Professional Documents
Culture Documents
A Project On Estimation and Costing of Bricks and Steel Used in Radhakrishna Towers by
A Project On Estimation and Costing of Bricks and Steel Used in Radhakrishna Towers by
Done by,
Sweeya Sankuru (15E11A0107)
A.Vaishnavi (15E11A0101)
B.Poornima Jain (15E11A0102)
M.Sai teja (15E11A0131)
K.Bharat Reddy
Site engineer,
4. Costing of steel
5. Estimation and costing of bricks
6. Plans
7.Conclusion
Radha Krishna Towers
The RK towers is a under construction apartment been constructed by
Rami reddy constructions. The apartment is near pillar no 125, Attapur.
After Construction
Under Construction
MATERIALS USED
1. Steel:-
The sizes of steel rods used for the RK towers are 8mm, 10mm, 12mm,
16mm, 25mm and 30mm(in diameter).
The steel rods are placed in form of bundles.
Length of each rod is 12m or 40 feet.
Bricks:-
The bricks were cured in:-
The bricks were cut using:-
Estimation of steel:-
1.Beams
m m
Size of Length of Total
BEAM bar No.s bar Length
3 B1 12 12 4.826 57.912
16 6 3.6068 21.6408
16 12 1.2192 14.6304
4 B2 12 16 2.9337 46.9392
12 4 2.0193 8.0772
12 8 0.9144 7.3152
B3 16 4 5.1054 20.4216
16 4 1.3716 5.4864
16 2 3.7338 7.4676
B4 16 4 5.8674 23.4696
20 4 1.524 6.096
20 2 4.34 8.68
B5 20 4 7.0866 28.3464
25 4 1.8288 7.3152
25 2 5.5626 11.1252
B5 20 4 7.0866 28.3464
25 4 1.8288 7.3152
25 2 5.5626 11.1252
B6 25 4 7.8232 31.2928
25 6 1.9812 11.8872
25 3 5.842 17.526
B7 16 4 4.445 17.78
12 4 4.445 17.78
B8 16 8 1.9812 15.8496
16 4 0.0668 0.2672
16 4 0.9144 3.6576
16 8 2.1336 17.0688
B9 12 8 2.921 23.368
B1 12 4 4.4958 17.9832
16 2 3.2766 6.5532
16 4 1.2192 4.8768
0
B2 12 8 2.9337 23.4696
12 2 2.0193 4.0386
12 4 0.9144 3.6576
2.Strriups
Beam No.s Beam Size Dia Length of Stirrup
A B d 2(A+B)+20d
1 87 148.6 377.2 8 105409.2
2 168 148.6 377.2 8 203548.8
3 140 148.6 377.2 8 169624
4 40 148.6 377.2 8 48464
5 48 148.6 529.6 8 72787.2
6 45 148.6 529.6 10 70038
7 30 148.6 377.2 8 36348
8 73 148.6 377.2 8 88446.8
9 20 148.6 377.2 8 24232
10 18 72.4 377.2 8 19065.6
11 153 148.6 529.6 8 232009.2
12 110 148.6 529.6 10 171204
13 22 148.6 529.6 8 33360.8
14 37 148.6 377.2 8 44829.2
15 27 296.8 682 10 58255.2
16 24 148.6 377.2 8 29078.4
17 54 148.6 377.2 8 65426.4
18 31 148.6 377.2 8 37559.6
19 37 148.6 377.2 8 44829.2
1 90 148.6 377.2 8 109044
21 27 148.6 377.2 8 32713.2
22 19 148.6 377.2 8 23020.4
2 40 148.6 377.2 8 48464
29 50 377.2 682 10 115920
30 63 377.2 682 8 143539.2
26 50 148.6 529.6 8 75820
27 27 148.6 377.2 8 32713.2
28 29 148.6 377.2 8 35136.4
