Operation

Part name
Machine name
Method

Operator Time Helper Time


Prepare wrapers and
labels 0.9
Run Machine 2.2
Wait for machine
1.3

Wait for Helper 0.7


Wrap rolls 0.9
Label rolls 0.6
Open winder 0.3 Wait for operator 0.7
Wait for Helper 0.8 Remoe rolls 0.8
Smart Machine 0.6 Place on skid 0.6

Summary
Operator
Idle time 1.5
Working time 3.7
Total cycle time 5.2
Utilization in percentage 71%
Op no.
Part no. Key
MACH no. Idle time
Date Working time
Chart by

Time Machine Time

Still Stock 2.2

Idle 3

ry
Helper Machine
2 3
3.2 2.2
5.2 5.2
62% 42%