit
Wastafel complete-set putih LW660CJ bh
bak fiberglass 55cm bh
bak cuci stainless steel SB 22 (1160 x 430 x 135) bh
Kean air bh
Keran Dinding bh
Floor Drain TX1AN bh
Tempat Sabun S6N bh
Kran Shower bh
Kaki Tangki 500 bh
Alat Pengikat Kayu
Paku uk 1" - 4" kg
Paku payung kg
Paku sekrup doos
Paku beton bh
Mur baut (kuda-kuda) kg
Angkur baut bh
Lem kayu bh
Tali ijuk kg
16 Cat
A. Interior
Dulux Pearl Go (2,5 lt) gln
Dulux Pentalite Standard Colour ( 2,5 lt ) gln
Dulux Weather Shield Exterior/Brilliant white ( 2,5 lt ) gln
Dulux (2,5 lt) gln
Dulux (20 lt) gln
Mowilex (1 lt) gln
Mowilex (2,5 lt) gln
Mowilex (20 lt) gln
Catylac (5 kg) gln
Catylac (25 kg) gln
Avitex (5 kg) gln
Vinilex (5 kg) gln
Vinilex (25 kg) gln
Matex (4 kg) gln
Matex (25 kg) gln
B. Exterior
Dulux (2,5 lt) gln
Dulux (20 lt) gln
Mowilex (2,5 lt) gln
Mowilex (20 lt) gln
C. Cat Dasar
CATYLAC (4kg) gln
CATYLAC (25kg) gln
D. Cat Kayu
V-GLOSS DULUX (2,5 lt) gln
V-GLOSS DULUX (1 lt) gln
Cat Genting kg
Cat Dasar Kayu kg
Cat Kayu Kusen Pintu Avian kg
17 Kusen
Pintu PVC bh
Daun Pintu bh
Daun Jendela bh
Kunci Tanam
Union : 1 x slag bh
2 x slag bh
Yale : 1 x slag bh
2 x slag bh
Kuda : 1 x slag bh
2 x slag bh
20 Aspal
ex Pertamina net 160 kg drum
Hotmix tebal = 4 cm m2
Hotmix tebal = 5 cm m2
Hotmix tebal = 6 cm m2
Hotmix tebal = 7 cm m2
Binder course ton
Aspal Wearing course ton
Hot roller sheet ton
Sand sheet ton
Sand sheet emulsi ton
Cold mix ton
21 Instalasi Listrik
Sumber dari PLN 5400 Wat
Sakelar
Out bauw Seri bh
Engkel bh
In bauw Seri bh
Engkel bh
stop Kontak
Arde Outbow Putih bh
Arde Outbow Hitam bh
Arde IB bh
Arde Putar bh
Kabel Listrik
NYA 1 x 1,5 mm2 m'
SPLN LMK 1 x 2,5 mm2 m'
1 x 4 mm2 m'
1 x 6 mm2 m'
NYY : 2 x 1,5 mm2 m'
PRIMA 2 x 2,5 mm2 m'
2 x 4 mm2 m'
2 x 6 mm2 m'
3 x 1,5 mm2 m'
3 x 2,5 mm2 m'
3 x 4 mm2 m'
3 x 6 mm2 m'
NYM : 2 x 1,5 mm2 m'
PRIMA 2 x 2,5 mm2 m'
2 x 4 mm2 m'
3 x 1,5 mm2 m'
3 x 2,5 mm2 m'
3 x 4 mm2 m'
3 x 6 mm2 m'
kabel tanah NYFGB m'
Lampu Sorot LED 1000W SMD unit
Lampu Neon Philip Jari Essent 36 Wat buah
Solatip roll
Pemboran Tangan m
Penyondiran Ringan titik
Seismik m
Vane Shear Test (VST) per uji
Pengambilan Contoh Asli Tanah tabung
Standpipe Penetrasi (SPT) per uji
Saklar buah
ASPAL
ex Pertamina net 160 kg drum
Hotmix tebal = 4 cm m2
Hotmix tebal = 5 cm m2
Hotmix tebal = 6 cm m2
Hotmix tebal = 7 cm m2
Binder course ton
Aspal Wearing course ton
Hot roller sheet ton
Sand sheet ton
Sand sheet emulsi ton
Cold mix ton
Soket buah
Tee buah
Knee buah
Clamp buah
Kotak P3K+Isi Lengkap Dinding Tembok Plastik Box Kit Tipe C 4Life buah
KRISBOW Safety Helmet non Vented White buah
Harness Safety Belt Tali buah
Sepatu Boot AP Terra Eco 3 buah
SARUNG TANGAN BENANG 5 (MJS) PUTIH TEBAL RAJUT SAFETY TUKANG PROYEK 1 buah
SARUNG TANGAN BENANG BINTIK (MJS) RAJUT TEBAL SAFETY PROYEK TUKANG buah
Kaca Mata Las Safety Bening Clear Kerja Proyek Tukang Working Glasses buah
Tabung Pemadam Kebakaran 9 Kg- VIKING buah
Rp 32,500 3385416.6667 m3
Rp 39,000 2785714.2857 m3
Rp 28,000 2916666.6667 m3
Rp 43,000 3071428.5714 m3
Rp 50,000 5208333.3333 m3
Rp 70,000 5000000 m3
Rp 60,000
Rp 60,000
Rp 95,000
Rp 80,000 2777777.7778 m3
Rp 125,000
Rp 80,000
Rp 100,000
Rp 185,000
Rp 210,000
Rp 42,000
Rp 52,000
Rp 95,000
Rp 110,000
Rp 150,000
Rp 190,000
Rp 200,000
Rp 240,000
Rp 265,000
Rp 120,000
Rp 85,000
Rp 18,000.00
Rp 15,000.00
Rp 26,000.00
Rp 45,000
Rp 87,500
Rp 60,000
Rp 160,000
Rp 180,000
Rp 245,000
Rp 290,000
Rp 45,000
Rp 57,000
Rp 67,000
Rp 110,000
Rp 150,000
Rp 185,000
Rp 220,000
Rp 50,000
Rp 50,000
Rp 31,000
Rp 38,000
Rp 37,000
Rp 46,000
Rp 50,000
Rp 50,000
Rp 18,000
Rp 17,000
Rp 16,000
Rp 15,000
Rp 14,000
Rp 14,000
Rp 14,000
Rp 15,500
Rp 34,000
Rp 34,000
Rp 34,000
Rp 34,000
Rp 32,000
Rp 32,000
Rp 32,000
Rp 32,000
Rp 17,500
Rp 16,000
Rp 14,000
Harga (Rp.)
