CONTROL WIRING DIAGRAM FOR 2 UNITS SBR TANK

L1 PROCESS IN SBR TANK 1 PROCESS IN SBR TANK 2


TB1
L1

PR1 PR2 L1 TB3 TB5 PR5 PR6 PR7 L1 TB17 TB12 PR10

TB1 TB2 FROM NO.6 PIN TB15 TB16 FROM NO.6 PIN
TWT1 TWT2

SBR TANK, CUT-OFF TP1 TB9 SBR TANK, CUT-OFF TP2 TB20
HWL DP1 HWL DP1

TB5 DP1 TB12 DP2


SUBMERSIBLE BLOWER 1 TB6 TP1 FS IN SBR TANK 1 PR2 LWL SUBMERSIBLE BLOWER 2 TB13 TP2 FS IN SBR TANK 2 PR7 LWL
INDICATOR LWL TB4 INDICATOR LWL TB18
DECANTER PUMP 1 DECANTER PUMP 2
TRANSFER PUMP 1 TRANSFER PUMP 2
PLG INDICATOR
INDICATOR PLG INDICATOR
INDICATOR

TB7 TB8 TB14 TB19


TB5 13 PLG TB12 13 PLG
PLG PLG
TO DECANTER PUMP 1 PR4 TO DECANTER PUMP 2 PR9
CONTROL CONTROL
14 14
2 TC TC 2 TC TC
5 TC 3 TO 8 8 5 TC 3 TO 8 8
TWT1 TWT1 TWT1 2 29 ODT1 2 ODT2 TWT2 TWT2 TWT2 2 29 ODT3 2 ODT4
8 1 5 5 8 1 5 5
7 26B 26B ODT1 ODT2 7 26B 26B ODT3 ODT4
7 7 7 7
L2 2 31
L2 L2 2 31
L2
PR1 PR2 PR3 PR5 PR6 PR7 PR8 PR10

7 7
L2 L2

L2 TB2
L2 L2

5 Amps.

TB1 230V
L1 L1

A M A M
PR11 PR12 PR13 PR14 SS3 SS4
TB1 A1 TB15 B1 C3 D3
C1 L1A D1 L1A
A A M A M
M SS1 SS2
TB23 TB27 TB2 63 63 TB16 63 63
SP1 EP1 SS1 MC1 MC2 21 MC1 MC2 21
TB21 TB25 64 64 64 64
EX-SS1 EX-SS2 MC3 MC4
SP1 OR SP2, EP1 OR EP2, A2 B2 22 22
TB24 TB28 C4 D4
LWL LWL
SP2 EP2 TB10
SUMPIT PUMP EFFLUENT PUMP
TB1 L1A L1A C7 TB21 D7
INDICATOR
EXCHANGE RELAY
INDICATOR
EXCHANGE RELAY 5 6
23 PR3 PR8
TB22 TB26 21 23 21 3 4
PLG N.C. N.C. PLG N.C. N.C. MC1 M1 MC2 M2
4 5 4 5 24 5 6
A3 22 24 B3 22 PR4 RL3 PR9 RL4
N.O. N.O. N.O. N.O. 1 2
3 6 3 6
+ + A2 A3 B2 B3 TB11 TB22
- 2 7 - 2 7 C1
1 8 1 8 MC1 GL1 RL1 MC2 GL2 RL2 23 23
MC3 MC4
24 24
TB2
MC3 GL3 MC4 GL4
L2 L2
PR11 PR12 PR13 PR14
C2 D2
97 97 97 97
OLR 1 OLR 1 OLR 1 OLR 1
98 98 98 98
5 Amps.
TB2 230V
L2 L2 L2 L2 L2 L2
SUBMERSIBLE BLOWER-1 IN SUBMERSIBLE BLOWER-2 IN TRANSFER PUMP-1 IN TRANSFER PUMP-2 IN
L1 SBR TANK 1 SBR TANK 2 SBR TANK 1 SBR TANK 2
220V
TB9 TB20
DP1 DP2 A M A M A M A M A M
E3 A E3 A SS7 SS8 SS7 SS8 SS9 A
M M M
SS5 SS6 F1 G1 SS10
L1A L1A F1 L1A G1 L1A L1A L1A H3 L1A L1A
E1 E1 TB23 TB27 H1
F3 TB24 F3 TB28
21 21 21 21 21 21 21 21
MC5 MC6 MC7 MC8 MC7 MC8 MC9 MC10
E6 22 E6 22 22 22 22 22 22 22
9 9
MC5 MC6 I1
5 5
E1 E1 I3
F1 G1 F1 G1
E7 E7 F5 G5 F5 G5 H4
23 23 H1
MC5 MC6 23 23 23 23 23
RL5 RL6 MC7 MC8 MC10 RL10
24 24 MC7 MC8 23
24 24 24 24 24
E1 E1 MC9
24
MC5 GL5 MC6 GL6 I1
MC7 GL7 RL7 MC8 GL8 RL8 MC7 GL7 RL7 MC8 GL8 RL8 RL9
MC9 GL9 MC10 GL10
E2 E2
I2

E2 E2 F2 G2 F2 G2 H2 I2

97 97 97 97 97 97 97 97
OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1 OLR 1
98 98 98 98 98 98 98 98

L2 L2 L2 L2 L2
L2
DECANTER PUMP-1 IN DECANTER PUMP-2 SUMPIT PUMP 1 SUMPIT PUMP 2 EFFLUENT PUMP 1 EFFLUENT PUMP 2 CHLORINATOR PUMP WAS PUMP
SBR TANK 1 SBR TANK 2 COMMON IN EQUALIZATION TANK COMMON IN EQUALIZATION TANK COMMON IN SBR TANK 1&2 COMMON IN SBR TANK 1&2
ENGINEER/S: OWNER: DESIGN BY: SHEET CONTENTS: SHEET NO.
FROM THE OFFICE OF: PROJECT TITLE: REMITECHS ELECTRICAL SERVICES

DRAWN BY:
JERRY O. SAVELLA

CHECKED BY:
RES-CHEM-EARTH TECHNOLOGIES SEQUENCIAL BATCH REACTOR WITH 2 SBR TANK MAKATI CITY
PRC PTR PRC PTR
APPROVED BY:

REVISION :
CONTROL WIRING DIAGRAM E-2
PLACE TIN PLACE LOCATION: DATE :
JANUARY 25, 2019.