Professional Documents
Culture Documents
Summary of Quality Control Tests Required For Bridges
Summary of Quality Control Tests Required For Bridges
Quantity
Page
Sl.No Date Item MB No. (finished unit Rate unit Amount
No.
item)
105878242.91
in Suryapet Ditrict.
Contract Over head Net Chargable
Profit charges amount
91669474.38
PRICE ADJUSTMENT FOR POL
Widening and strengthing Ahmeenabad to Naikanagudem Road on 0/0 to 11/0 in Suryapet Ditr
Average
Average
whole
whole sale Percentage Percentage Rate of item
sale price
price of of increase of increase Accept > (excluding VAT,
of HSD Date of
Date of technical HSD @ or decrese or decrese in 5% Total Value of Seniorage
S. No. @ BPC measurement
sanctions BPC in cost of cost of POL Reject < 5 Work as per M.B. charge, and all
consumer of the Bill
consumer POL ( rate more than % other over head
pumps at
pumps at Base) 5% charges)
Hyd on
Hyd
TS date
1 5/10/17
31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 173504.88 150220.68
5/11/17
2 31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 21058.01 18232.04
5/11/17
3 31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 144431.49 125048.91
5/13/17
4 31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 938454.33 812514.57
5/14/17
5 31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 19053.11 16496.20
5/15/17
6 31-Dec-2016 61.81 62.55 1.200 -3.800 Rejected 23360.64 20225.66
7 31-Dec-2016 61.81 5/16/17 62.55 1.200 -3.800 Rejected 934421.41 809022.87
8 31-Dec-2016 61.81 5/17/17 59.91 -3.070 -8.070 Rejected 27303.84 23639.69
5/17/17
9 31-Dec-2016 61.81 59.91 -3.070 -8.070 Rejected 88114.59 76289.69
10 31-Dec-2016 61.81 5/18/17 59.91 -3.070 -8.070 Rejected 17559.48 15203.01
5/20/17
11 31-Dec-2016 61.81 59.91 -3.070 -8.070 Rejected 824683.83 714011.97
5/22/17
12 31-Dec-2016 61.81 59.91 -3.070 -8.070 Rejected 641937.50 555790.04
5/29/17
19 31-Dec-2016 61.81 59.91 -3.070 -8.070 Rejected 421781.36 365178.67
5/29/17
20 31-Dec-2016 61.81 59.91 -3.070 -8.070 Rejected 1292527.76 1119071.66
21 31-Dec-2016 61.81 5/29/17 59.91 -3.070 -8.070 Rejected 327823.20 283829.61
22 31-Dec-2016 61.81 5/31/17 59.91 -3.070 -8.070 Rejected 24945.63 21597.95
1/30/18
87 31-Dec-2016 61.81 69.51 12.460 7.460 Accepted 1226400.00 1061818.18
2/1/18
88 31-Dec-2016 61.81 69.63 12.650 7.650 Accepted 17665.60 15294.89
100 31-Dec-2016 61.81 2/12/18 69.10 11.790 6.790 Accepted 201096.00 174109.09
2/13/18
101 31-Dec-2016 61.81 68.97 11.580 6.580 Accepted 22932.00 19854.55
2/14/18
102 31-Dec-2016 61.81 68.97 11.580 6.580 Accepted 22932.00 19854.55
2/19/18