Rp 25,000
Rp 30,000
Rp 90,000
Rp 160,000
Rp 180,000
Rp 180,000
Rp 170,000
Rp 115,000
Rp 205,000
Rp 18,700
Rp 25,500
Rp 38,500
Rp 60,250
Rp 95,250
Rp 169,250
Rp 218,500
Rp 292,500
Rp 60,250
Rp 101,750
Rp 155,750
Rp 219,500
Rp 293,500
Rp 10,126
Rp 146,025
Rp 11,500
Rp 22,500
Rp 11,500
Rp 16,300
Rp 28,000
Rp 33,000
Rp 42,000
Rp 80,000
Rp 95,000
Rp 130,000
Rp 18,000
Rp 25,000
Rp 32,000
Rp 37,000
Rp 10,500
Rp 17,200
Rp 13,000
Rp 14,000
Rp 14,250
Rp 15,500
Rp 15,500
Rp 17,000
Rp 135,000
Rp 210,000
Rp 310,000
Rp 16,000
Rp 21,000
Rp 22,500
Rp 20,000
Rp 19,000
Rp 10,000
Rp 13,000
Rp 15,000
Rp 12,000
Rp 75,000
Rp 17,000
Rp 110,000
Rp 170,000
Rp 18,000
Rp 22,500
Rp 27,500
Rp 35,000
Rp 60,000
Rp 122,500
Rp 150,000
Rp 325,000
Rp 590,000
Rp 1,010,000
Rp 1,380,000 Rp 345,000
Rp 60,000
Rp 72,500
Rp 459,000
Rp 2,880,000
Rp 95,810
Rp 2,300
Rp 1,750,000
Rp 2,500,000
Rp 1,334,100
Rp 2,340,000
Rp 400,000
Rp 500,000
Rp 350,000
Rp 2,448,000
Rp 220,000
Rp 173,000
Rp 15,000
Rp 235,000
Rp 325,000
Rp 99,000
Rp 53,000
Rp 250,000
Rp 12,000
Rp 16,000
Rp 12,000
Rp 17,000
Rp 13,000
Rp 12,800
Rp 18,000
Rp 6,000
Rp 180,000
Rp 137,000
Rp 215,000
Rp 117,500
Rp 850,000
Rp 60,000
Rp 130,000
Rp 915,000
Rp 93,500
Rp 355,000
Rp 73,500
Rp 75,000
Rp 445,000
Rp 60,000
Rp 295,000
Rp 187,000
Rp 1,285,000
Rp 160,000
Rp 1,250,000
Rp 87,500
Rp 445,000
Rp 180,000
Rp 43,000
Rp 66,300
Rp 36,000
Rp 36,100
Rp 300,000
Rp 500,000
Rp 375,000
Rp 50,000.00
Rp 60,000.00
Rp 75,000.00
Rp 125,000.00
Rp 45,000.00
Rp 60,000.00
Rp 16,000
Rp 2,500
Rp 9,000
Rp 32,000
Rp 8,250
Rp 10,000
Rp 15,000
Rp 350,000
Rp 11,000
Rp 1,400,000
Rp 65,000
Rp 80,000
Rp 95,000
Rp 110,000
Rp 230,000
Rp 150,000
Rp 130,000
Rp 140,000
Rp 160,000
Rp 190,000
Rp 7,452,000
Rp 20,000
Rp 15,000
Rp 16,500
Rp 12,000
Rp 15,000
Rp 6,000
Rp 15,000
Rp 42,000
Rp 3,400
Rp 3,500
Rp 5,500
Rp 7,200
Rp 9,800
Rp 11,000
Rp 17,000
Rp 22,000
Rp 12,200
Rp 16,000
Rp 21,000
Rp 29,000
Rp 7,200
Rp 10,200
Rp 14,250
Rp 9,200
Rp 13,000
Rp 18,200
Rp 25,000
Rp 95,000
Rp 1,200,000
Rp 90,000
Rp 5,000
Rp 120,000
Rp 530,000
Rp 60,000
Rp 150,000
Rp 90,000
Rp 90,000
Rp 15,000
Rp 3,000
Rp 55,000
Rp 85,000
Rp 40,000
Rp 32,500
Rp 1,400,000.00
Rp 65,000.00
Rp 80,000.00
Rp 95,000.00
Rp 110,000.00
Rp 230,000.00
Rp 150,000.00
Rp 130,000.00
Rp 140,000.00
Rp 160,000.00
Rp 190,000.00
Rp 32,000.00
Rp 80,000.00
Rp 370,000.00
Rp 20,000.00
Rp 1,945,000.00
Rp 78,900.00
Rp 218,500.00
Rp 62,000.00
Rp 2,000.00
Rp 3,500.00
Rp 15,000.00
Rp 700,000.00
Rp 500,000.00
Rp 245,000.00
Rp 3,500.00
Rp 4,000.00
Rp 8,500.00
Rp 6,500.00
Rp 2,800.00
Rp 4,000.00
Rp 9,000.00
Rp 3,500.00
Rp 3,000.00
Rp 14,000.00
Rp 19,750.00
Rp 4,000.00
Rp 16,500.00
Rp 85,000.00
Rp 47,000.00
Rp 27,000.00
Rp 21,500.00
Rp 105,000.00
Rp 27,000.00
Rp 21,000.00
Rp 3,500.00
Rp 4,500.00
Rp 11,000.00
Rp 1,500.00
Rp 98,000.00
Rp 102,000.00
Rp 155,000.00
Rp 159,000.00
Rp 255,000.00
Rp 240,000.00
Rp 197,000.00
Rp 174,000.00
Rp 215,000.00
Rp 223,000.00
Rp 155,000.00
Rp 245,000.00
Rp 347,000.00
Rp 260,000.00
Rp 27,500.00
Rp 11,500.00
Rp 19,000.00
Rp 21,000.00
Rp 3,500.00
Rp 7,000.00
Rp 15,000.00
Rp 13,500.00
Rp 11,000.00
Rp 9,500.00
Rp 14,000.00
Rp 41,000.00
Rp 45,000.00
Rp 4,500.00
Rp 3,500.00
Rp 5,300.00
Rp 6,500.00
Rp 13,000.00
Rp 26,000.00
Rp 4,500.00
Rp 35,000.00
Rp 48,000.00
Rp 9,000.00
Rp 45,000.00
Rp 6,000.00
Rp 1,730,000.00
Rp 15,000.00
Rp 20,000.00
Rp 11,750.00
Rp 11,750.00
Rp 29,000.00
Rp 32,500.00
Rp 32,500.00
Rp 35,000.00
Rp 29,000.00
Rp 28,000.00
Rp 2,000.00
Rp 4,000.00
Rp 4,500.00
Rp 3,000.00
Rp 3,000.00
Rp 7,000.00
Rp 12,000.00
Rp 95,000.00
Rp 80,000.00
Rp 90,000.00
Rp 10,000.00
Rp 12,000.00
Rp 20,000.00
Rp 180,000.00
Rp 70,000.00
Rp 12,000.00
Rp 7,000.00
Rp 85,000.00
Rp 10,000.00
Rp 50,000.00
Rp 8,000.00
Rp 15,500.00
Rp 7,000.00
Rp 55,000.00
Rp 33,000.00
Rp 9,000.00
Rp 15,000.00
Rp 22,000.00
Rp 2,000.00
Rp 1,000.00
Rp 11,500.00
Rp 16,500.00
Rp 17,750.00
Rp 23,000.00
Rp 3,500.00
Rp 5,500.00
Rp 9,000.00
Rp 12,000.00
Rp 35,000.00
Rp 14,000.00
Rp 14,000.00
Rp 35,000.00
Rp 4,000.00
Rp 3,000.00
Rp 1,500.00
Rp 2,500.00
Rp 3,000.00
Rp 85,000.00
Rp 55,000.00
Rp 12,000.00
Rp 70,000.00
Rp 5,000.00
Rp 7,500.00
Rp 20,000.00
Rp 23,000.00
Rp 39,000.00
Rp 140,000.00
Rp 33,500.00
Rp 36,000.00
Rp 30,000.00
Rp 245,000.00
Rp 3,000.00
Rp 9,000.00
Rp 11,000.00
Rp 140,000.00
Rp 55,000.00
Rp 85,000.00
Rp 16,000.00
Rp 12,000.00
Rp 7,000.00
Rp 3,000.00
Rp 4,000.00
SATUAN UPAH
Rp 30,000.00
Rp 30,500.00
Rp 31,500.00
Rp 31,500.00
Rp 33,000.00
Rp 36,000.00
Rp 36,000.00
Rp 36,000.00
Rp 37,000.00
Rp 39,000.00
Rp 39,500.00
Rp 47,500.00
Rp 56,000.00
DAFTAR HARGA SEWA PERALATAN
TAHUN 2018
NO. KODE JENIS BARANG SATUAN Pemilikan (Rp.)
