IR — INSPECTION REQUEST
WEST QURNAI—SECTION-A
Contractor No.: AWQ0109
ExxonMobil 5,
Produced Water Treatment M109
LOCATION: DS-8 | IRNO:IRNoCE-Co2a0 | iRISSUE DATE: 20 April 2017 DISCIPLINE: Civil
SUBJECT: Witness | INSPECTION REQUIRED DATE:22 Apfil 2017 TIME:12:30
REF.SPECIFICATION: 1QWA-FT-NSPOS-00-040901 REV.1 EARTHWORK
ren canainast 'QWA-CE1091-CDFND-D8-0002 REV.2_ FOUNDATION FOR PRE-SEPARATOR 1D
* ‘AB1681050 PLAN SECTION & DETAIL; DB
RFF, ITP: !QWQ-CE1092-CPQAC-00-0001 REV. ICIVIL INSPECTION AND TEST PLAN
OTHERS REF.:
ATTACHMENT /CHECK LIST IF ANY:
NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/MFCO
Our request the inspection of the following works for certificate/witness that all items has been properly executed in
accordance with approved procedures, specifications, drawings and all items has been coordinated with future works.
DISCRIPTION OF WORK TO BE INSPECTED:
‘Sampling the sub-grade layer inside the tank for the purpose of compaction degree test in DSB
COMMENTS: z
ama 45 not geocl. st
2
Agwreel Sth CREE @e comment LY
Giaccerreo ClaccePreo with comments Sresecreo
work is not ready
Dunacceptable inspection result
MSee comments
Tick THIS BOX IF “NO” EMIL/ SOC and if tis a “WITNESS” as per ITP,
{by ticking this box means CPECC needs to produce all the related documents and sign / close this IR)
SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT
SUBCONTRACTOR cvece ‘COMPANY OTHERS
PRINT NAME: PRINT NAME: PRINT NAME PRINT NAME
Aohabinad Sadi Ma Gran user Sha A
‘SIGNATURE: ‘SIGNATURE: See 2 ‘SIGNATURE:
pares 227-2017 | oar: av M~Ie/Z | are: 22 /A\P/7..19 | areExxonMobil dis
‘West Qumna | Form No. F70101Q
Contract:AWQ0109 Rev. 0
Project Location: Basra, Iraq INo. CE-C 0238
Ee
QUALITY CHECKSHEET - SOIL INSPECTION CHECKLIST
- PRODUCED WATER DSSMIO9 |
Tag Description | TRPATMENT | Tag No, i
Contract No. AWQ-0109 | System No.
Contractor CPEC ‘Sub-System No. | !QDS-ABI681050
| Dewing Reference | \WOCETOSI-CDFND-DE-GOG2 | Loeaton DSE |
Drawing No, 1QW0-cEt091-cDFND-Ds.0002
Specification No IQWQ-FT-NSPDS-00-040901_1
Inspection Reference Contractor | est auina |
1, Excavation cleared of foreign and loose material NA
2, Slopes shored or correctly stepped. NA
3. Fill Material cleans and conforms to requirements, v
4. Lift thickness and compaction procedures in accordance with specifications 4
5. Final elevation in accordance to drawings. v
6, Moisture control acceptable. ’
7. Compaction Method and Equipment ’
Remarks:
Contractor/Construetion Rep, Contractor/Quality Rep. Company Rep.
ane Moharinad Soci] [Nam Mg Groen Nan :
Signature: YE —— Sigutwe LP ‘Signature: |
Duce? 2-H 2017 [oe p= Y- aor} =