103 31-Dec-2016 61.81 67.82 9.720 4.720 Accepted 1851024.00 1602618.18
2/26/18
104 31-Dec-2016 61.81 67.52 9.240 4.240 Accepted 65832.00 56997.40
2/27/18
105 31-Dec-2016 61.81 67.50 9.210 4.210 Accepted 4415040.00 3822545.45
3/6/18
106 31-Dec-2016 61.81 68.45 10.740 5.740 Accepted 324494.90 280947.96
3/6/18
107 31-Dec-2016 61.81 67.93 9.900 4.900 Accepted 526680.00 456000.00
108 31-Dec-2016 61.81 3/8/18 68.40 10.660 5.660 Accepted 32753.76 28358.23
3/9/18
109 31-Dec-2016 61.81 68.37 10.610 5.610 Accepted 318352.02 275629.45
3/9/18
110 31-Dec-2016 61.81 68.37 10.610 5.610 Accepted 3188640.00 2760727.27
3/9/18
111 31-Dec-2016 61.81 68.37 10.610 5.610 Accepted 38220.00 33090.91
3/10/18
112 31-Dec-2016 61.81 68.37 10.610 5.610 Accepted 38220.00 33090.91
3/14/18
113 31-Dec-2016 61.81 68.33 10.550 5.550 Accepted 4847920.00 4197333.33
3/21/18
114 31-Dec-2016 61.81 68.28 10.470 5.470 Accepted 311220.00 269454.55
3/27/18
115 31-Dec-2016 61.81 69.33 12.170 7.170 Accepted 35490.00 30727.27
116 31-Dec-2016 61.81 3/28/18 69.74 12.830 7.830 Accepted 35490.00 30727.27
3/31/18
117 31-Dec-2016 61.81 69.74 12.830 7.830 Accepted 2864680.00 2480242.42
4/5/18
118 31-Dec-2016 61.81 70.50 14.060 9.060 Accepted 12614.16 10921.35
4/10/18
119 31-Dec-2016 61.81 70.62 14.250 9.250 Accepted 44640.00 38649.35
4/12/18
120 31-Dec-2016 61.81 70.58 14.190 9.190 Accepted 1078560.00 933818.18
4/18/18
121 31-Dec-2016 61.81 70.95 14.790 9.790 Accepted 105336.00 91200.00
4/19/18
122 31-Dec-2016 61.81 70.95 14.790 9.790 Accepted 1483218.00 1284171.43
4/20/18
123 31-Dec-2016 61.81 71.00 14.870 9.870 Accepted 24024.00 20800.00
124 31-Dec-2016 61.81 4/23/18 71.47 15.630 10.630 Accepted 969584.00 839466.67
6/1/18
125 31-Dec-2016 61.81 75.26 21.760 16.760 Accepted 58422.00 50581.82
6/3/18
126 31-Dec-2016 61.81 75.16 21.600 16.600 Accepted 58422.00 50581.82
6/4/18
127 31-Dec-2016 61.81 75.01 21.360 16.360 Accepted 72072.00 62400.00
6/5/18
128 31-Dec-2016 61.81 74.91 21.190 16.190 Accepted 72072.00 62400.00
6/6/18
129 31-Dec-2016 61.81 74.82 21.050 16.050 Accepted 6811056.00 5897018.18
6/8/18
130 31-Dec-2016 61.81 74.58 20.660 15.660 Accepted 71198.40 61643.64
6/9/18
131 31-Dec-2016 61.81 74.26 20.140 15.140 Accepted 71198.40 61643.64
6/10/18
132 31-Dec-2016 61.81 73.90 19.560 14.560 Accepted 66240.72 57351.27
6/11/18
133 31-Dec-2016 61.81 73.90 19.560 14.560 Accepted 66240.72 57351.27
6/12/18
134 31-Dec-2016 61.81 73.79 19.380 14.380 Accepted 7456051.26 6455455.64
6/13/18
135 31-Dec-2016 61.81 73.79 19.380 14.380 Accepted 245768.00 212786.15
Total Amount Rs.
in Suryapet Ditrict.