1 E1 Dump Truck 3 ton Jam Rp 125,000.00
2 E2 Dump Truck 5 ton Jam Rp 180,000.00
3 E3 Truk Bak Terbuka Jam Rp 125,000.00
4 E4 Truk Tanki Air Jam Rp 150,000.00
5 E5 Bulldozer Jam Rp 400,000.00
6 E6 Motor Grader Jam Rp 180,000.00
7 E7 Wheel Loader Jam Rp 200,000.00
8 E8 Excavator Jam Rp 440,000.00
9 E9 Crane Jam Rp 1,500,000.00
10 E10 Trailler Jam Rp 300,000.00
11 E11 Mesin Gilas Tandem 6-10 ton Jam Rp 140,000.00
12 E12 Mesin Gilas 3 roda 6-10 ton Jam Rp 150,000.00
13 E13 Mesin Gilas Roda Karet 8-10 ton Jam Rp 185,000.00
14 E14 Vibrator Roller Jam Rp 50,000.00
15 E15 Vibro Roller 1 ton Jam Rp 50,000.00
16 E16 Water Pump Jam Rp 20,000.00
17 E17 Asphalt Sprayer Jam Rp 40,000.00
18 E18 Pick Up Jam Rp 50,000.00
19 E19 AMP Jam Rp 3,700,000.00
20 E20 Asphalt Finisher Jam Rp 580,000.00
21 E21 Concrete Vibrator Jam Rp 46,000.00
22 E22 Compressor Jam Rp 115,000.00
23 E23 Concrete Mixer Jam Rp 75,000.00
24 E24 Stamper Jam Rp 40,000.00
25 E25 Genset Jam Rp 180,000.00
26 E26 Alat Pengecat Marka Jam Rp 80,000.00
27 E27 Pneumatic Tyre Roller Jam Rp 170,000.00
28 E28 Road marking machine Jam Rp 8,500.00
29 E29 concrete pump Jam Rp 50,000.00
30 E30 Chain Saw Jam Rp 10,000.00
32 E32 theodolite Buah Rp 2,000,000.00
33 E33 waterpass Buah Rp 10,000,000.00
34 E34 Hydrolic Drop Hammer Jam Rp 150,000.00
DAFTAR HARGA SEWA PERALATAN
TAHUN 2018
Biaya Operasi BP&O No Alat
Rp 500,000.00 Rp 625,000.00 1 Peralatan Kayu
Rp 500,000.00 Rp 680,000.00 2 Scafolding main frame
Rp 500,000.00 Rp 625,000.00 3 Cross Brace
Rp 500,000.00 Rp 650,000.00 4 Base Jack
Rp 500,000.00 Rp 900,000.00 5 Head Jack
Rp 500,000.00 Rp 680,000.00 6 Joint Fin
Rp 500,000.00 Rp 700,000.00 7 Cat Walk
Rp 500,000.00 Rp 940,000.00 8 Stairs
Rp 500,000.00 Rp 2,000,000.00 9 Bar Cuter
Rp 500,000.00 Rp 800,000.00
Rp 500,000.00 Rp 640,000.00
Rp 500,000.00 Rp 650,000.00
Rp 500,000.00 Rp 685,000.00
Rp 500,000.00 Rp 550,000.00
Rp 500,000.00 Rp 550,000.00
Rp 500,000.00 Rp 520,000.00
Rp 500,000.00 Rp 540,000.00
Rp 500,000.00 Rp 550,000.00
Rp 500,000.00 Rp 4,200,000.00
Rp 500,000.00 Rp 1,080,000.00
Rp 500,000.00 Rp 546,000.00
Rp 500,000.00 Rp 615,000.00
Rp 500,000.00 Rp 575,000.00
Rp 500,000.00 Rp 540,000.00
Rp 500,000.00 Rp 680,000.00
Rp 500,000.00 Rp 580,000.00
Rp 500,000.00 Rp 670,000.00
Rp 500,000.00 Rp 508,500.00
Rp 150,000.00 Rp 200,000.00
Rp 10,000.00 Rp 20,000.00
Rp 1,550,000.00 Rp 35,500,000.00
Rp 3,000,000.00 Rp 13,000,000.00
Rp 500,000.00 Rp 650,000
Satuan Harga
lot Rp 500,000.00
buah/bulan Rp 14,000.00
buah Rp 8,800.00
buah Rp 11,000.00
buah Rp 9,500.00
buah Rp 3,300.00
buah Rp 15,800.00
buah Rp 23,500.00
Jam Rp 15,000.00
EXCAVATOR
Tanah Liat Berpasir (factor bucket) =
Material yang ditangkap mangkok (q) =
Mengisi mangkok=
Putar membuang =
waktu siklus Membuang ketempat pembuangan =
Putar posisi awal =
Total (Cm) =
Produksi / Jam =
1 hari kerja =
Produksi / hari =
Koefiensi
BOMAG =
Lebar Roda (W) =
Kecepatan Maju Mundur =
Jumlah Laluan =
Lebar effective (We) =
Produksi / Jam =
Koef =
Dump Truck
Kapasitas bak =
Jarak angkut rata-rata =
Kecepatan rata-rata pergi =
Kecepatan rata-rata kembali =
Waktu menumpahkan =
Waktu Silkus (Cm) =
Mengisi Bak =
Pergi =
Menumpahkan =
Kembali =
Waktu Silkus (Cm) =
Produksi Dump Truck /jam
Koefisiensi
Qdt / jam = 17.764
Jumlah Dump Truck = 5
Truck Mixer
Jenis Mixer 16 S 16 S
Semen : 4.30
Air : 104
Kebutuhan material =
Agregat Kasar : 0.64
Agregat Halus : 0.42
Setiap Pengadukan semen : 2.55 zak
BULLDOZER
a. Alat Buldozer Cartepillar D6D Metode Kerja
b. Tipe Blade Straight Kecepatan Maju
c. Panjang 3.2 m Kecepatan Mundur
d. Tinggi 1.13 m Operator
e. Kapasitas Blade (B) 4.09 m³ Waktu
5.1076 Lm³ Jarak
TANDEM ROLLER
a. Kecepatan rata-rata
b. Lebar efektif pemadatan
c. Jumlah lintasan
d. Faktor Efisiensi alat
