C1 Block

S.No Description Nos Length Breadth Depth Total Remarks


1 Excavation 2,037.00 1.20 2,444.40
2 Pilling 247 1.13 12.80 3,572.61
3 6,017.01 m3
4
5
6 Filling 1,083.00 1.75 1,895.25 Pour 1
7 954.00 1.60 1,521.63 Pour 2
8 3,416.88
9 Deduction
10 Pile cap-3 grp 53 2.40 0.90 1.20 (137.38)
11 2 grp 36 4.33 1.00 1.20 (187.06)
12 Lift 3 4.50 3.90 1.20 (63.18)
13 1 4.25 4.35 1.20 (22.19)
14 Plinth beam 6 83.85 0.50 0.30 (75.47)
15 Blockwork 1 216.50 0.20 0.70 (30.09)
16 Column 100 1.30 0.30 0.70 (27.11)
2,874.42 m3
Balance 3,142.59 m3

For C1,2,3 Block


Total Earth
Excavation 17,074 m3
Filling 6,814 m3
Balance 10,260 m3
C2 Block
S.No Description Nos Length Breadth Depth Total
1 Excavation 2,037.00 1.20 2,444.40
2 Pilling 247 1.13 12.80 3,572.61
3 6,017.01
4
5
6 Filling 1,083.00 1.83 1,976.48
7 954.00 1.68 1,597.95
8
9 Deduction
10 Pile cap-3 grp 53 2.40 0.90 1.20 (137.38)
11 2 grp 36 4.33 1.00 1.20 (187.06)
12 Lift 3 4.50 3.90 1.20 (63.18)
13 1 4.25 4.35 1.20 (22.19)
14 Plinth beam 6 83.85 0.50 0.30 (75.47)
15 Blockwork 1 216.50 0.20 0.77 (33.34)
16 Column 100 1.30 0.30 0.77 (30.03)
3,025.79
Balance 2,991.22
C3 Block
Remarks S.No Description Nos Length Breadth Depth
1 Excavation 1,676.00 1.20
2 Pilling 180 1.13 12.80
m3 3 20 1.13 18.80
4
5
Pour 1 6 Filling
Pour 2 7 715.00 1.90
3,574.43 8
9 Deduction
10 Pile cap-3 grp 46 2.40 0.90 1.20
11 2 grp 30 4.33 1.00 1.20
12 Lift 1 5.50 4.30 1.20
13 1 5.50 3.90 1.20
14 Plinth beam 6 69.00 0.50 0.30
15 Blockwork 1 186.00 0.20 0.77
16 Column 82 1.30 0.30 0.77
m3
m3 Balance
Total Remarks
2,011.20
2,603.52
424.88
5,039.60 m3

1,358.50 Pour 2

(119.23)
(155.88)
(28.38)
(25.74)
(62.10)
(28.64)
(24.62)
913.90 m3
(489.02) m3