This document appears to be construction plans and estimates for two housing projects consisting of multiple pages. It includes tables with dimensions, volumes, and descriptions of various building components for different blocks. The first page provides estimates for internal wall plastering work totaling 543.53 units and 88.80 units for two separate blocks. The second page lists dimensions and estimates for internal exposed beams, columns, and roof beams.
This document appears to be construction plans and estimates for two housing projects consisting of multiple pages. It includes tables with dimensions, volumes, and descriptions of various building components for different blocks. The first page provides estimates for internal wall plastering work totaling 543.53 units and 88.80 units for two separate blocks. The second page lists dimensions and estimates for internal exposed beams, columns, and roof beams.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
This document appears to be construction plans and estimates for two housing projects consisting of multiple pages. It includes tables with dimensions, volumes, and descriptions of various building components for different blocks. The first page provides estimates for internal wall plastering work totaling 543.53 units and 88.80 units for two separate blocks. The second page lists dimensions and estimates for internal exposed beams, columns, and roof beams.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Contracter Name Site supervisor Project Engineer Project________Asella Housing Development Page Block ………… T-9 Block Name …………….. ABEBE Gobena No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition 2 1.81 1 0.81 0.10 0.12 Ditto but bottom sides 0.10 Above door 1 1.21 2 9.82 0.10 0.12 ditto 2.36 Axis-C 1 0.60 1 2.30 0.20 0.20 Ditto but sides 0.46 Ditto 0.71 2 9.82 0.10 0.12 Ditto but bottom sides 2.36 Axis-D 563.10 Total 2 12.43 651.90 Total internal plastering 0.12 2.98 Axis-1 To the internal Exposed 4 12.43 Beam & columns 0.12 I). To the second floor 5.97 Axis-2 4 2.83 Column 4 3.81 0.2 0.12 2.26 Axis-A 1.83 Axis-3 between A-B 6 3.52 2 7.62 0.2 0.12 4.22 Axis-1(c1) 1.83 Axis-5 2 3.52 2 3.41 0.4 0.12 2.82 ditto 0.82 Axis -4 B/n B-B' 3 2.5 2 2.53 0.25 0.6 1.88 Axis-B stair column 3.04 Stair Beam 3 3.52 29.22 Total Sum 0.4 4.22 Axis-B(c1) Ditto but to the second floor 7 3.52 roof beams 0.2 4.93 ditto 3 3.08 0.2 1.85 Axis-A between 3-5(c4) 2 3.03 0.2 1.21 Axis-B'(c4) 23.39 Total To the internal beam ground first floor 2 14.85 0.12 3.56 Axis-A between 1-5 2 14.85 0.12 3.56 Axis-B 1 1.81 0.2 0.36 Ditto but b/n 4-5 inside showeer Contracter Name Site supervisor Project Engineer Project________Asella Housing Development Page Block ………… T-9 Block Name …………….. ABEBE Gobena No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition Ditto but to the second floor roof beams 1 14.43 0.30 4.33 Axis-1 2 6.45 0.30 3.87 Axis A&D B/n 1-2 2 3.20 0.30 1.92 B/n Axis 2 &3 & B 1 1.90 0.30 0.57 Axis-A B/n 3-5 1 10.02 0.30 3.01 Axis-5 B/n AB 1 4 0.3 1.20 Ditto but B/n B-B' 1 3.80 0.3 1.14 Axis-B' B/n 4-5 1 5.1 0.3 1.53 Axis-5 B/n B-B' 1 3.61 0.3 1.08 Axis-3' B/n C-D 1 3.81 0.3 1.14 Axis-C &D B/n 2-3' 2 5.2 0.3 3.12 Axis-C &D B/n 1-2 1 5.61 0.3 1.68 Axis-B B/n 3-4 2 4.44 0.3 Edges of windows to internal On the second floor 2.66 6 1.81 0.2 2.17 9 1.21 0.21 2.29 4 0.71 0.2 0.57 32.28 Total sum 84.90 Total to summery
Contracter Name Site supervisor Project Engineer
Project__________________________Take of sheet No___________ PAGE_____ Block ……………….. Block Name …………….. No L/w/T Vol/Are Discrition No L/w/T Vol/Are Discrition