Kapasitas Produksi
(V x 1000) x b x t x Fa
n
Koefisien
)= 1
ng ditangkap mangkok (q) = 0.95 0.95 m3
12 detik
5 detik
5 detik
5 detik
27 detik
95.0 m3/jam
7 jam
665 m3
0.0105263158
2m
3 km/jam 3000 m/jam
4 kali
90%
1012.5 m2/jam
0.0009876543
7 m3
6 km
45 km /jam
60 km/jam
25 detik
3.32 menit
8 menit
0.4166666667 menit
6 menit
17.73 menit 1063.9474 detik
0.056 8
m3 /jam
buah
zak
kg
m3
m3
12.5581395349
12.5581395349
0.25 menit
1 menit
0.25 menit
0.1 menit
1.6 menit
37.5 Pengadukan
17.4 m3/jam
0.057
Kecepatan = 7 km/jam
80438.4 kg/jam
: 2.00 KM / Jam
: 1.00 M
: 8.00 lintasan
: 0.83 -
: 145.25 M3/jam
: 0.0068847
NO KOEFISIEN SATUAN
I. PEKERJAAN PERSIAPAN
0.0024 OH
0.0357 OH
0.0714 OH
1
0.0357 Jam
0.0238 OH
0.0476 OH
0.0024 OH
2
0.0238 Buah
1.2 lembar
0.0139 m3
0.043 kg
3
0.0714 OH
0.0036 OH
0.0036 OH
0.0357 OH
4 1 buah
6 buah
0.01 m3
6 kg
1.75 batang
1.2 lembar
0.024 kg
5
0.0214285714 OH
0.4285714286 OH
0.1071428571 OH
0.0107142857 OH
1.2 lembar
1.75 batang
0.255 kg
35 kg
0.15 m3
0.1 m3
0.15 m3
1.1 kg
30 bh
0.25 lembar
0.2 bh
6
0.15 bh
0.08 m2
0.004 OH
0.036 OH
0.012 OH
0.036 OH
0.071 OH
0.004 OH
0.004 OH
1.75 batang
1.2 lembar
0.225 kg
7
35 kg
1.2 lembar
7
0.004 OH
0.036 OH
0.004 OH
0.071 OH
8 1 buah
1 buah
5 batang
1 buah
1 buah
4 buah
9
0.1071428571 OH
0.4285714286 OH
0.0428571429 OH
2.1428571429 OH
5440 wat
11 m
5 Roll
2 buah
2 buah
5 buah
10 4 buah
0.7142857143 OH
1.4285714286 OH
0.0357142857 OH
1 Jam
12
1.75 batang
1.2 lembar
0.025 kg
1.2 lembar
0.030 m3
18.00 kg
13 0.05 m3
0.0035714286 OH
0.0357142857 OH
0.0035714286 OH
0.0714285714 OH
14 1 buah
11 1 buah
0.0714 OH
0.0024 OH
0.0105 OH
1
0.0105 OH
1
0.0105 jam
0.0105 jam
0.0105 OH
0.0105 OH
0.0714 OH
2 0.0036 OH
0.0105 jam
0.0105 OH
0.0105 OH
3
0.0105 jam
0.10714 OH
0.00357 OH
0.01050 OH
0.01050 OH
4
0.01050 jam
0.01050 jam
448 kg
0.4764 m3
0.7407 m3
2.14 OH
1 0.357 OH
0.0357 OH
0.107 OH
0.095 jam
0.095 jam
276 kg
0.59 m3
0.74 m3
1.65 OH
2
0.275 OH
0.028 OH
0.083 OH
0.095 Jam
0.357 Jam
0.357 OH
3
1.786 OH
1 Tiang
1.1 kg
0.02 kg
4
0.07 OH
0.007 OH
0.07 OH
0.0035 OH
110 kg
10.5 kg
1 kg
0.05 OH
5
0.05 OH
0.005 OH
0.0025 OH
0.05 hari
1.2 m3
205 kg
0.485 m3
0.75 OH
5
0.075 OH
1.5 OH
0.075 OH
0.095 Jam
0.04 m3
0.4 kg
0.2 Liter
0.015 m3
0.3 Lembar
0.025 lot
2 buah
2 buah
6
6 4 buah
4 buah
4 buah
1 buah
0.167 buah
0.66 OH
0.33 OH
0.033 OH
0.033 OH
0.347 Lembar
0.015 m3
0.4 kg
0.2 liter
0.66 OH
0.33 OH
0.033 OH
0.033 OH
0.04 m3
0.4 kg
0.2 Liter
0.015 m3
0.025 lot
2
0.09 OH
0.083 OH
0.0083 OH
0.0045 OH
0.0336 m3
0.0149 m3
4.8015 kg
6.615 kg
0.0024 OH
0.0241 OH
3
0.0024 jam
0.0016 jam
0.0385 jam
0.003 jam
0.0018 jam
0.0025 jam
1 set
V . PEKERJAAN UTILITAS
0.0107 OH
0.0857 OH
0.0321 OH
2 buah
1 buah
1 buah
1 2 m'
1 m'
1 LS
1 LS
1 LS
1 LS
0.5 jam
2.8 kg
0.5 kg
0.014 OH
0.014 OH
2
0.014 OH
0.0275 OH
0.05 Jam
0.05 Jam
1 set
1 set
1 LS
3
0.0595238095 OH
0.005952381 OH
0.1071428571 OH
0.0035714286 OH
2 set
1 set
1 LS
4
0.0595238095 OH
0.005952381 OH
0.1071428571 OH
0.0035714286 OH
1 unit
5
1 Ls
VI . PEKERJAAN DRAINASE
1.2 m
1
0.0600 OH
0.0060 OH
0.0360 OH
0.0018 OH
URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1m2 Pembersihan Lokasi
Tenaga
Mandor
Tukang Tebas
Pekerja
Jumlah Tenaga
Alat
Alat Chainsaw
Jumlah Alat
Jumlah
Jumlah
1m2 Pengukuran Lokasi Kembali
Tenaga
Juru Ukur
Pembantu Juru Ukur
Mandor
Jumlah Tenaga
Alat
Theodolite
Jumlah Alat
Jumlah
Jumlah
1m Pemagaran Lokasi
Bahan
Seng Gelombang
Kayu Dolken kecil 6 x 7 x 400 cm
Paku Kayu 7 cm
Jumlah
Tenaga
Pekerja
Mandor
Kepala Tukang Kayu
Tukang Kayu
Jumlah
Jumlah
Jumlah
1m2 Pemasangan Papan Nama Proyek
Bahan : Print Banner
Jumlah
1m2 Pengadaan MCK
Bahan
Closet Jongkok
Pasir Pasang
Semen Portland Holcim
Kayu Kaso Meranti 4x6
Seng Gelombang
Paku Kayu 7 cm
