TCR Arabia Company LTD.: Penetrant Testing Report
TCR Arabia Company LTD.: Penetrant Testing Report
TCR Arabia Company LTD.: Penetrant Testing Report
INSPECTION PROCESS
Pre-Cleaning Wiping Emulsifier Application -
Penetrant Application Spraying Visible Light Intensity 100 fc
Penetrant Removal Wiping Black Light Intensity -
Developer Application Spraying Minimum Developing Time 10 mins.
Drying Process Normal Testing Temperature Ambient
Minimun Dwell Time 5 – 10 mins. Post-Cleaning -
Item Specification 1 – C – 301
TEST RESULTS
S.I No. Item Description Observation Result
1 – C – 301 Demister Support Extension weld
1 No Relevant Surface Indication ACCEPTED
connections (4)
NOTE:
RONEL CUSTODIO
TCR ARABIA NDT Level II CLIENT REPRESENTATIVE
Date April 9, 2019 Date