FT 1&2: assembling work working platform 5 SGB 06 : prepare rebar column 1st lif 8 SGB 06 : fixing rebar column 1st lif 8
FT 3&4: assembling work main girder 5 SGB 07 : prepare rebar 2nd lif 8 SGB 07 : fixing rebar 2nd lif 8
LG2: Adjusting segment 10 FT 1, 2, 3, 4 : assembling work 10 SGB 01a : crosshead grouting work 10
SGB03: Housekeeping and touch up work 4 LG 2 : advancing work 10 SGB 02 - SGB 03 : Span stressing work 6
TNE36: Housekeeping and touch up work 6 SGB 03 : dismantling formwork 8 FT 3&4 : assembling work main girder 5
SGB10: Cutting hollow section for temporary SGB 10: Fabricate link bar for pier head on
SGB11: Installing formwork for tendon opening 6 4 3
platform ground
SGB12: Installation plywood for working platform SGB11: installation rebar for monolithic pier head SGB 11: Installation rebar for monolithic pier
Section 2 5 8 7
floor MD1 (Stage 2) head MD1 (stage 2)
Technology Park
LG 3: SWO 0
SRN01 S : Installing pier head rebar 6 SRN01 S : Installing pier head rebar 6 TP27: installing bottom rebars 5
SRN01N/ SRN04S: installing pier head mould up to SRN01N/ SRN04S: installing pier head mould up to
8 8 Bending Yard (Gagasan): cut and bend 5
concreting concreting
SRN02: erecting / dismantling scaffold 13 SRN02: erecting / dismantling scaffold 13 SRN01S : installing pier head mould 7
SRN11/ SRN10: loosening mould tie down and props, SRN11/ SRN10: loosening mould tie down and SRN11: installing plinth formwork and
8 8 8
bolting I beam to column props, bolting I beam to column dismantling crossbeam side-mould
TP07: arranging link bars 6 TP07: arranging link bars 6 SRN02: 3rd pair - threading work 6
SGB 06 : fixing rebar column 1st lif 8 SGB 06 : prepare rebar column 1st lif 8 SGB 06 : repair crack NCR 4 SGB01b :threading work
SGB 07 : fixing rebar 2nd lif 8 SGB 07 : prepare rebar 2nd lif 8 SGB 07 : prepare rebar 2nd lif 8 SGB 09 : installation sheetpile cofferdam
SGB 02 : erection xhead 2R 10 FT 1, 2, 3, 4 : assembling work 10 SGB01b : threading work 6 TNE 37 : fixing rebar & formwork in progress
FT 1&2 : assembling work working platform 5 LG 2 : advancing work 10 Span 02 - 03 : cropping tendon 4 LG 2 : erection SBG span 03-04
LG 2 : checking and repair defects 10 SGB 03 : dismantling formwork 8 TNE 37 : fixing rebar & formwork in progress 10 FT 2, 3, 4 : assemble parts and jointing work
TNE 36 : dismantle soffit formwork & install TNE 36 : dismantle soffit scaffolding &
18 FT 1, 2, 3, 4 : assembling work 10
main rail housekeeping
SGB 10: fabricate rebar for pier head & SGB 11: Installation tie down bar and formwork for SGB 11: joint survey and adjust mould for pier
14 7 8 No activity
preparation to install side mould monolithic pier head MD1 (stage 2) head 2nd stage
SGB 18: fabricate PERI working platform for 7 4 TP 03: dismantle formwork of pilecap 5
pier column TP 06 SGB 18: Fabrcate peri working platform for tp 06
Time: 16.00pm 102 Time: 18.00pm 93 Time: 17.30pm 102 Time: 15.00pm
SRN01A: installing bottom bars 7 SRN01N: dismantling PH mould 8 SRN02A: installing rebars 7
SRN11: finalising and concreting plinths 8 SRN10: installing rebars 7 SRN10: installing rebars 8
TP06: dismantling formwork and patching 4 SRN19: arranging scaffold 2 SRN19: arranging scaffold 2
work
TP07: installing rebars 7 TP06: patching work (rectification 5 TP03: dismantling props and formwork 4
TP17: preparing rebars on ground 7 TP07: installing rebars 6 TP04: installing 2nd lif link bars 5
SRN02: 3rd pair -stressing 5 SRN02: 3rd pair -cropping 5 TP17: installing rebars 6
SRN02A: tendons ducting 3 SRN02A: tendons ducting 3 SRN01: 3rd pair -joints patching work 2
SRN04S: dismantling scaffold 9 LG1 : SRN12-13: Advancing 13 SRN02A / SRN01A: tendons ducting 3
LG1 : SRN12-13: Advancing 13 SRN02 : 3rd pair -joints patching work 3
SRN03 : 2nd pair -threading work 6
LG1 : SRN12-13: Advancing & SBG erection 8/13 13
nos
195 171 201 Total (Day)
75
10
10
10
18
18
36
14
6
13
111