Foundation Layout For Star TWR PDF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

OW NER.

00 01
MK238 WA-XXXXXX Q 4400005604
NOTES
REV. NO. SHEET NO. DRAWING NUMBER PLANT NO. INDEX JOB ORDER NO.

1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE


NOTED.

TS
OF I
CONSENT
C (B/B OF STUB AT GROUND LEVEL)
| OF FOUNDATION
A (B/B AT TOP OF STUB)

| OF CHIMNEY

TTEN
| OF CHIMNEY

THE W RI
790

THOUT
PUNCH MARK FOR TOP
OF CONCRETE LEVEL (TOC)
1290

A TOP OF FOUNDATION
| OF FOUNDATION

WI
TOC
A

FDN.

DOCUMENT
9
500

EXPOSED
a
32
2.

=
77
10

TOP OF STRUCTURE PAD


.
=

67
1

S
THI
300

FROM
EXISTING GROUND LEVEL

NED
SHALL BE OBTAI
PEDESTAL

- SECTION A-A LEGEND


SCALE = N.T.S.

- TOC = TOP OF CONCRETE

C/C = CENTER TO CENTER


| OF TOWER

PART
B/B = BACK TO BACK

CA/CA = CENTROIDAL AXIS TO CENTROIDAL AXIS


4000

N
I
P (B/B AT BOTTOM OF STUB)

FULL OR
3700

N
I ON
- ELEVATION

REPRODUCTI
SCALE = N.T.S.

-
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.

NO
DRAWING CONTROL SHEET WE-401392
| OF FOUNDATION
PROJECT TECHNICAL SPECIFICATION PTS-12WO116

CO.
STUB & CLEAT DRAWING FOR "HA-120" TOWER WA-400857

TY
STUB SETTING TEMPLATE DRAWING WA-294364

CI
SHOP AND ERECTION DRAWING WA-294365

SAUDIELECTRI
TOWER / MONOPOLE GROUNDING DETAILS WA-294555

| OF FOUNDATION | OF FOUNDATION

H
R

OF
| OF TOWER

ARE THE SOLE PROPERTY


R

AS-BUILT BY DATE

STUB SETTING ARRANGMENT WITH FOUNDATION "HA-120" TYPE TOWER

N
HEREI
| OF FOUNDATION

NO. BODY EXTENSION A C P R H 00 22/02/18 AK ISSUED FOR APPROVAL MNK

NED
1 BB+L1.5 9,448.00 9,971.00 10,617.25 11,453.14 16,197.19 REV. DATE BY DESCRIPTION CHKD. CERT. APPD.
NO.

CONTAI
2 BB+L3 10,056.00 10,579.00 11,225.25 12,061.14 17,057.03 | OF TOWER

3 BB+L4.5 10,664.00 11,187.00 11,833.25 12,669.14 17,916.88

4 BB+L6 11,272.00 11,795.00 12,441.25 13,277.14 18,776.72

ON
NFORMATI
5 BB+6BE+L1.5 11,880.00 12,403.00 13,049.25 13,885.14 19,636.56

6 BB+6BE+L3 12,488.00 13,011.00 13,657.25 14,493.14 20,496.40 R


AZ/TE MNK N.T.S
DRAWN BY CHECKED BY SCALE:
7 BB+6BE+L4.5 13,097.00 13,619.00 14,266.17 15,102.00 21,357.46
| OF FOUNDATION | OF FOUNDATION 10/04/2015 _________

THE I
DATE STARTED DATE COMPLETED
8 BB+6BE+L6 13,705.00 14,227.00 14,874.17 15,710.00 22,217.30
OPR’G. DEPT. ENG. DEPT.

THIS DRAWING IS NOT TO BE USED FOR CERTIFIED

AND
CONSTRUCTION OR FOR ORDERING
MATERIAL UNTIL CERTIFIED AND DATED BY DATE

- PLAN

NG
FOUNDATION LAYOUT FOR TOWER TYPE "STAR"

DRAW I
SCALE = N.T.S.
CONSTRUCTION OF 110 kV D/C OHTL FOR
- WALLI AL AHAD-2 S/S WITH NETWORK

S
MAKKA SAUDI ARABIA

THI
JOB ORDER NO. INDEX PLANT NO. DRAWING NUMBER SHEET NO. REV. NO.

4400005604 Q MK238 WA-XXXXXX 02 00


SEC-A (2004/10)

DMS VECTOR SECA00

You might also like