The document shows displacements in the x, y, and z directions (UX, UY, RZ) for diaphragms on floors 21 through 18 of a building under different load cases including dead, live, wall, and earthquake (EQX, EQY) loads. Maximum and minimum displacements are given for combination (COMB) load cases. Locations are identified by point and coordinates.
The document shows displacements in the x, y, and z directions (UX, UY, RZ) for diaphragms on floors 21 through 18 of a building under different load cases including dead, live, wall, and earthquake (EQX, EQY) loads. Maximum and minimum displacements are given for combination (COMB) load cases. Locations are identified by point and coordinates.
The document shows displacements in the x, y, and z directions (UX, UY, RZ) for diaphragms on floors 21 through 18 of a building under different load cases including dead, live, wall, and earthquake (EQX, EQY) loads. Maximum and minimum displacements are given for combination (COMB) load cases. Locations are identified by point and coordinates.
Operations of The 899th Tank Destroyer Battalion (Attached To The 4th Infantry Division) For The Period 2-18 June, 1944, On The Normandy Peninsula (Normandy Campaign)