[STAATSOLIE MAATSCHAPPU SURINAME NY.
TECHNICAL SERVICES - NSPECTION DEPARTMENT
INSPECTION RECOMMENDATIONS
Jesonentos [vse fosranex [ie
a Prove
[oseion Tipe [aera vee
[FRONGS
[vesse general mgood condon. Some nozzle flange Fave severe covoded to 1a Temn ek (real
fzzmm ja fund in previous inspections
[RECOMMENDATIONS
fy Renew Snozzes el SOG Long Weld Neck fanges (Nowles Wark C,G,FY_FO) Nowe te vessels
Jost weld heat vested, n order to avoid PHT, is recommended fo replace rl a secton ofthe nozie as
Jenoom in atachod sketch, Preheatng wi be necessary. Detals of wold evel wil be provded ltr. Noe
lneL WN fanges shal be wimmed io ze and beveled by machining.
fo. Retace 2 nose gasket faces (nozle mark HA, 8)
[Renew palrof 112" 1808 and one pi 1-200 sp on anges that are corodes
taste bate pats +i 29m ares and cost
Js. anc too clean the smal tore piping at Aorh side of vessel including pipe supports and the top pltorm
land cot
Js) Renew the corded 87M bots onthe Ranges and als the tp lator support
[archer
fy Equipmontekatch with nozaoe marked up
2) Sketch of LWN flange with typical location of welds
Forder pos LAN Hangos, POOR, Raight TBO mh MIAN ScCOTT TS METH A TOON. FANGS Tae ATT
bot hole dimensions according to ASME 818.5
[2 Note The conto! ves tags PV-B0102, 104, 134 & 138 seem quite corded. Tobe crecked
WRITTEN BY. ro T
au
A.Girdh: ‘A Murugésanem Renew nozzle 48 per Skateh attache
6] Reface noealesRepair 2" LWN Flange
M
T 1 T
L i
2" FLANGE LWWN (Bottom Nozzle)
Machine cut , Bevel nozzle pipe ,
Pre-heat , TIG welding , 100% X-ray
=
|
2° FLANGE LWN (Top Nozzle's)
lachine cut , Bevel nozzle pipe ,
Pre-heat , TIG welding , 100% X-ray
as reer
THE
aeerugmwens|y—8141 LPG Bullet
2” Flange LWN 300#
oes sous wo AL aranon oF ne Pome or sumcn conan [Replace nozzle flange
PERC SSCA RS Pe | ro | mee ete
ESvaes pean ra SS me | wer |S