Form No.

PROJECT :
SERVICE : ELECTRICAL

LIGHTNING PROTECTION- INSTALLATION CHECKLIST

Tower/Level :

Model no./Serial no. :

Note : 1 Complete all boxes during site inspection


2 Denotes acceptable result
3 Denotes unacceptable result
4 Remark to describe correction required before item is acceptable

Item Description Yes No Remarks

1 Location as per drawing

2 Check Air terminal( vertical/ horizontal in alignment)

3 Bare cable/ copper tape size

4 Check junction box/ test link

5 Measuring earthing resistance in test box after connecting

6 Check continuity of all conductor, bonds and joints

7 Check the stability of cable clamps

8 Earth test result

ACCEPTED RE-INSPECTION REQUIRED

ACCEPTED WITH COMMENTS NOT ACCEPTED

Installed By :
(Name & Signature) (Date & Time)

Inspected & Checked By :


(Name & Signature) (Date & Time)
Witnessed & Accepted By :
(Name & Signature) (Date & Time)