QUALITY ASSURANCE PROJECT PLAN
IRON AND STEEL FOUNDRIES.
MANUAL EMISSION TESTING
CUPOLA WET SCRUBBER IN MICHIGAN
Prepard Tor:
Michael K. Ciolek (MD-19)
Work Assignment Manager
SCGB, EMC, EMAD, OAQPS
U.S. Environmental Protection Agency
Research Triangle Park, NC 27711
September 1997
pi\s414\s414.002\smco\sectal .qap (wpd)
Submitted by:
PACIFIC ENVIRONMENTAL SERVICES, INC.
5001 S. Miami Bivd., Suite 300
Post Office Box 12077
Research Triangle Park, NC 27709-2077
(919) 941-0333 FAX (919) 941-0234APPROVAL SHEET
EPA Contract 68 D20162,
‘Work Assignment No. 4-14
Quality Assurance Project Plan
September 11, 1997, Revision No. 0
John T. Chehaske, Program Manager Date
Pacific Environmental Services, Inc.
Daniel F. Sheffel, Project Manager Date
Pacific Environmental Services, Inc.
C. Wayne Westbrook, Ph.D., QA Officer Date
Pacific Environmental Services, Inc.
Lara P. Autry, QA Manager Date
U.S. Environmental Protection Agency
Michael K. Ciolek, Date
Work Assignment Manager
U.S. Environmental Protection AgencyLIST OF TABLES
LIST OF FIGURES
10
2.0
3.0
4.0
3.0
6.0
10
TABLE OF CONTENTS
Pacific Environmental Services, Inc.
Atlantic Technical Services .
3 DEECO Environmental .
4 Triangle Laboratories, Inc.
1.5 U.S. Environmental Protection Agency
6 Host Facility, Michigan
PROBLEM DEFINITION
PROJECT DESCRIPTION .....
3.1. Objective .
3.2 Testing .
3.3. Training
3.4 Records
PROJECT QUALITY OBJECTIVES ....
DOCUMENTATION AND RECORDS
5.1 Field Operation Records
5.2 Laboratory Records .
53. Final Report .
SAMPLING AND ANALYSIS DESIGN AND PROCEDURES
6.1 Sample Locations ..
6.2 Sampling and Analytical Procedures .
SAMPLE CUSTODY . .
7.1. Sample Custodians .
7.2 Sample Numbering Scheme
73. Sample Preservation
74 Field Test Data