Jumlah Bahan
Tenaga
Mandor
Pekerja
Tukang Ledeng
Kepala Tukang Ledeng
Jumlah Tenaga
Jumlah
1m2 Pembuatan Kantor Lapangan
Bahan
Plywood 120 x 240 x 12 mm
Kayu Balok Meranti (6x12)
Paku Kayu 12cm
Semen Portland Holcim 50kg
Pasir Pasang
Pasir Beton
Koral Beton
Besi Strip
Batu Bata
Seng Plat Tebal 0.025
Jendela Naco
Kunci Tanam (Union 2xslag)
Kaca Polos 5mm
Jumlah Bahan
Tenaga
Mandor
Tukang Kayu
Tukang Cat
Tukang Batu
Pekerja
Kepala Tukang Kayu
Kepala Tukang Batu
Jumlah Tenaga
Jumlah
1m2 Pengadaan Material dan Pekerjaan
Bahan
Kayu Kaso Meranti 4x6
Kayu Triplek 4mm
Paku Kayu 12cm
Semen Portland Holcim 50kg
Seng Gelombang 0,03x90x180
Jumlah Bahan
Tenaga
Mandor
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Jumlah Tenaga
Jumlah
1m2 Pemasangan Jadwal Konstruksi
Bahan : Print Banner
Jumlah
Pengadaan Air Kerja (LS)
Bahan
Pompa Air SHIMIZU PC-250 BIT Jet Pump
Pipa PVC DN 20 (0,5") AW JIS
Tower Air (h=3m)
TANGKI AIR MERK PENGUIN 1050 LITER
Keran Air
Jumlah Bahan
Tenaga
Mandor
Tukang Ledeng
Kepala Tukang Ledeng
Pekerja
Jumlah Tenaga
Jumlah
Pengadaan Penerangan & Tenaga Listrik
Sumber Listrik dari PLN 5440 wat
Kabel NYY 3 x 2,5 mm2
Solatip
Saklar
Stop Kontak
Lampu Neon Philip Jari Essent 36 Wat
Lampu Sorot LED 1000W SMD
Jumlah Bahan
Tenaga
Pekerja Instalator
Pembantu Instalator
Mandor
Jumlah Tenaga
Jumlah
Mobilisasi dan Demobilisasi
Jumlah
1m2 Pembuatan Bedeng
Bahan
Kayu Balok Meranti(8x12)
Kayu Triplek 6mm
Paku Kayu 12cm
Seng Gelombang 0,03x90x180
Pasir Beton
Semen Portland Holcim 50kg
Koral Beton
Jumlah Bahan
Tenaga
Mandor
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Jumlah Tenaga
Jumlah
Pengadaan K3L
APD + Alat K3L
Jumlah
Pengadaan Perizinan Kantor
Jumlah
II. PEKERJAAN TANAH
1m3 Pekerjaan Galian Tanah Abutment
Tenaga
Pekerja
Mandor
Operator Alat Berat
Pembantu Operator Alat Berat
Jumlah Tenaga
Alat
Excavator
Dumptruck 5 ton
Jumlah Alat
Jumlah
1m3 Timbunan Tanah Abutment
Tenaga
Operator Alat Berat
Pembantu Operator Alat Berat
Pekerja
Mandor
Jumlah Tenaga
Alat
Excavator
Jumlah Alat
Jumlah
1m3 Pemadatan Tanah Abutment
Tenaga
Operator Alat Berat
Pembantu Operator Alat Berat
Jumlah Tenaga
Alat
Mesin Gilas Tandem 6-10 ton
Jumlah Alat
Jumlah
1m3 Pekerjaan Mendatangkan Tanah
Tenaga
Pekerja
Mandor
Operator Alat Berat
Pembantu Operator Alat Berat
Jumlah Tenaga
Alat
Dump Truck 5 ton
Excavator
Jumlah Alat
Jumlah
III . PEKERJAAN STRUKTUR
1m3 Pekerjaan Pengecoran Pier , Abutment, Wing Wall, Pelat Injak K350
Bahan
Portland Cement Holcim
Pasir Beton
Kerikil
Jumlah Bahan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah Tenaga
Alat
Concrete Mixer
Concrete Pump
Jumlah Alat
Jumlah
1m3 Pekerjaan Lean Concrete K125
Bahan
Portland Cement Holcim
Pasir Beton
Kerikil
Jumlah Bahan
Tenaga
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
Jumlah Bahan
Alat
Concrete Mixer
Jumlah Alat
Jumlah
Pemancangan Spun Pile
Hydrolic Drop Hammer
Operator alat
Pembantu operator
Spun Pile
Jumlah
1kg Pekerjaan Penulangan
Bahan
Besi Beton Ulir
Kawat Beton
Jumlah Bahan
Tenaga
Tukang Besi
Kepala Tukang Besi
Pekerja
Mandor
Jumlah Tenaga
Jumlah
Pembesian 100 kg Kabel Prestressed
Bahan
Kabel Prestress
Besi Beton
Kawat Beton
Jumlah Bahan
Tenaga
Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor
Jumlah Tenaga
Alat
Jack Tension
Jumlah Alat
Jumlah
1m3 Pekerjaan Lining Batu Kali (1PC:3PSR)
Bahan
Batu Kali
Portland Cement Holcim
Pasir Beton
Jumlah Bahan
Tenaga
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
Jumlah Tenaga
Alat
Concrete Mixer
Jumlah Alat
Jumlah
1m2 Pekerjaan Bekisting
Bahan
Kayu papan Meranti uk. 2x30x400
Paku 5-12 cm
Minyak Bekisting
Kayu Balok Meranti 8x12x400 cm
Plywood uk. 120 mm x 240 mm x 9 mm
Peralatan
Jumlah Bahan
Alat
Scafolding main frame
Cross Brace
Base Jack
Head Jack
