Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Project Details

Project Name : EDIFICIO JULIO CESAR Address Line1 : Avenida fontana 115 La Molina

Number of Distinct Buildings : 4 Address Line2 :

Number of EDGE Subproject(s) : 1 City : Lima


associated
Total Project Floor Area : 8,600 m² State/ Province : Lima
Project Owner Name : julio cesar porras Postal Code : 01

Project Owner Email : u201510819@upc.edu.pe Country : Perú


Project Owner Phone : Office 01-961726304 Project Number : 1000474941

Share with investor(s) or bank(s)? : Yes


Associated Subproject(s)
julio cesar porras

Subproject Details
Subproject Name : julio cesar porras Address Line1 : Avenida fontana 115 La Molina

House or Apartment Block Name : cesar Address Line2 :

Subproject Multiplier for the : 1 City : Lima


Project
Certification Stage : Preliminary State/ Province : Lima
Status : Self-Review Postal Code : 01
Auditor : Country : Perú
Certifier : Subproject Type : New Building

Location Data

Country : Peru

City : Lima
Income Category : Lower Middle

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 1
Building Data Area Details
Default User Entry
Type of Unit : Flats/Apartments Bedroom : 60.0 80 m²

Average Unit Area : 200 m² Kitchen : 35.0 40 m²


Bedrooms/Unit : 4 no. Living/Dining : 75.0 70 m²
Floors : 10 no. Bathroom : 18.0 20 m²
Units : 40 no. Utility, Balcony, Service Shaft** : -10.00 m²
Occupancy (People/Unit) : 30 no. Gross Internal Area : 200 m²

External Wall Length m/Unit : 30.0 30 m


Roof Area/Unit : 20.0 30 m²
Window to Floor Ratio : 11.0%
Common Area/Unit : 14.0 15 m²
**The Utility, Balcony, Service Shaft (m²) field is equal to the remaining
space required to total the Gross Internal Area (m²).

Building Systems
Does the building design include an AC system? : Yes
Does the building design include a space heating system? : Yes

Key Assumptions for the Base Case


Default User Entry
Monthly Average Outdoor
Fuel Used for Hot Water : Electric Resistance Electric Resistance Temperature (deg.C)
Fuel Used for Space Heating : Electricity Electricity
Cost of Electricity : 0.40 S/kWh Default User Entry
Cost of Diesel Fuel : 1.80 S/L Jan : 22.5
Cost of LPG/Natural Gas : 1.86 S/L Feb : 23.2
Cost of Water : 3.21 S/kL Mar : 23.1
CO₂ Emissions g/kWh of Electricity : 492 g/kWh Apr : 20.9
Window to Wall Ratio : 30% % May : 19.2

Solar Reflectivity for Paint - Wall : 70% % Jun : 18.5


Solar Reflectivity for Paint - Roof : 30% % Jul : 17.0
Hot Water Boiler Efficiency : 80% % Aug : 16.6
Roof U-value : 2.20 W/m².K Sep : 17.1
Wall U-value : 2.36 W/m².K Oct : 17.8

Glass U-value : 5.70 W/m².K Nov : 19.3


Glass SHGC : 0.80 Factor Dec : 21.5
AC System Efficiency : 2.90 COP Latitude : 12 Deg

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 2
RESULTS
Final Energy Use : 2295.33 kWh/Month/Unit Operational CO₂ Savings : 0.00 tCO₂/Year/Unit
Final Water Use : 167.44 kL/Month/Unit Embodied Energy Savings : 0.00 MJ/Unit
Base Case Utility Cost : 1446.45 S/Month/Unit Incremental Cost : - S/Unit
Utility Cost Reduction : - S/Month/Unit Payback in Years : NA Yrs.
Energy Savings : 0.00 MWh/Year Water Savings : 0.00 m³/Year
Embodied Energy in Materials : 0.00 GJ Aggregate Floor Space : 8600.00 m²
Savings Including Multiplier

Energy Efficiency Measures 0.00% ENERGY SAVINGS

CARBON EMISSIONS: 13.56


tCO₂/Year/Unit

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 3
No HME01 Reduced Window to Wall Ratio - WWR of 25% WWR %

No HME02 Reflective Paint/Tiles for Roof - Solar Reflectivity (albedo) of 0.7 SR


No HME03 Reflective Paint for External Walls - Solar Reflectivity (albedo) of 0.7 SR
No HME04 External Shading Devices - Annual Average Shading Factor (AASF) of 0.51 AASF

No HME05 Insulation of Roof : U-value of 0.45


No HME06 Insulation of External Walls : U-value of 0.46
No HME07 Low-E Coated Glass : U-value of 3 W/m².K and SHGC of 0.45

SHGC
No HME08 Higher Thermal Performance Glass : U-value of 1.9 W/m².K and SHGC of 0.28

