Professional Documents
Culture Documents
Sequencial Batch Reactor With 2 SBR Tank Makati City: Twt1 Twt2
Sequencial Batch Reactor With 2 SBR Tank Makati City: Twt1 Twt2
PR1 PR2 L1 TB3 TB5 PR5 PR6 PR7 L1 TB17 TB12 PR10
TB1 TB2 FROM NO.6 PIN TB15 TB16 FROM NO.6 PIN
TWT1 TWT2
SBR TANK, CUT-OFF TP1 TB9 SBR TANK, CUT-OFF TP2 TB20
HWL DP1 HWL DP1
7 7
L2 L2
L2 TB2
L2 L2
5 Amps.
TB1 230V
L1 L1
A M A M
PR11 PR12 PR13 PR14 SS3 SS4
TB1 A1 TB15 B1 C3 D3
C1 L1A D1 L1A
A A M A M
M SS1 SS2
TB23 TB27 TB2 63 63 TB16 63 63
SP1 EP1 SS1 MC1 MC2 21 MC1 MC2 21
TB21 TB25 64 64 64 64
EX-SS1 EX-SS2 MC3 MC4
SP1 OR SP2, EP1 OR EP2, A2 B2 22 22
TB24 TB28 C4 D4
LWL LWL
SP2 EP2 TB10
SUMPIT PUMP EFFLUENT PUMP
TB1 L1A L1A C7 TB21 D7
INDICATOR
EXCHANGE RELAY
INDICATOR
EXCHANGE RELAY 5 6
23 PR3 PR8
TB22 TB26 21 23 21 3 4
PLG N.C. N.C. PLG N.C. N.C. MC1 M1 MC2 M2
4 5 4 5 24 5 6
A3 22 24 B3 22 PR4 RL3 PR9 RL4
N.O. N.O. N.O. N.O. 1 2
3 6 3 6
+ + A2 A3 B2 B3 TB11 TB22
- 2 7 - 2 7 C1
1 8 1 8 MC1 GL1 RL1 MC2 GL2 RL2 23 23
MC3 MC4
24 24
TB2
MC3 GL3 MC4 GL4
L2 L2
PR11 PR12 PR13 PR14
C2 D2
97 97 97 97
OLR 1 OLR 1 OLR 1 OLR 1
98 98 98 98
5 Amps.
TB2 230V
L2 L2 L2 L2 L2 L2
SUBMERSIBLE BLOWER-1 IN SUBMERSIBLE BLOWER-2 IN TRANSFER PUMP-1 IN TRANSFER PUMP-2 IN
L1 SBR TANK 1 SBR TANK 2 SBR TANK 1 SBR TANK 2
220V
TB9 TB20
DP1 DP2 A M A M A M A M A M
E3 A E3 A SS7 SS8 SS7 SS8 SS9 A
M M M
SS5 SS6 F1 G1 SS10
L1A L1A F1 L1A G1 L1A L1A L1A H3 L1A L1A
E1 E1 TB23 TB27 H1
F3 TB24 F3 TB28
21 21 21 21 21 21 21 21
MC5 MC6 MC7 MC8 MC7 MC8 MC9 MC10
E6 22 E6 22 22 22 22 22 22 22
9 9
MC5 MC6 I1
5 5
E1 E1 I3
F1 G1 F1 G1
E7 E7 F5 G5 F5 G5 H4
23 23 H1
MC5 MC6 23 23 23 23 23
RL5 RL6 MC7 MC8 MC10 RL10
24 24 MC7 MC8 23
24 24 24 24 24
E1 E1 MC9
24
MC5 GL5 MC6 GL6 I1
MC7 GL7 RL7 MC8 GL8 RL8 MC7 GL7 RL7 MC8 GL8 RL8 RL9
MC9 GL9 MC10 GL10
E2 E2
I2
E2 E2 F2 G2 F2 G2 H2 I2
97 97 97 97 97 97 97 97
OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1
98 98 98 98 98 98 98 98
L2 L2 L2 L2 L2
L2
DECANTER PUMP-1 IN DECANTER PUMP-2 SUMPIT PUMP 1 SUMPIT PUMP 2 EFFLUENT PUMP 1 EFFLUENT PUMP 2 CHLORINATOR PUMP WAS PUMP
SBR TANK 1 SBR TANK 2 COMMON IN EQUALIZATION TANK COMMON IN EQUALIZATION TANK COMMON IN SBR TANK 1&2 COMMON IN SBR TANK 1&2
ENGINEER/S: OWNER: DESIGN BY: SHEET CONTENTS: SHEET NO.
FROM THE OFFICE OF: PROJECT TITLE: REMITECHS ELECTRICAL SERVICES
DRAWN BY:
JERRY O. SAVELLA
CHECKED BY:
RES-CHEM-EARTH TECHNOLOGIES SEQUENCIAL BATCH REACTOR WITH 2 SBR TANK MAKATI CITY
PRC PTR PRC PTR
APPROVED BY:
REVISION :
CONTROL WIRING DIAGRAM E-2
PLACE TIN PLACE LOCATION: DATE :
JANUARY 25, 2019.