Percent
age of
POL
compon Cost of work
ent of done (Vf)
Name of the item
the Increse/decreas
work ed
(Pf)
Consta
nt
CNG(0/0 TO
15 11/2)B/S
EW Trench
Cutting(0/0 TO
15 2/0)L/S
DISMANTILING
EXISTING
15 STRUCTURES
GSB Grading(0/4
15 TO
EW2/0)L/S
Trench
Cutting(2/0 TO
15 3/6)L/S
EW
FOUNDATION OF
15 HP CULVERTS
GSB Grading(2/0
15 EW
TO 3/6)L/S
FOUNDATION OF
15 HP CULVERTS
VCC 1:3:6 BODY
15 WALLS
EW Trench
Cutting(3/6 TO
15 5/0)L/S
GSB Grading(3/6
15 TO 5/0)L/S
1000 MM DIA NP-
15 4 PIPES
VCC M-15 FOR
15 BODY WALLS
VCC 1:3:6
15 EW Trench
BELOW PIPE
Cutting(0/4 TO
15 2/8)R/S
GSB Grading(0/4
15 EW Trench
TO 2/8)R/S
Cutting(2/8 TO
15 5/0)R/S
VCC 1:3:6
15 BELOW PIPE
VCC M-15 FOR
15 BODY WALLS
Forming
GSB Grading(2/8
15 Embankment
TO 5/0)R/S Side
Earth (0/4 TO 5/0)
15 EW
B/S Trench
Cutting(9/0 TO
15 EW
11/2)L/S
FOUNDATION OF
15 HP CULVERTS
1000 MM DIA NP-
15 4 PIPES
VCC 1:3:6 BODY
15 WALLS
VCC M-15 FOR
15 BODY WALLS
VCC 1:3:6
15 BELOW PIPE
VCC M-15 FOR
15 BODY WALLS
GSB Grading(9/0
15 TO 11/2)L/S
1000 MM DIA NP-
15 4
EWPIPES
Trench
Cutting(9/0 TO
15 11/2)R/S
VCC M-15 FOR
15 BODY WALLS
VCC 1:3:6
15 ENCASING
VCC M-15 FOR
15 PARAPET WALLS
GSB Grading(9/0
15 TO 11/2)R/S
FILLING BODY
WALLS WITH
15 GRAVEL
EW Trench
Cutting(7/0 TO
15 9/0)R/S
GSB Grading(7/0
15 TO
EW9/0)R/S
Trench
Cutting(5/4 TO
15 7/0)R/S
EW Trench
Cutting(7/0 TO
15 9/0)L/S
SCARIFYING(9/0
15 TO 11/200)
GSB Grading(7/0
15 -15266.13 TO 9/0)L/S
GSB Grading(5/4
15 -12185.09 TO
EW7/0)R/S
Trench
Cutting(5/4 TO
15 -246.39 7/0)L/S
GSB Grading(5/4
15 -12967.84 TO 7/0)L/S
WMM(10/340
Forming TO
15 -28970.62 11/2)
Embankment Side
Earth (6/0 TO
15 11/2) B/S
15 WMM(9/0 TO 9/7)
GSB Grading(0/0
15 TO 0/4)L/S
GSB Grading(0/0
15 TO
EW 0/4)R/S
Trench
Forming
Cutting(5/0
Embankment TOSide
15 5/4)L/S
Earth (0/0 TO 0/4
& 5/0 TO 5/380)
15 B/S
GSB
Grading(5/040 TO
15 5/4)L/S
EW Trench
Cutting(5/0 TO
15 5/4)R/S
GSB
Grading(5/040 TO
15 5/4)R/S
VCC-1:4:8 CC
PAVEMENT(9/7
15 TO 10/340)
GSB Grading(5/0
15 TO
M-355/040)B/S
CC
PAVEMENT (9/7
15 TO 10/340) R/S
VCC-1:4:8
M-35 CC CC
Forming
PAVEMENT(5/040
PAVEMENT
15 Embankment
TO 5/380)
(5/040 TO 5/380)
Borrowed Soil
15 R/S
(10/340 TO 11/2)
15 B/S
VCC-1:4:8 CC
PAVEMENT(0/000
15 TO 0/260)
15 M-35 CC
Fe-250
PAVEMENT (0/0
15 TO 0/260) R/S
15 Fe-250
15 Fe-250
M-35 CC
PAVEMENT (0/0
15 -3696.54 M-35
TO 0/260)
CC L/S
PAVEMENT (9/7
15 -8254.35 TO 10/340) L/S
15 -486.82 Fe-250
M-35 CC
15 -164.92 PAVEMENT
Fe-250
(5/040 TO 5/380)
15 -2812.55 R/S
GSB
