Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MATERIAL LIST FOR ASSEMBLY MK'D B1-3 QTY: 6

GRID LOCATION
Mark Profile Material QTY Length Weight/Part
F-4 PLT10*150 SS400 2 519 6.12
B1-3 GRIDD'-E'/2' EL. +3.580
F-8 PLT10*100 SS400 1 300 2.35 B1-3 GRIDD'-E'/4' EL. +3.580
F-11 PLT10*70 SS400 6 280 1.53 B1-3 GRIDE'''-F''/2 EL. +3.580
h-9 WF300*150*6.5*9 SS400 1 4307 158.10 B1-3 GRIDE'''-F''/4 EL. +3.580
h-12 WF300*150*6.5*9 SS400 2 377 13.86 F-8 PEMERINTAH KABUPATEN JEMBRANA
Total 1 Assy 209.60
B1-3 GRIDE'-E'''/2' EL. +3.580 UPTD RUMAH SAKIT UMUM NEGARA
Grand Total 1257.59 B1-3 GRIDE'-E'''/4' EL. +3.580
6
BOLT LIST FOR ASSEMBLY : B1-3
Bolt Grade Type Qty. Connected Member
QTY: 6
6
TYP S H O P D R A W I NG
M12x40 8.8XOX Site 4 CL-2
B2-2
NAMA KEGIATAN / PROYEK
M12x45 8.8XOX Site 4
F-11
M12x50 8.8XOX Site 10 CL-2 B3-1
Total 1 Assy 18 PEMBANGUNAN
Grand Total 108 RUMAH SAKIT UMUM
TYP NEGARA - KAB. JEMBRANA
7
(RANCANG DAN BANGUN)
F-11 TA 2018 - 2019
B - B
LOKASI

4328
Jalan Wijaya Kusuma No. 17 Negara
Kab. Jembrana - Bali

3970.5
2169
347
347 1821.5 1801.5
0

KETERANGAN
F-11 F-11 F-11
F-4

F-4
KONSULTAN MANAJEMEN KONSTRUKSI

F-11 PT YODYA KARYA (Persero)


F-11 F-11
ENGINEERING CONSULTANT
F-8 Cabang Surabaya
2139
0

2139
TRIONO AGUNG DUMADI ST, MT
4328 (WF300*150*6.5*9 x 4308) Team Leader

KONTRAKTOR PELAKSANA :
10 337 1791.5 50 1781.5 347 10
150

35 40 40 35
14 Ø 14 A TYP B A
7 4 Ø 14
35

60

DIGAMBAR DIPERIKSA DISETUJUI


66

80
66
300

300

300
58

F-8

ALAS SITANGGANG WANTEMAS, IR


520
75

DRAFTER SEM PM

B1-3 ( h-9 )
30

TYP JUDUL GAMBAR


7 B
67

GEDUNG RAWAT INAP VIP (ATAP SKYLIGHT) RSU NEGARA BALI

°
30.5
h-12
200

200

200
30.5
F-4

ASSEMBLY DRAWING
58

h-12 BEAM ASSEMBLY


6 TYP
45

6
20

20

20
TANGGAL : 06 JANUARI 2019
Tekla structures

TYP
A 7 A NO.GAMBAR SKALA REV LEMBAR
A - A
330.5 3667
SD-B1-3 NTS

You might also like