Total Development Cost (%) Percent OF Completion Remaining Development Cost Remarks Development Description As Per Approved Plans
Total Development Cost (%) Percent OF Completion Remaining Development Cost Remarks Development Description As Per Approved Plans
3 SIDEWALK
A. Concrete 193,800.00 100%
B. Compacted gravel
4 DRAINAGE & SEWARAGE SYSTEM
1 Underground -
1.1 RCP/Line 874,000.00 100% -
1.2 NRCP/Line -
1.3 Manholes/Catchbasin 44,400.00 100%
1.4 Cross drain
2 Open Canal
5 WATER SYSTEM
1 Centralized -
1.1 Water tank/Reservoir cap 550,000.00 100%
1.2 Pumps & Materials 250,000.00 100%
1.3 Fire hydrants 72,000.00 100%
1.4 Waterlines 361,250.00 100%
2 MYSS/Mun./City water works system
3 Individual wells
4 Communal wells
6 ELECTRICAL DIST. SYS.
7 RIPRAP/ RETAINING WALL
8 BRIDGE/BOX CULVERT
9 OPEN SPACE/FILING 158,720.00 100%
10 OTHERS (i.e. Site Development, etc.) 1,938,000.00 100%
11 HOUSING COMPONENT 68,139,557.22 100%
80,370,467.22 -
EVALUATION REMARKS:
PREPARED BY:
ADDITIONAL INFORMATION: (Identify the existing adjacent project/ or existing development at the periphery of the project
including water and power supply sources:
VERIFICATION
I _________________________________________________, of legal age, after having duly sworn, depose and say that
I have read and accomplished this form and the contents hereof are true and correct.
Attested by:______________________
Owner / Developer
SUBSCRIBED AND SWORN to before me in this ____________day of ____________affiant exhibiting to me his/her Res.
Cert. No. _______________ issued at _________________ on ____________.