SCARIFYING(6/5
15 2.79 Grading(8/240
TO 9/0) TO
8/3 & 8/950 TO
15 446.47 9/0 )B/S
15 19763.47 GSB
15 30273.33 DBM(9/2
PRIME TO 11/2)
COAT(5/380 TO
15 3865.33 7/0)
TACK
COAT(5/380 TO
15 436.19 7/0)L/S
Embankment
Borrowed Soil (3/8
15 6802.12 TO 7/0) B/S
GSB Grading(3/9
TO 3/950 & 4/050
15 2857.61 TO
TACK4/200)B/S
COAT(5/380 TO
15 436.19 7/0)R/S
WMM(3/8 TO
15 30177.32 5/040)
DBM(5/380 TO
15 31257.40 7/0)
PRIME COAT(4/2
15 1773.93 TO 5/040)
TACK COAT(4/2
15 196.03 TO 5/040)L/S
TACK COAT(4/2
15 196.03 TO 5/040)R/S
DBM(4/2 TO
15 11350.44 5/040)
SCARIFYING(0/7
15 362.42 TO 3/0)
15 24127.92 WMM(2/0
EmbankmentTO 3/8)
Borrowed Soil (1/8
15 2419.55 TO 3/8) L/S
PRIME COAT(2/0
15 3352.04 TO 4/2)
TACK COAT(2/0
15 240.80 TO 3/6)L/S
GSB Grading(1/3
15 2320.11 TO 1/5 )B/S
Percentage
Percentag
Average whole of increase
Average whole e of Accept >
sale price for Date of or decrese in
S. Date of technical sale price of increase 5% Qty of work
Steel on measurement of the cost of
No. sanctions Steel on or decrese Reject < 5 as per M.B
technical Bill STEEL
recording date in cost of %
sanction date morethan
STEEL
5%
1 2 3 4 5 6 7 8 9
31-Dec-2016 9/11/2017 -12.82 1.43
1 45883 40000 -7.82 Accepted
31-Dec-2016 11/18/2017 -12.82 1.43
2 45883 40000 -7.82 Accepted
31-Dec-2016 11/18/2017 -5.74 0.21
3 40312 38000 -0.74 Accepted
31-Dec-2016 12/10/2017 -12.82 3.59
45883 40000 -7.82 Accepted
31-Dec-2016 12/22/2017 -12.82 1.89
45883 40000 -7.82 Accepted
DJUSTMENT FOR STEEL
Value of work
Percentage
(excluding VAT,
of Steel Cost of work done
Rate of steel as VALUE OF Value of Bill Seniorage
per estimate Steel amount charge, and all
component Increse/decreased Item
of the work (Vb)
other over head
(Pb)
charges(R)
10 11 12 13 14 15 16
65533.66 56739.10 Steel
45883 65533.656533 100.00 -7274.94
88114.59 76289.69 Steel
45883.00 65533.656533 74.37 -7274.94
526680.00 456000.00 Steel
40312.00 8429.4907469 1.60 -418.57
164529.78 142450.03 Steel
45883.00 164529.78497 100.00 -18264.58
86899.53 75237.69 Steel
45883.00 86899.534313 100.00 -9646.78
-14968.46
PRICE ADJUSTMENT F
Widening and strengthing Ahmeenabad to Naikanagud
Percent
Average Percenta
age of
whole ge of
Average increas
sale price increase
whole sale e or Accept >
Date of for Date of or Qty of
S. price of decrese 5%
technical Cement measuremen decrese work as
No. Cement on in cost Reject < 5
sanctions on t of the Bill in cost of per M.B
recording of %
technical Cement
date Cement
sanction morethan