Joint Fin
Cat Walk
Stairs
Jumlah Alat
Tenaga
Pekerja
Tukang Bekisting
Kepala Tukang Bekisting
Mandor
Jumlah Tenaga
Jumlah
IV . PEKERJAAN LANTAI JEMBATAN
1m2 Pekerjaan Bekisting untuk Perkerasan Beton
Bahan
Plywood 9mm
Balok Kayu 8 x 12 (4meter)
Paku 12 cm
Minyak Bekisting
Jumlah Bahan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
Jumlah Tenaga
Jumlah
1m2 Pekerjaan Bekisting Concrete Barrier
Bahan
Kayu papan Meranti uk. 2x30x400
Paku 12 cm
Minyak Bekisting
Kayu BalokMeranti 8x12x400 cm
Peralatan
Jumlah Bahan
Tenaga
Pekerja
Tukang Bekisting
Kepala Tukang Bekisting
Mandor
Jumlah Tenaga
Jumlah
1m2 Pekerjaan Lapisan AC
Bahan
Agregat Kasar
Agregat Halus
Filler (Semen Portland)
Aspal Hotmix Tebal 6 cm
Jumlah Bahan
Tenaga
Mandor
Pekerja
Jumlah Tenaga
Alat
Sewa Asphalt Mixing Plant
Sewa Wheel Loader 10-15 HP
Sewa Dump Truck 8-10 m3
Sewa Asphalt Finshiner
Sewa Tendem Roller
Sewa Tire Roller
Sewa Alat Bantu
Jumlah Alat
Jumlah
V . PEKERJAAN UTILITAS
Pekerjaan PJU
Tenaga
Mandor
Pekerja
Tukang Listrik
Jumlah Tenaga
Bahan
Modul solar Cell 80 Wp (160 Wp)
Baterai solar 12 VDC- 120 Ah VRLA dan box batery panel outdoor powder coating
Regulator Automatic System 12 V - 20 A
Lampu-Lumens : +- (3500lm) Warna lampu Pure White / Warm
Kabel lampu (NYHY 2x 1,5 mm ) + kabel modul ( NYHY 3 x4 mm) + kabel Batery
Modul Support + Bracket+aksesori
Tiang lampu Double Arm (angkur, baut, cover and base plate uk 300 x 300 16mm)
Pekerjaan Pondasi
Peralatan Listrik
Jumlah Bahan
Alat
Lift Car
Jumlah Alat
Jumlah
1 m Pekerjaan Marka Jalan Dengan Thermoplastic
Bahan
Thermoplastic
Glass Beed
Jumlah Bahan
Tenaga
Mandor
Operator
Pengemudi
Pekerja
Jumlah Tenaga
Alat
Cargo Truck 5,0 ton
Road Marking Machine
Jumlah Alat
Jumlah
1 Papan Rambu Kecil
Bahan
Papan Alumunium 2 mm (dilapisi Sticker Scotlite 2 lapis )
Tiang (tinggi 1 m , diameter 1.5 , base plate, dan 4 angkur)
Pondasi
Jumlah Bahan
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor
Jumlah Tenaga
Jumlah
1 Papan Rambu Besar
Bahan
Tiang (tinggi 5 m , diameter 4 inchi , base plate, dan 4 angkur)
Papan Alumunium 2 mm (dilapisi Sticker Scotlite 2 lapis )
Pondasi
Jumlah Bahan
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor
Jumlah Tenaga
Jumlah
1 Unit Pemasangan Grill
Grill Tangkapan Air
Ongkos Pemasangan
Jumlah
VI . PEKERJAAN DRAINASE
1m Pemasangan Pipa PVC
Bahan
Pipa PVC 12''
Perlengkapan
Jumlah Bahan
Tenaga
Tukang
Kepala Tukang
Pekerja
Mandor
Jumlah Tenaga
Jumlah
HARGA SATUAN JUMLAH HARGA
Rp 200,000 Rp 476
Rp 140,000 Rp 5,000
Rp 110,000 Rp 7,857
Rp 13,333
Rp 10,000 Rp 357
Rp 357
Rp 13,690
Rp 13,690
Rp 200,000 Rp 4,762
Rp 110,000 Rp 5,238
Rp 200,000 Rp 476
Rp 10,476
Rp 285,714 Rp 6,803
Rp 6,803
Rp 17,279
Rp 17,279
Rp 37,000 Rp 44,400
Rp 15,000 Rp 208
Rp 14,000 Rp 600
Rp 45,208
Rp 110,000 Rp 7,857
Rp 200,000 Rp 714
Rp 165,000 Rp 589
Rp 140,000 Rp 5,000
Rp 14,161
Rp 59,369
Rp 10,000 Rp 10,000
Rp 10,000
Rp 459,000 Rp 2,754,000
Rp 260,000 Rp 2,600
Rp 56,000 Rp 336,000
Rp 32,500 Rp 56,875
Rp 37,000 Rp 44,400
Rp 14,000 Rp 333
Rp 3,194,208
Rp 200,000 Rp 4,286
Rp 110,000 Rp 47,143
Rp 140,000 Rp 15,000
Rp 165,000 Rp 1,768
Rp 68,196
Rp 3,262,405
Rp 150,000 Rp 180,000
Rp 80,000 Rp 140,000
Rp 15,500 Rp 3,953
Rp 1,340 Rp 46,900
Rp 260,000 Rp 39,000
Rp 265,000 Rp 26,500
Rp 160,000 Rp 24,000
Rp 14,000 Rp 15,400
Rp 600 Rp 18,000
Rp 38,000 Rp 9,500
Rp 11,000 Rp 2,200
Rp 60,000 Rp 9,000
Rp 72,500 Rp 5,800
Rp 520,253
Rp 200,000 Rp 714
Rp 140,000 Rp 5,000
Rp 140,000 Rp 1,667
Rp 140,000 Rp 5,000
Rp 110,000 Rp 7,857
Rp 165,000 Rp 589
Rp 165,000 Rp 589
Rp 21,417
Rp 541,669
Rp 32,500 Rp 56,875
Rp 52,000 Rp 62,400
Rp 15,500 Rp 3,488
Rp 1,340 Rp 46,900
Rp 46,000 Rp 55,200
Rp 224,863
Rp 200,000 Rp 714
Rp 140,000 Rp 5,000
Rp 165,000 Rp 589
Rp 110,000 Rp 7,857