FB1 33 72.4 377.2 8 34953.6
2205839.6
3539.8
70113
Total steel:-
Total Steel Required
Dia Beam Stirrups Two way One way Total Steel Weight (Kgs)
8 707.3274 1188.729916 476.1358981 2372.19
10 256.4304 327.714 584.14
12 347.5591111 347.56
16 610.4417975 610.44
20 680.962 680.96
25 1243.503086 1243.50
Costing of steel:-
NOTE:Cost of steel for 1 ton = Rs.41,400/-
We used 8mm, 10mm, 12mm, 16mm, 20mm, 25mm diameter steel rods
=Rs.9,82000/-
=Rs.2,41,850/-
=Rs.1,43,900/-
=Rs.2,52,700/-
=Rs.2,81,900/-
=Rs.5,14,800/-
=103.2’
=1032 sft
DEDUCTIONS:
Windows(w) =3 (5 ’x 4’9”)
=71.25’
Ventilators(v)=2 (3 ’x2’)
=12’
=11.25’
Door(M/D)=(3’6” x 7’3”)
=25.37’
Door(D1/A)=(2’9” x 7’3”)
=19.93’
=1.5 sft
=Rs.23,800/-
INTERNAL WALL:
=69.54’
=695.4 sft
DEDUCTIONS:
=47.1’
=41.24’
=Rs 12,150/-
Total cost of bricks for flat no.1:Rs. 35,950/-
As per plan measurement of flat no.1 for 4 floors is same ,so the cost of bricks =Rs.1,43,800/-
#Flat no 2:-
EXTERNAL WALL:
=122.04’
=1220.4 sft
DEDUCTION:
=71.25’
=28.5’
Window(K/W)=(3’ x 3’9”)
=11.75’
Ventilator(v)=(3’ x 2’)
=6’
=25.37’
=19.93’
=1.5 sft
INTERNAL WALL :
=68.625 ‘
Area of internal wall =68.625’ x10’
=686.25
DEDUCTION:
=47.1’
= 41.24’
=1.5 sft
As per plan measurements of flat no. 2 are same ,so the cost of bricks =Rs.1,60,040/-
#Flat no 3:-
EXTERNAL WALLS:
=111’
=1110 sft
DEDUCTIONS:
=19.9’
=25.37’
=22.5’
=50’
INTERNAL WALLS:
=83.25’
=832.5 sft
DEDUCTIONS:
=47.1’
=41.24’
=9’
As per plan measurements of flat no. 3 for 4 floors are same, so the total cost of bricks
=Rs.1,62,800/-
#Flat no 4:-
EXTERNAL WALLS:
13’7”+3’+1’9”+3’+2’9’+3’6’’+9’5”+3’11”+5’+4’4’’+1’2½’’+1’2”+6’10”+1’10’+1’10’+2’
6”+2’9”+2’+1’9’’+5’+3’4 ½’’+3’
=104.04’
=1040 sft
DEDUCTIONS:
=25.26’
=20.62’
Windows(W) =2(5’ x 4’9”)
=47.5’
=22.5’
=11.25’
=6’
INTERNAL WALLS:
12’7”+7 ½’’+3’3”+9”+2’9”+4’+7’1
½’’+8’+2’9”+7’9”+4’+13’3”+9”+3’3”+3’3’+4’6”+3’9”+1’10 ½’’+3”+3’
=95.7’
Area of internal walls =957 sft
DEDUCTIONS :
=47.1’
=41.24’
=1.5 sft
As per plan measurement of flat no.4 for 4 floors are same ,so the total cost of bricks =Rs
.1,66,280/-
Drawings used for calculation of brick work are:-
1.Doors and windows plan:-
Flat no 1 plan:-
Flat no 2 plan:-
Flat no 3 plan:-
Flat no 4 plan:-
Conclusion
The total quantity of steel used in tons =58.36 tons .
The total number of bricks used =
1. 9 inch bricks =10,204 bricks .
2. 4 inch bricks = 7,492 bricks
The cost of steel =Rs. 24,17,150/-
The cost of brick =Rs. 6,32,920/-
So, the total costing of steel and bricks =Rs. 30,50,070/- .