( rate
date 5%
Base)
1 2 3 4 5 6 7 8 9
1 31-Dec-2016 5900 5/17/2017 6200 5.08 0.08 Accepted 20.43
10 11 12 13 14 15 16 17
0.22 4.4946 6000 26967.6 88114.59 76289.69 30.61 18.70
145175.58 125693.14
0.22 7.4052 6000 44431.2 30.61 30.80
421781.36 365178.67
0.27 21.622 6000 129729.6 30.76 89.94
105711.63 91525.22
0.22 5.3922 6000 32353.2 30.61 0.00
254986.00 220767.10
0.22 10.651 6000 63903.84 25.06 0.00
1689408.00 1462690.91
0.21 94.08 6000 564480 33.41 -58399.99
2789696.00 2415321.21
0.43 192.64 6000 1155840 41.43 -119580.93
897498.00 777054.55
0.21 49.98 6000 299880 33.41 -31024.99
1482026.00 1283139.39
0.43 102.34 6000 614040 41.43 -63527.37
686322.00 594218.18
0.23 41.86 6000 251160 36.60 -25984.52
18
VCC 1:3:6 BODY WALLS
Percenta
Average Percenta
ge of
whole ge of
Average increase
sale increase
Date of Date of whole sale or
price for or Accept > 5 % Qty of work
S. No. technical measureme price of BT decrese
BT on decrese Reject < 5 % as per M.B
sanctions nt of the Bill on recording in cost of
technical in cost of
date BT
sanction BT ( rate
moretha
date Base)
n 5%
1 2 3 4 5 6 7 8 9
1 31-Dec-16 44892 1/24/2018 37850 -15.69 -10.69 Accepted 9100.00
2 31-Dec-16 44892 1/24/2018 37850 -15.69 -10.69 Accepted 13904.80
3 31-Dec-16 26468 1/26/2018 27800 5.03 0.03 Accepted 4852.40
4 31-Dec-16 26468 1/27/2018 27800 5.03 0.03 Accepted 5432.00
5 31-Dec-16 26468 1/28/2018 27800 5.03 0.03 Accepted 4684.40
6 31-Dec-16 26468 1/29/2018 27800 5.03 0.03 Accepted 4718.00
7 31-Dec-16 24626 1/29/2018 28000 13.70 8.70 Accepted 748.44
8 31-Dec-16 26468 1/30/2018 27800 5.03 0.03 Accepted 4718.00
9 31-Dec-16 24626 2/6/2018 27730 12.60 7.60 Accepted 471.80
10 31-Dec-16 44892 2/8/2018 39170 -12.75 -7.75 Accepted 11256.00
11 31-Dec-16 26468 2/9/2018 23280 -12.04 -7.04 Accepted 5628.00
12 31-Dec-16 26468 2/10/2018 23780 -10.16 -5.16 Accepted 5628.00
13 31-Dec-16 24626 2/12/2018 27730 12.60 17.60 Accepted 562.80
14 31-Dec-16 44892 2/12/2018 39170 -12.75 -7.75 Accepted 5880.00
15 31-Dec-16 26468 2/13/2018 24280 -8.27 -3.27 Accepted 2940.00
16 31-Dec-16 26468 2/14/2018 24280 -8.27 -3.27 Accepted 2940.00
17 31-Dec-16 24626 2/19/2018 27340 11.02 6.02 Accepted 294.00
18 31-Dec-16 44892 3/6/2018 39230 -12.61 -7.61 Accepted 15400.00
19 31-Dec-16 26468 3/8/2018 23040 -12.95 -7.95 Accepted 4199.20
20 31-Dec-16 26468 3/9/2018 23040 -12.95 -7.95 Accepted 4900.00
21 31-Dec-16 26468 3/10/2018 23040 -12.95 -7.95 Accepted 4900.00
