Professional Documents
Culture Documents
Appendix B': Engineering & Technology
Appendix B': Engineering & Technology
Appendix ‘B’
5 Library Staff strength - One Assistant Librarian Assistant Librarian and Library
- One Library Assistant Assistant to be appointed as per
ipu.ac.in/norms/regulations/normengg.htm 1/8
4/16/2019 GGSIPU
Q & E and in pay scale as
prescribed by the
Vishwavidyalaya
8 Land Area
· Within DDA/MCD limits 5 acres Total land area for permanent
site of the Institution required
· Outside DDA/MCD limits 10 acres should be in clear possession of
the Society and should not be
25 acres in more than 2 adjacent plots.
· Rural Area
a) Class Rooms Carpet area @ 1.3 sqm carpet · There should be one
area per student in a class classroom per discipline.
· For the First Year of all
disciplines, there should be
2 additional tutorial rooms.
· The distance between the
blackboard and the first
row of students should not
be less than 2.5 meters (8
ft).
· Blackboards should be of
adequate size and of good
quality (made of glass or
plastic coated)
· Lighting and fans should
be adequate and in
working condition.
ipu.ac.in/norms/regulations/normengg.htm 2/8
4/16/2019 GGSIPU
b) Drawing Halls/Studios Carpet area @ 2.6 sqm carpet · One drawing hall required
area per student for drawing for First year batch
class of 30 students · The distance between the
blackboard and the first
row of students should not
be less than 3 meters
(about 10 ft).
· Blackboards should be of
adequate size and of good
quality (made of glass or
plastic coated)
· Lighting and fans should
be adequate and in
working condition.
c) Central Library Carpet area @ 0.5 sqm per · Reading room and stack
student in the Institution area should be separated
from each other
· Lighting and fans should
be adequate and in
working condition.
ipu.ac.in/norms/regulations/normengg.htm 3/8
4/16/2019 GGSIPU
f) Laboratories for Core Carpet area in sqm for a batch · Labs corresponding to the
Courses size of 20 students First Year curricula should
be available.
· All laboratories should be
Physics 200 well lighted.
· Sufficient exhaust fans
Chemistry 175 should be provided in
Chemistry Lab.
Mechanics & Kinematics 100 · Waste disposal from the
Chemistry Lab must be
Materials Testing/Strength of 200 environment friendly.
Materials · All laboratories must have
updated first aid boxes.
Electrical Engineering 200 · All Lab Technicians/Lab
Assistants should be tested
for skill in giving first aid.
· All laboratories must have
at least 2 sets of
appropriate type of fire
extinguishing equipment.
Expiry of these may be
checked.
· Administrative Offices
Reception 25
Strong Room 20
Stores 50
11 Built Space (carpet area in sqm) for
Amenities
There are to be separate toilets
· Toilets 10 sqm per 100 students for male and female students
with appropriate facilities and
disposal facilities.
ipu.ac.in/norms/regulations/normengg.htm 4/8
4/16/2019 GGSIPU
Capacity For 10% of male students and
for
25% for female students
· Books
ipu.ac.in/norms/regulations/normengg.htm 5/8
4/16/2019 GGSIPU
Surveying 100
16 Built Space (carpet area in sqm for a
batch of 20 students) for
Electrical Engineering
Laboratories
Metrology 100
Microwave Devices 75
Communication Systems 75
Metal Forming 75
Heat Treatment 50
Corrosion 50
21 Built Space (carpet area in sqm for
a batch of 15 students) for
Computer Engineering
Laboratories
Computer Design 50
22 Built Space for Production/
Manufacturing Engg Laboratories
CAD/CAM System
75 The laboratories in the first
Robotics & Automation year should be set up with
50 respect to the prescribed
Non-traditional Machines curriculum.
50
Production Management
50
Additional Observations
ipu.ac.in/norms/regulations/normengg.htm 8/8