Rp 14,161
Rp 239,023
Rp 10,000 Rp 10,000
Rp 10,000
Rp 2,340,000 Rp 2,340,000
Rp 18,000 Rp 90,000
Rp 2,500,000 Rp 2,500,000
Rp 1,750,000 Rp 1,750,000
Rp 15,000 Rp 60,000
Rp 6,740,000
Rp 200,000 Rp 21,429
Rp 140,000 Rp 60,000
Rp 165,000 Rp 7,071
Rp 110,000 Rp 235,714
Rp 324,214
Rp 7,064,214
Rp 7,452,000 Rp 7,452,000
Rp 16,000 Rp 176,000
Rp 5,000 Rp 25,000
Rp 20,000 Rp 40,000
Rp 15,000 Rp 30,000
Rp 90,000 Rp 450,000
Rp 1,200,000 Rp 4,800,000
Rp 12,973,000
Rp 165,000 Rp 117,857
Rp 140,000 Rp 200,000
Rp 200,000 Rp 7,143
Rp 325,000
Rp 13,298,000
Rp 100,000,000
Rp 100,000,000
Rp 125,000 Rp 218,750
Rp 95,000 Rp 114,000
Rp 15,500 Rp 388
Rp 46,000 Rp 55,200
Rp 265,000 Rp 7,950
Rp 1,340 Rp 24,120
Rp 160,000 Rp 8,000
Rp 428,408
Rp 200,000 Rp 714
Rp 140,000 Rp 5,000
Rp 165,000 Rp 589
Rp 110,000 Rp 7,857
Rp 14,161
Rp 442,568
Rp 3,024,900 Rp 3,024,900
Rp 3,024,900
Rp -
Rp -
1 PC : 3 PS
1.2 m3
Rp 110,000 Rp 7,857 203 kg
Rp 200,000 Rp 476 0.49 m3
Rp 200,000 Rp 2,100
Rp 110,000 Rp 1,155 1.2 OH
Rp 11,588 0.4 OH
0.04 OH
Rp 440,000 Rp 4,620 0.06 OH
Rp 180,000 Rp 1,890
Rp 6,510
Rp 18,098
Beton 1 PC : 2PB : 3BP
Rp 180,000 Rp 1,890
Rp 440,000 Rp 4,620 1 m2 pasang dinding batu bata campuran
Rp 6,510 65 Buah
Rp 22,265 11.733 kg
0.028 m3
0.429 OH
Rp 1,340 Rp 600,320 0.143 OH
Rp 265,000 Rp 126,254
Rp 255,000 Rp 188,889
Rp 915,462 1 m2 plesteran dinding tebal 1.5 cmbatu ba
10.714 kg
Rp 110,000 Rp 235,714 0.017 m3
Rp 140,000 Rp 50,000
Rp 165,000 Rp 5,893 OH
Rp 200,000 Rp 21,429 OH
Rp 313,036
1 m2 Acian
Rp 75,000 Rp 7,143 3 kg
Rp 50,000 Rp 4,762
Rp 11,905 0.107 OH
Rp 1,240,403 0.107 OH
0.0107 OH
0.0054 OH
Rp 1,340 Rp 369,840
Rp 265,000 Rp 156,729 1 m2 pasang batako 1 PC : 4 PSR
Rp 255,000 Rp 188,700 12.5 Buah
Rp 715,269 4.9055 kg
0.0157 m3
Rp 110,000 Rp 181,500
Rp 140,000 Rp 38,500 0.107 OH
Rp 165,000 Rp 4,620 0.107 OH
Rp 200,000 Rp 16,600 0.0107 OH
Rp 241,220 0.0054 OH
Rp 18,700 Rp 20,570
Rp 16,000 Rp 320
Rp 20,890
Rp 140,000 Rp 9,800
Rp 165,000 Rp 1,155
Rp 110,000 Rp 7,700
Rp 200,000 Rp 700
Rp 19,355
Rp 40,245
Rp 40,000 Rp 4,400,000
Rp 18,700 Rp 196,350
Rp 16,000 Rp 16,000
Rp 4,612,350
Rp 110,000 Rp 5,500
Rp 140,000 Rp 7,000
Rp 165,000 Rp 825
Rp 200,000 Rp 500
Rp 13,825
Rp 295,000 Rp 14,750
Rp 14,750
Rp 4,640,925
Rp 250,000 Rp 300,000
Rp 1,340 Rp 274,700
Rp 265,000 Rp 128,525
Rp 703,225
Rp 140,000 Rp 105,000
Rp 165,000 Rp 12,375
Rp 110,000 Rp 165,000
Rp 200,000 Rp 15,000
Rp 297,375
Rp 75,000 Rp 7,143
Rp 1,007,743
Rp 5,000,000 Rp 200,000
Rp 15,500 Rp 6,200
Rp 10,000 Rp 2,000
Rp 4,500,000 Rp 67,500
Rp 160,000 Rp 48,000
Rp 500,000 Rp 12,500
Rp 336,200
Rp 14,000 Rp 28,000
Rp 8,800 Rp 17,600
Rp 11,000 Rp 44,000
Rp 9,500 Rp 38,000
Rp 3,300 Rp 13,200
Rp 15,800 Rp 15,800
Rp 23,500 Rp 3,917
Rp 160,517
Rp 110,000 Rp 72,600
Rp 140,000 Rp 46,200
Rp 165,000 Rp 5,445
Rp 200,000 Rp 6,600
Rp 130,845
Rp 627,562
Rp 110,000 Rp 38,170
Rp 125,000 Rp 1,875
Rp 15,500 Rp 6,200
Rp 10,000 Rp 2,000
Rp 48,245
Rp 110,000 Rp 72,600
Rp 140,000 Rp 46,200
Rp 165,000 Rp 5,445
Rp 200,000 Rp 6,600
Rp 130,845
Rp 179,090
Rp 120,000 Rp 4,800
Rp 15,500 Rp 6,200
Rp 10,000 Rp 2,000
Rp 125,000 Rp 1,875
Rp 500,000 Rp 12,500
Rp 27,375
Rp 110,000 Rp 9,900
Rp 140,000 Rp 11,620
Rp 165,000 Rp 1,370
Rp 200,000 Rp 900
Rp 23,790
Rp 51,165
Rp 250,000 Rp 8,400
Rp 260,000 Rp 3,874
Rp 1,400 Rp 6,722
Rp 95,000 Rp 628,425
Rp 647,421
Rp 200,000 Rp 480
Rp 110,000 Rp 2,651
Rp 3,131
Rp 500,000 Rp 1,200
Rp 200,000 Rp 320
Rp 185,000 Rp 7,123
Rp 580,000 Rp 1,740
Rp 50,000 Rp 90
Rp 170,000 Rp 425
Rp 500,000 Rp 500,000
Rp 510,898
Rp 1,161,450
Rp 200,000 Rp 2,140
Rp 110,000 Rp 9,427
Rp 140,000 Rp 4,494
Rp 16,061
Rp 2,000,000 Rp 4,000,000
Rp 2,500,000 Rp 2,500,000
Rp 1,750,000 Rp 1,750,000
Rp 1,500,000 Rp 3,000,000
Rp 650,000 Rp 650,000