22 31-Dec-16 24626 3/14/2018 27210 10.49 5.49 Accepted 770.00
23 31-Dec-16 44892 3/21/2018 39130 -12.84 -7.84 Accepted 9100.00
24 31-Dec-16 26468 3/27/2018 22940 -13.33 -8.33 Accepted 4550.00
25 31-Dec-16 26468 3/28/2018 22940 -13.33 -8.33 Accepted 4550.00
26 31-Dec-16 24626 3/31/2018 27210 10.49 5.49 Accepted 455.00
27 31-Dec-16 44892 4/18/2018 39130 -12.84 -7.84 Accepted 3080.00
28 31-Dec-16 26468 4/20/2018 22860 -13.63 -8.63 Accepted 3080.00
29 31-Dec-16 24626 4/23/2018 26940 9.40 14.40 Accepted 154.00
30 31-Dec-16 26468 6/1/2018 23370 -11.70 -6.70 Accepted 7490.00
31 31-Dec-16 26468 6/3/2018 23370 -11.70 -6.70 Accepted 7490.00
32 31-Dec-16 26468 6/4/2018 23370 -11.70 -6.70 Accepted 9240.00
33 31-Dec-16 26468 6/5/2018 23370 -11.70 -6.70 Accepted 9240.00
34 31-Dec-16 24626 6/6/2018 27640 12.24 17.24 Accepted 974.40
35 31-Dec-16 26468 6/8/2018 23370 -11.70 -6.70 Accepted 9128.00
36 31-Dec-16 26468 6/9/2018 23370 -11.70 -6.70 Accepted 9128.00
37 31-Dec-16 26468 6/10/2018 23370 -11.70 -6.70 Accepted 8492.40
38 31-Dec-16 26468 6/11/2018 23370 -11.70 -6.70 Accepted 8492.40
39 31-Dec-16 24626 6/12/2018 27640 12.24 7.24 Accepted 1066.67
E ADJUSTMENT FOR BITUMEN
Value of work
(excluding
Percentage
Qty of Rate of VAT, Cost of work
Qty of VALUE of BT
Bitumen Bitumen as Value of Bill Seniorage done
Bitumen OF component
in per amount charge, and Increse/decrea
per Sqm Bitumen of the work
Tonnes estimate all other over sed (Vb)
(Pb)
head
charges(R)
10 11 12 13 14 15 16 17
0.7 6.37 44892 285962 311220.00 269454.55 91.88 -26461.12
0.7 9.73336 44892 436950 475544.16 411726.55 91.88 -40432.59
0.2 0.97048 26468 25686.66 37848.72 32769.45 67.87 6.68
0.2 1.0864 26468 28754.84 42369.60 36683.64 67.87 7.47
0.2 0.93688 26468 24797.34 36538.32 31634.91 67.87 6.44
0.2 0.9436 26468 24975.2 36800.40 31861.82 67.87 6.49
118 88.31592 24626 2174868 4712178.24 4079808.00 46.15 163832.77
0.2 0.9436 26468 24975.2 36800.40 31861.82 67.87 6.49
118 55.6724 24626 1370989 2970452.80 2571820.61 46.15 90244.91
0.7 7.8792 44892 353713 384955.20 333294.55 91.88 -23726.82
0.2 1.1256 26468 29792.38 43898.40 38007.27 67.87 -1816.63
0.2 1.1256 26468 29792.38 43898.40 38007.27 67.87 -1330.42
118 66.4104 24626 1635423 3543388.80 3067869.09 46.15 249297.51
0.7 4.116 44892 184775 201096.00 174109.09 91.88 -12394.61
0.2 0.588 26468 15563.18 22932.00 19854.55 67.87 -440.44
0.2 0.588 26468 15563.18 22932.00 19854.55 67.87 -440.44
118 34.692 24626 854325 1851024.00 1602618.18 46.15 44531.99