SHGC
No HME09 Natural Ventilation

No HME10 Ceiling Fans in All Habitable Rooms

No HME11 Air Conditioning System - COP of 3.5 COP


No HME12 High-Efficiency Boiler for Space Heating - Efficiency of 95% % Eff.
No HME13 High-Efficiency Boiler for Hot Water - Efficiency of 95% % Eff.
No HME14 Heat Pump for Hot Water - COP of 3 COP
No HME15 Energy-Efficient Refrigerators and Clothes Washing Machines

No HME16 Energy-Saving Light Bulbs - Internal Spaces


No HME17 Energy-Saving Light Bulbs - Common Areas and External Spaces

No HME18 Lighting Controls for Common Areas and Outdoors

No HME19 Solar Hot Water Collectors - 50% of Hot Water Demand % Hot Water

Collector Area (m²)/Unit -

No HME20 Solar Photovoltaics - 25% of Total Energy Demand % of Annual Electricity Use

Capacity kWp/Unit -
No HME21 Smart Meters
No HME22 Other Renewable Energy for Electricity Generation Source Type Biomass
% of Annual Electricity Use
No HME23 Offsite Renewable Energy Procurement - Equal to 100% of Total Operational CO2 % Annual Operational CO2
kWh/Year -
No HME24 Carbon Offset - 100% of Total CO2 % Annual Operational CO2

tCO2/Year/Unit -

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 4
Water Efficiency Measures 0.00% WATER SAVINGS

No HMW01 Low-Flow Showerheads - 8 L/min L/min


No HMW02 Low-Flow Faucets for Kitchen Sinks - 6 L/min L/min
No HMW03 Low-Flow Faucets in All Bathrooms - 6 L/min L/min

No HMW04 Dual Flush for Water Closets in All Bathrooms - 6 L/first flush and 3 L/second flush 1st - L/flush
2nd - L/flush
No HMW05 Single Flush for Water Closets - 6 L/flush L/flush
No HMW06 Rainwater Harvesting System - 50% of Roof Area Used for Rainwater Collection % of Roof Area Used
No HMW07 Recycled Grey Water for Flushing

No HMW08 Recycled Black Water for Flushing

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 5
Materials Efficiency Measures 0.00% Embodied Energy Savings

HMM01 Floor Slabs Proportion % Thickness Steel Rebar


In-Situ Reinforced Concrete In-Situ Reinforced Concrete Slab mm kg/m²
Slab
300 mm
Steel : 33 kg/m²

HMM02 Roof Construction


In-Situ Reinforced Concrete Type 1 In-Situ Reinforced Concrete Slab 100% mm kg/m²
Slab
300 mm
Steel : 33 kg/m²

HMM03 External Walls


Common Brick Wall with Type 1 Common Brick Wall with Internal & External Plaster 100% mm
Internal & External Plaster
200 mm

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 6
HMM04 Internal Walls Proportion % Thickness
Common Brick Wall with Type 1 Common Brick Wall with Plaster on Both Sides 100% mm
Plaster on Both Sides
100 mm

HMM05 Flooring
Ceramic Tile Type 1 Ceramic Tile 100%

HMM06 Window Frames


Aluminium Type 1 Aluminium 100% Single Glazing
Single Glazing

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 7
EDGE Certification Checklist
Building Type Certification Stage Subproject Name
Homes Preliminary julio cesar porras
Material Measures Preliminary Audit Requirements
HMM01 Floor Slabs > Floor sections showing build-up of the floor; or
> Manufacturer’s data sheet for specified building material if applicable; or
> Bill of quantities with the floor slab specification clearly highlighted.

HMM02 Roof Construction > A section drawing of roof showing the materials and thicknesses; or
> Manufacturer’s data sheet for specified building material; or
> Bill of quantities with the materials used for roof construction clearly highlighted.

HMM03 External Walls > Façade drawings clearly marking the external wall specification selected; and
> Drawings of the external wall sections; or
> Manufacturer’s data sheet for specified building material; or
> Bill of quantities with the materials used for the external wall clearly highlighted.

HMM04 Internal Walls > Drawings of the internal wall sections; or


> Manufacturer’s data sheet for building materials used for internal wall specifications if available; or
> Bill of quantities with the materials used for the internal wall clearly highlighted.

HMM05 Flooring > Drawings clearly marking the flooring specification selected; or
> Manufacturer’s data sheet for building materials used for floor specifications; or
> Bill of quantities with the materials used for the flooring clearly highlighted.

HMM06 Window Frames > Façade drawings clearly marking the window frame(s) specification; or
> Manufacturer’s data sheet for glazing specified; or
> Bill of quantities with the windows/window frames clearly highlighted.

Created By : julio porras File Number : 19041110065659 EDGE Version : 2.1.5


Modified By : julio porras Project No. : 1000474941 Date Time : 11-Apr-2019 10:45:23 8

You might also like