Rp 800,000 Rp 800,000
Rp 3,500,000 Rp 3,500,000
Rp 375,000 Rp 375,000
Rp 50,000 Rp 50,000
Rp 16,625,000
Rp 75,000 Rp 37,500
Rp 37,500
Rp 16,678,561
Rp 40,000 Rp 112,000
Rp 32,500 Rp 16,250
Rp 128,250
Rp 200,000 Rp 2,800
Rp 200,000 Rp 2,800
Rp 110,000 Rp 1,540
Rp 110,000 Rp 3,025
Rp 10,165
Rp 150,000 Rp 7,500
Rp 700,000 Rp 35,000
Rp 42,500
Rp 180,915
Rp 450,000 Rp 450,000
Rp 650,000 Rp 650,000
Rp 375,000 Rp 375,000
Rp 1,475,000
Rp 140,000 Rp 8,333
Rp 165,000 Rp 982
Rp 110,000 Rp 11,786
Rp 200,000 Rp 714
Rp 21,815
Rp 1,496,815
Rp 3,000,000 Rp 6,000,000
Rp 450,000 Rp 450,000
Rp 375,000 Rp 375,000
Rp 6,825,000
Rp 140,000 Rp 8,333
Rp 165,000 Rp 982
Rp 110,000 Rp 11,786
Rp 200,000 Rp 714
Rp 21,815
Rp 6,846,815
Rp 550,000 Rp 550,000
Rp 150,000 Rp 150,000
Rp 700,000
Rp 345,000 Rp 414,000
Rp 144,900
Rp 558,900
Rp 140,000 Rp 8,400
Rp 165,000 Rp 990
Rp 110,000 Rp 3,960
Rp 200,000 Rp 360
Rp 13,710
Rp 572,610
g pekerjaan pagar
Batu Kali Rp 250,000 Rp 300,000
PC Rp 1,340 Rp 272,020
PS Rp 260,000 Rp 127,400
Pekerja Rp 110,000 Rp 132,000
Tukang Batu Rp 140,000 Rp 56,000
Kepala Tukang Batu Rp 165,000 Rp 6,600
Mandor Rp 200,000 Rp 12,000
Rp 906,020
PC Rp 1,360 Rp 464,440
PB Rp 265,000 Rp 137,800
Batu Pecah Rp 255,000 Rp 209,100
Rp 1,108,536
PC Rp 1,360 Rp 375,360
Pasir Beton (PB) Rp 265,000 Rp 156,729
Batu Kerikil Rp 255,000 Rp 188,700
Rp 969,151
Pekerja
Tukang Batu
plesteran dinding tebal 1.5 cmbatu bata campuran 1 PC : 2 PSR (0.5 bata)
PC
PSR
Pekerja
Tukang Batu
1 m2 Acian
PC
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Pekerja
Tukang Batu
Kepala Tukang
Mandor
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengukuran Lokasi Kerja
3 Pemagaran Lokasi Kerja
4 Papan Nama Kerja
5 MCK
6 Kantor Lapangan
7 Material dan Pekerjaan
8 Jadwal Konstruksi
9 Air Kerja
10 Listrik Kerja
11 Perizinan Kerja
12 Mobilisasi dan Demobilisasi
13 Bedeng
14 K3L
SATUAN KUANTITAS
JAAN PERSIAPAN
m2 2,400.00 Rp 13,690.48 Rp 32,857,142.86
m2 3,000.00 Rp 17,278.91 Rp 51,836,734.69
m2 264.00 Rp 59,368.61 Rp 15,673,314.17
m2 18.00 Rp 10,000.00 Rp 180,000.00
m2 24.00 Rp 3,262,404.76 Rp 78,297,714.29
m2 48.00 Rp 541,669.17 Rp 26,000,120.00
m2 32.00 Rp 239,023.21 Rp 7,648,742.86
Ls 1.00 Rp 10,000.00 Rp 10,000.00
Ls 1.00 Rp 7,064,214.29 Rp 7,064,214.29
Ls 1.00 Rp 13,298,000.00 Rp 13,298,000.00
Ls 1.00 Rp 3,000,000.00 Rp 3,000,000.00
Ls 1.00 Rp 100,000,000.00 Rp 100,000,000.00
m2 84.00 Rp 442,568.21 Rp 37,175,730.00
Ls 1.00 Rp 3,024,900.00 Rp 3,024,900.00
Rp 376,066,613.15
ERJAAN TANAH
m3 333.55 Rp 18,098.33 Rp 6,036,699.08
m3 7,249.02 Rp 16,446.43 Rp 119,220,546.55
m3 2,625.00 Rp 4,725.00 Rp 12,403,125.00
m3 7,249.02 Rp 22,265.00 Rp 161,399,507.34
Rp 299,059,877.97
AN STRUKTUR BAWAH
Total Penulangan
Rp 42,167,113,814.83
Total Bekisting
Rp 6,999,971,993.76
Rekapitulasi Proyek Jembatan Pangarengan - Tol Cijago
PEKERJAAN HARGA
I. PEKERJAAN PERSIAPAN Rp 376,066,613
II. PEKERJAAN TANAH Rp 299,059,878
III. PEKERJAAN STRUKTUR BAWAH Rp 10,149,901,230
IV. PEKERJAAN STRUKTUR ATAS Rp 18,773,619,952
V. PEKERJAAN LANTAI JEMBATAN Rp 27,786,916,869
VI. PEKERJAAN UTILITAS Rp 767,139,962
VII. PEKERJAAN DRAINASE Rp 393,955,680
JUMLAH Rp 58,546,660,185
PPN 10 % Rp 5,854,666,018
JUMLAH AKHIR Rp 64,401,326,203
SMK3 => 66/SE/M/2015
Rekapitulasi Proyek Jembatan Pangarengan - Tol Cijago
PEKERJAAN HARGA
I. PEKERJAAN PERSIAPAN Rp 376,066,613
II. PEKERJAAN TANAH Rp 299,059,878
III. PEKERJAAN STRUKTUR BAWAH Rp 10,149,901,230
IV. PEKERJAAN STRUKTUR ATAS Rp 18,773,619,952
V. PEKERJAAN LANTAI JEMBATAN Rp 27,786,916,869
VI. PEKERJAAN UTILITAS Rp 767,139,962
VII. PEKERJAAN DRAINASE Rp 393,955,680
VII. PEKERJAAN GERBANG TOL Rp 3,664,076,699
JUMLAH Rp 62,210,736,884
PPN 10 % Rp 6,221,073,688
JUMLAH AKHIR Rp 68,431,810,572
SMK3 => 66/SE/M/2015