TATA PROJECTS
URBAN INFRASTRUCTURE
TATA MEDICAL CENTER, KOLKATA, PHASE Il
METHOD STATEMENT FOR TOWER CRANE DISMANTLING
DISMANTLING
METHOD STATEMENT FOR TOWER CRANE
Crane Model: Mci85 — 5T, 50 mtr Boom Length
Document No. :
Issue | DATE . NAME
DESIGNATIO
N
SIGNATURE,
Mr, NAVDBEP SINGH
Prepared by | GREWAL
P&M MANAGER
view Mr PINAKI MUKHERJEE,
01.07.2016 Renewes Yi
Approved by
PROJECT
MANAGER,
jef No: TPL.-EXE- METHOD STATEMENT [IssueNo:1 issue Date:
‘OR TOWER CRANE DIASMATLING
page: 1 of7
Process Owner: PM = TPL [Document Owner: MANAGER
jext Review Date:TATA PROJECTS
URBAN INFRASTRUCTURE
TATA MEDICAL CENTER, KOLKATA, PHASE Il
METHOD STATEMENT FOR TOWER CRANE DISMANTLING
1, SCOPE
1.1. Brief introduction
Dismantle 01 unit of above mentioned tower crane for the site above with due consideration to the quality and
safety aspects of the proposed development
The mentioned tower crane (MCi85) is located inside the main building with the foundation in the basement. It
is about 43.5m high and its arm is SOm long, and it has one set of steel support linking with the building
structure for fixation. Presently, the building structure installation is basically completed, thus in order not to
affect the roof erection work and as like, we need to dismantle this tower crane,
1.2. Preliminary Preparation
Make necessary cleaning in the adjacent area to leave the work platform for dismantling and arrange a derrick
arrangement; set the location for storing the dismantled elements, all involved persons to assure the normal
condition of al the relevant tools & facilities, rape limit switch, safety devices, electrical devices, hydraulic
jack, before dismantling work start, finish the tower erane handover procedure and method explanation,
2. WORKING METHOD
2.2.1. Remove of jib section by removing2nos of connecting pin.(in10to1Smlength)Secure and lift the jib
section and lower to the ground.
2.2.2. Remove of balancing counterweight, secure and lif the counterweight and lower to the ground
2.2.3 Remove of the A frame, secure and remove connecting bolt & nuts, lower the A Frame to the ground
2.2.4 Remove of the counter jib with winch, secure & remove connecting pins. Lower the counter jib to the
ground,
2.2.5 Remove of Slewing assembly, secure and remove connecting pin. Lower the Slewing assembly t0 the
ground
2.2.6 Remove the mast section secures and removes connecting pins
2.2.7 Remove the fixing angles on the foundation
3. WORKING HOURS
Working hours shall be from 09:00amto18:00p.m. Working hours may be extended ifthe work requires so.
{ef No: TPL-EXE- METHOD STATEMENT JIssueNo:1 issue Date:
fon rowen ckave DIASMATLING
Process Owner: PM = TPL [Document Owner: MANAGERTATA PROJECTS
URBAN INFRASTRUCTURE
TATA MEDICAL CENTER, KOLKATA, PHASE II
METHOD STATEMENT FOR TOWER CRANE DISMANTLING
4, PERSONNEL,
Site Supervisor
1. Approved crane operator
b. Lifting Supervisor
. Riggers
. Signalman
5, PROGRAMME OF WORK
1, Cranage-
All lifting gears withthe erane, e.g. chain ropes, slings, shackles and tools used for dismantle will be inspected
thoroughly. Load chart of the tower crane to be displayed correctly before dismantling operation.
2. Manpower
‘To supply a team of riggers and qualified lifting supervisor on site during dismantle to ensure safety measures
are strictly adhered to.
6. SAFETY MEASURES
1. All workers on site to be properly equipped with safety harness, helmets, etc.
2. Other workers on site to be cleared from the working area and to ensure that no one is working below
suspended load.
3. To ensure that the person giving lifting signal is qualified, and that crane operator understand and be able to
visualize and hear his commands,
4, Lifting Gears must be checked to ascertain the correct weight prior to lifting operation.
5. Only the professional persons could be nominated for this work; before the commencement, the written
instruction to be furnished to the persons involved; maintain the intercommunications all the time through the
progress.
6. The working area to be cleared of any uninvolved person.
7. The screws temporary fixation along the progress to be assured.
8. Make balancing well and assure the enough operation space when lifting away the arm structure to avoid any
interference or hitting or accidents as like between the arm structure and the building,
9. The dismantling work must be abandoned during the rainy, windy weather and the operation area to be
blocked accordingly.
10, All persons involved in the work shall be furnished with full labor protection facilites; they must be
concentrated, cooperative and absolutely obey the order during the work; the supervisor in charge to guarantee
the whole progress, give orders for series of operation after assuring the safety
11. All injurant & wastes to be collected and stored in the nominated place after dismantling progress
completed,
‘ef No: TPL-EXE- METHOD STATEMENT issue Date:
OR TOWER CRANE DIASMATLING
Process Owner: PM - TPL jocument Owner: MANAGER ext Review Date: