Download as pdf
Download as pdf
You are on page 1of 12
TATA PROJECTS URBAN INFRASTRUCTURE TATA MEDICAL CENTER, KOLKATA, PHASE Il METHOD STATEMENT FOR TOWER CRANE DISMANTLING DISMANTLING METHOD STATEMENT FOR TOWER CRANE Crane Model: Mci85 — 5T, 50 mtr Boom Length Document No. : Issue | DATE . NAME DESIGNATIO N SIGNATURE, Mr, NAVDBEP SINGH Prepared by | GREWAL P&M MANAGER view Mr PINAKI MUKHERJEE, 01.07.2016 Renewes Yi Approved by PROJECT MANAGER, jef No: TPL.-EXE- METHOD STATEMENT [IssueNo:1 issue Date: ‘OR TOWER CRANE DIASMATLING page: 1 of7 Process Owner: PM = TPL [Document Owner: MANAGER jext Review Date: TATA PROJECTS URBAN INFRASTRUCTURE TATA MEDICAL CENTER, KOLKATA, PHASE Il METHOD STATEMENT FOR TOWER CRANE DISMANTLING 1, SCOPE 1.1. Brief introduction Dismantle 01 unit of above mentioned tower crane for the site above with due consideration to the quality and safety aspects of the proposed development The mentioned tower crane (MCi85) is located inside the main building with the foundation in the basement. It is about 43.5m high and its arm is SOm long, and it has one set of steel support linking with the building structure for fixation. Presently, the building structure installation is basically completed, thus in order not to affect the roof erection work and as like, we need to dismantle this tower crane, 1.2. Preliminary Preparation Make necessary cleaning in the adjacent area to leave the work platform for dismantling and arrange a derrick arrangement; set the location for storing the dismantled elements, all involved persons to assure the normal condition of al the relevant tools & facilities, rape limit switch, safety devices, electrical devices, hydraulic jack, before dismantling work start, finish the tower erane handover procedure and method explanation, 2. WORKING METHOD 2.2.1. Remove of jib section by removing2nos of connecting pin.(in10to1Smlength)Secure and lift the jib section and lower to the ground. 2.2.2. Remove of balancing counterweight, secure and lif the counterweight and lower to the ground 2.2.3 Remove of the A frame, secure and remove connecting bolt & nuts, lower the A Frame to the ground 2.2.4 Remove of the counter jib with winch, secure & remove connecting pins. Lower the counter jib to the ground, 2.2.5 Remove of Slewing assembly, secure and remove connecting pin. Lower the Slewing assembly t0 the ground 2.2.6 Remove the mast section secures and removes connecting pins 2.2.7 Remove the fixing angles on the foundation 3. WORKING HOURS Working hours shall be from 09:00amto18:00p.m. Working hours may be extended ifthe work requires so. {ef No: TPL-EXE- METHOD STATEMENT JIssueNo:1 issue Date: fon rowen ckave DIASMATLING Process Owner: PM = TPL [Document Owner: MANAGER TATA PROJECTS URBAN INFRASTRUCTURE TATA MEDICAL CENTER, KOLKATA, PHASE II METHOD STATEMENT FOR TOWER CRANE DISMANTLING 4, PERSONNEL, Site Supervisor 1. Approved crane operator b. Lifting Supervisor . Riggers . Signalman 5, PROGRAMME OF WORK 1, Cranage- All lifting gears withthe erane, e.g. chain ropes, slings, shackles and tools used for dismantle will be inspected thoroughly. Load chart of the tower crane to be displayed correctly before dismantling operation. 2. Manpower ‘To supply a team of riggers and qualified lifting supervisor on site during dismantle to ensure safety measures are strictly adhered to. 6. SAFETY MEASURES 1. All workers on site to be properly equipped with safety harness, helmets, etc. 2. Other workers on site to be cleared from the working area and to ensure that no one is working below suspended load. 3. To ensure that the person giving lifting signal is qualified, and that crane operator understand and be able to visualize and hear his commands, 4, Lifting Gears must be checked to ascertain the correct weight prior to lifting operation. 5. Only the professional persons could be nominated for this work; before the commencement, the written instruction to be furnished to the persons involved; maintain the intercommunications all the time through the progress. 6. The working area to be cleared of any uninvolved person. 7. The screws temporary fixation along the progress to be assured. 8. Make balancing well and assure the enough operation space when lifting away the arm structure to avoid any interference or hitting or accidents as like between the arm structure and the building, 9. The dismantling work must be abandoned during the rainy, windy weather and the operation area to be blocked accordingly. 10, All persons involved in the work shall be furnished with full labor protection facilites; they must be concentrated, cooperative and absolutely obey the order during the work; the supervisor in charge to guarantee the whole progress, give orders for series of operation after assuring the safety 11. All injurant & wastes to be collected and stored in the nominated place after dismantling progress completed, ‘ef No: TPL-EXE- METHOD STATEMENT issue Date: OR TOWER CRANE DIASMATLING Process Owner: PM - TPL jocument Owner: MANAGER ext Review Date:

You might also like