Module - Continuous Improvement: T1 Referring Document

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Module - Continuous Improvement M-1

TASK : BMP procedure, Self assessment, Mining Pocket Book Group 3, and MOSA T1
Referring document : BMP-MIN-STD-G-2006 Standard for Loading Point
BMP-MIN-STD-G-2005 Hauling Road
BMP-MIN-STD-G-2004 Dumping Point
BMP-MIN-PR-G-2010 Mining Operation Self Assessment
Mining Module group 3
HSE Control Measured
The GDP engineers will be able to know,understand and implement BMP procedure regarding No Available Understood Implemented
Learning Outcome operational excellent, Mining Self assessment process and action plan, Module group 3, and
Required
following MOSA. 1 Permit to work
2 PTO

GDP Engineers is responsible ensuring mining operational excellent process refer to BMP and
Assessment Standard
Module group 3, MOSA min. score achievement is 90% both stage 1.0 and 2.0

Task 1 - Truck Haulage


Requirements RPL Date Sign GDP to insert picture - evidence task of completion
Understand BMP - Standard for Loading Point (geometry, loading
1
method, elevation control)

2 Understand BMP - Hauling Road procedure (geometry)

Induction with
3 Understand BMP - Dumping procedure (geometry, dumping method) Continuous
Improvement
Understand all Module Group 3 and reporting understanding with
4
summarize critical point for each module
Following Self assessment process and reporting self assessment
5
result

6 Doing MOSA test (stage 1 and stage 2) and minimum pass result is 90

The GDP may be asked to explain one or more of the functions/equipment listed below :
List of Functions / Equipment / Personnel
● Safety Helm ● Safety Glass
● Safety Shoes
● Radio

Mentor Notes Task Sign Off


Signature :

GDP Mentor 1
Note : RPL : Recognized Prior Learning