This document provides the rib stressing status as of March 31, 2019 for Ajni Station. It lists the stressing status dates for ribs R1 through R19, with 9 ribs stressed as of the 31st and stressing completed on rib R7. One rib was stressed on March 30th, with a cumulative total of 9 out of 19 ribs stressed and 10 ribs still needing stressing.
This document provides the rib stressing status as of March 31, 2019 for Ajni Station. It lists the stressing status dates for ribs R1 through R19, with 9 ribs stressed as of the 31st and stressing completed on rib R7. One rib was stressed on March 30th, with a cumulative total of 9 out of 19 ribs stressed and 10 ribs still needing stressing.
This document provides the rib stressing status as of March 31, 2019 for Ajni Station. It lists the stressing status dates for ribs R1 through R19, with 9 ribs stressed as of the 31st and stressing completed on rib R7. One rib was stressed on March 30th, with a cumulative total of 9 out of 19 ribs stressed and 10 ribs still needing stressing.