Para -84: But for Calculation and levy of penalty, For calculations and Levy of penalty, the time frame
“The time frame agreed” needs to be specified in agreed by the both the parties is specified in the
the DWA, as the DWA is a legal document and DWA as per clause 7 of payment vide Sl. No. 1,2,3
binding on both the parties for execution and 4 stages of payment separately and to read
accordingly.
Para-85: We can certify the expenditure, after a) Even though the total expenditure on TPIA is
a) Obtaining approval of the MD, BESCOM as the 313.13 Lakhs it’s combined amount of 6
proposed expenditure in RS.313.13 Lakhs enquires and the details of Budget required
b) Furnishing the details of budget grants for each enquires is as in below table and the
sanctioned to NJY Phase – III works amount varies from minimum 36.22 lakhs to
Maximum 62.99 Lakhs as stated below
1. TPIA-1- Madhugiri Dv - 49.28 Lakhs
2. TPIA-2 –Tumkur & Tiptur -56.88 Lakhs
3. TPIA-3 –Davanagere – 62.99 Lakhs
4. TPIA-4 – BRC - 36.22 Lakhs.
5. TPIA-5 – Ramanagara – 50.34 Lakhs
6. TPIA-6 – Kolar – 57.42 Lakhs.

b) The total Budget grants available for


sanctioned for NJY Phase – III for 16-17 is
600 Crores

Para 87: Discussed the negotiation issue and During negotiation meeting held on
observed that: 26/05/2016 with D(T) BESCOM all the 6
As per para 44 (130 in PLO dt:25/05/2016) MD, enquires are negotiated but the firm accept
BESCOM has directed to call for negotiation to reduce the % quotes for highest rate i.e.
meeting on 26/05/2016. But, the meeting .72% and .89% to 0.65% . But the firms are
proceedings is not traced in the file, instead as not accepted to reduce the other enquires
per para 52, it is noted that the negotiation which all are already at the lowest rates from
meeting was held on 17/05/2016 and requested 0.65%, which are .62%, 0.49%, 0.49% and
to award the work at the negotiated rate as 0.55% as noted in the para 81 and can be
agreed on 17/05/2016. taken note. Hence the Negotiation process
For Which D(T), BESCOM has accorded approval completed and the same is highlighted to MD
vide para 53 (135 in PLO Dt:3/6/2016). Hence, it BESCOM by DT and approval accorded in PLO
could not be assessed as to whether the Dt: 03/06/16.
Para 88 (1): Once Managing Director has made Observation complained in Para 87.
remarks in the file, we have to execute the orders
as per directions and again we have to place the
subject before MD for approval
Para 88 (2): In this case orders we have to place As complained in Para 87 to consider the
the results of negotiation and concurrence from negotiation meeting of 26.05.2016 and the
MD is to be obtained before issued of award. percentages are well with in the limits to
accept and accord approval to issue DWA’s to