0.7 10.78 44892 483936 526680.00 456000.00 91.88 -31891.59
0.2 0.83984 26468 22228.89 32753.76 28358.23 67.87 -1530.22
0.2 0.98 26468 25938.64 38220.00 33090.91 67.87 -1785.59
0.2 0.98 26468 25938.64 38220.00 33090.91 67.87 -1785.59
118 90.86 24626 2237518 4847920.00 4197333.33 46.15 106384.93
0.7 6.37 44892 285962 311220.00 269454.55 91.88 -19403.57
0.2 0.91 26468 24085.88 35490.00 30727.27 67.87 -1737.01
0.2 0.91 26468 24085.88 35490.00 30727.27 67.87 -1737.01
118 53.69 24626 1322170 2864680.00 2480242.42 46.15 62863.82
0.7 2.156 44892 96787.15 105336.00 91200.00 91.88 -6567.36
0.2 0.616 26468 16304.29 24024.00 20800.00 67.87 -1218.37
118 18.172 24626 447504 969584.00 839466.67 46.15 55772.32
0.2 1.498 26468 39649.06 58422.00 50581.82 67.87 -2300.91
0.2 1.498 26468 39649.06 58422.00 50581.82 67.87 -2300.91
0.2 1.848 26468 48912.86 72072.00 62400.00 67.87 -2838.51
0.2 1.848 26468 48912.86 72072.00 62400.00 67.87 -2838.51
127.2 123.9437 24626 3052237 6811056.00 5897018.18 44.81 455555.71
0.2 1.8256 26468 48320 71198.40 61643.64 67.87 -2804.10
0.2 1.8256 26468 48320 71198.40 61643.64 67.87 -2804.10
0.2 1.69848 26468 44955.37 66240.72 57351.27 67.87 -2608.85
0.2 1.69848 26468 44955.37 66240.72 57351.27 67.87 -2608.85
127.2 135.6809 24626 3341279 7456051.26 30.00 44.81 0.97
1032714.38
Item
18
PRIME COAT(9/2 TO 11/2)
PRIME COAT(7/0 TO 9/2)
TACK COAT(7/0 TO 8/4)L/S
TACK COAT(7/0 TO 9/2)B/S
TACK COAT(7/8 TO 9/2)R/S
TACK COAT(9/2 TO 11/2)L/S
DBM(7/0 TO 9/2)
TACK COAT(9/2 TO 11/2)R/S
DBM(9/2 TO 11/2)
PRIME COAT(5/380 TO 7/0)
TACK COAT(5/380 TO 7/0)L/S
TACK COAT(5/380 TO 7/0)R/S
DBM(5/380 TO 7/0)
PRIME COAT(4/2 TO 5/040)
TACK COAT(4/2 TO 5/040)L/S
TACK COAT(4/2 TO 5/040)R/S
DBM(4/2 TO 5/040)
PRIME COAT(2/0 TO 4/2)
TACK COAT(2/0 TO 3/6)L/S
TACK COAT(2/0 TO 4/2)B/S
TACK COAT(2/8 TO 4/2)R/S
DBM(2/0 TO 4/2)
PRIME COAT(0/7 TO 2/0)
TACK COAT(0/7 TO 2/0)L/S
TACK COAT(0/7 TO 2/0)R/S
DBM(0/7 TO 2/0)
PRIME COAT(0/260 TO 0/700)
TACK COAT(0/260 TO 0/700)L/S
DBM(0/260 TO 0/7)
BC TACK COAT(0/260 TO 2/4)L/S
BC TACK COAT(0/260 TO 2/4)R/S
BC TACK COAT(2/4 TO 5/040)L/S
BC TACK COAT(2/4 TO 5/040)R/S
BC LAYNING (0/260 TO 5/040)
BC TACK COAT(5/380 TO 8/0)L/S
BC TACK COAT(5/380 TO 8/0)R/S
BC TACK COAT(8/0 TO 11/2)L/S
BC TACK COAT(8/0 TO 11/2)R/S
BC LAYNING (5/380 TO 11/2)
PRICE ADJUSTMENT FOR POL,STEEL , CEMET& BITUMEN
Total
1 POL 653016.98
2 Cement -583455.18
3 Steel -14968.46
4 Bitumen 1032714.38
1087307.72