Toilet Block Estimate: Abstrct
Toilet Block Estimate: Abstrct
ABSTRCT
Sr. No. Description Unit Quantity Rate Amount (Rs.)
1 Excavation Cum 8 250 2066
2 Filling Cum 10 300 3047
3 PCC Cum 2 5000 8265
4 Brickwork Cum 8 6000 48000
5 Plaster Sq. m 35 250 8750
6 Tiling Sq. m 25 800 19784
7 Painting Sq. m 18 110 1975
8 Urinals Nos. 2 800 1600
9 WC Nos. 1 2000 2000
10 Washbasin Nos. 1 800 800
11 Doors Nos. 2 5000 10000
12 Ventilators Nos. 3 1500 4500
13 Water Tank Nos. 1 5000 5000
14 Profile Sheet with purlins LS 1 12000 12000
Plumbing ,Sanitoring ,
15 LS 1 10000 10000
fixtures & fitting
16 Electric Fitting LS 1 10000 10000
Total 147787
Sr. No. Perticular oF items and Details of Works No. unit Length Widht
5 PCC cum
Long wall 1 cum 3.66 0.3
Short Wall 2 cum 1.85 0.3
7 Tiling Sq. m
Floor Tile 1 3.66 1.85
Wall Tile
Long Wall 2 3.66 1.22
Short wall 4 1.85 1.22
8 Purline
9 Profile Sheet
10 Painting Sq. m
long wall 2 3.66 1.22
Short wall 4 1.85 1.22
11 Urinols 2 Nos.
12 WC 1 Nos.
13 Wash Basin 1 Nos.
14 Plumbing, Sanitoring Fixtures & fitting LS
15 Electric Fitting LS
16 Doors 2 Nos.
17 Ventilators 3 Nos.
18 Water Tank 1 Nos.
Height Quentity
1.5 5.5
1.5 2.8
8.3
1.5 10.2
0.2 0.4
0.2 0.3
1.1 0.9
0.2 0.4
0.2 0.3
1.1 0.9
0.15 0.1
0.15 0.1
2.5 2.1
2.3 2.0
2.3 1.0
8.6
1.1
0.6
1.7
2.5 18.3
2.3 17.0
2.3 4.3
39.6
6.8
8.9
9.0
24.7
8.9
9.0
18.0
2.0
1.0
1.0
2.0
3.0
1.0