Nama : Eastor Rainhard Dogma Tambunan

TIME SCHEDULE ON JOB TRAINING

APRIL
NO ELEMEN KOMPETENSI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
PLN
1 Pemahaman Proses Bisnis di Unit Induk
2 Pembahasan workplan dengan Mentor sesuai dengan KUK
3 pengoperasian Water Treatment Plant
4 pengoperasian Desalination Plant/Reverse Osmosis
5 pengoperasian hydrogen plant Coal handling Water treatment plant
MEI
5 pengoperasian hydrogen plant
6 pengoperasian peralatan pengolahan limbah 5 10
7 Pengoperasian auxiliary boiler 11 16
8 pengoperasian peralatan auxiliary steam 17 22
9 pengoperasian pemanas udara (air heater) Mill Feeder 23 31
JUNI
10 pengoperasian peralatan bahan bakar minyak dan gas 8 15
11 Pengoperasian sistim bahan bakar minyak dan gas
LEBARAN
12 Pengoperasian peralatan udara pembakaran 22 27
13 Pengoperasian peralatan gas buang Secondary system Oil system
JULI
13 Pengoperasian peralatan gas buang
14 pengoperasian soot blower 4 11
15 pengoperasian water intake 10 15
16 pengoperasian peralatan pendingin 16 21
17 pengoperasian kondenser 22 27
18 pengoperasian peralatan air condensate Cooling system Condensate system Feedwater system 28
AGUSTUS
18 pengoperasian peralatan air condensate 2
19 pengoperasian peralatan air pengisi 3 8
20 pengoperasian peralatan pelumasan 9 14
21 pengoperasian peralatan hydraulic 15 20
22 Pengoperasian peralatan pembuangan abu 21 26
23 Pengoperasian peralatan pemadam kebakaran Fly ash K3 27