Canton Tower – Engineering the Elegance

Feng Jun LIN, Director, Arup


林奉军,董事,奥雅纳工程顾问

19 October, 2016
Canton Tower

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an

The Slim Waist Lady 小蛮腰


Canton Tower 600 m Site Area: 175,460 sqm
Total Gross Floor Area (GFA): 114,054 sqm
Below Plaza GFA: 69,779 sqm
Tower GFA: 44,275 sqm
450 m

The Tower is designed for:


g s
in
7,000 visitors on Weekdays and

i l d
15,000 visitors on Festive Days
Bu
a ll
n T at
Construction Period: 2005 – 2010

l o b i t
ci a
n
u an H
o
C rb
© dU
an
Architectural Functions

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The World’s Tallest
Amusement Park

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
New Icon of Guangzhou

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Design Team
Architect: IBA (Information Based Architecture)

Engineer: Arup
• Structure / Geotechnical
• Wind
• Building Services
g s
in
• Fire Engineering
• Special Effect Lighting
i l d
B u
ll
LDI: GZDI (Guangzhou Design Institute)
a
n T at
l o b i t
c i a
n
u an H
C rbo
© dU
an
g s
in l d
u i
B
ll Evolution
Form and Shape a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Form & Shape Evolution

g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Densification
of rings
Form & Shape Evolution
Core Size

Top Ellipse

g s
l din Base Ellipse
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an Plan at waist
Form & Shape Evolution

g s
l d in
u i
ll B
a
T at
o n i t
l b
Aspect Ratio

ci a
@ Waist = 7.3

n
u an H
o
C rb
© dU
an
Aspect Ratio
@ Base = 7.5
g s
inl d
u i
ll
Total DesignaApproach B
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Total Design
• Geometry 多遇地震人工时程波(竖向)

• Wind climate 0.6

• Wind action 0.5


0.4
g s
• Temperature effect 0.3

l d in 1

• Stability 0.2
u i
ll B

加速度(m/s
0.1
• Seismic a
T at 0 2
o n i t
-0.1 0 10 20 30 40 50 60 70 80
• Construction
ci l a b
n H
-0.2

• Fire engineering
o u an -0.3

C rb 3
© dU
-0.4
• Material -0.5

• Computational fluidan
时间(T)

dynamic
广州太阳轨迹图
• Comfortability
• Performance design
approach
g s
in
l d
u i
StructuralaSystemll B
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Structural Design Challenges
- Study and specify the performance
based comfort design and lateral
building deflection limit.
- Accurate assessment of wind loading.
- Structural design to achieve a perfect
g s
architectural/structural form.
l din
u i
B
- Ensure constructability of tower, cost-
effective design and control the
a ll
construction cost to within the project
n T at
budget.
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Structural System : tube in tube

g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an

Dual Defense System for 14 x 17 46


= + Outside = 24 + +
Lateral Stability
Core wall Ring Beams Bracings
Tube Columns
Structural System : Antenna

s
Upper Steel Structure

in g (Closed Structure)

i l d
Bu
a ll
n T at
l o b i t
i
Middle Steel

n c H a Structure (Latticed)

o u an
C rb
© dU
an Lower Transfer
Structure
Structural System : Eccentric Joint

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
B
ll Study
Wind Engineering a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Wind Engineering

g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an

Wind Shielding Coefficient Shape Factor Coefficient


Wind Engineering

Sectional Structural load


test
Wind Climate study
g s
Wind effect analysis Wind force &

l din Acceleration results


i
Areoelastic model study

Bu
a ll
n T at
l o b i t
i Pressure
SectionalcCladding a Study
n
u an H Wind pressure
Topographic study o
CCladdingrbPressure study
Distribution

© dU
an
Wind Engineering Study Flowchart
Wind Engineering

- ACCURATELY ASSESS THE WIND LOAD, TO ENSURE STRUCTURAL


SAFETY
g s
- WIND ENGINEERING STUDY INCLUDE:
in l d
u i
(Wind Climate Study)
l l B
Ta
- APPOINTED GUANGDONG PROVINCE
t
CLIMATE CENTRE
n
o DATA t a
iRECORD FROM 1949-2004 TO
l
- COLLECT 167 NUMBERiWIND
c a b
n H
u an STUDY
o
CARRY OUT THE MONTE-CARLO
C rb
© dU
an
Wind Engineering Wind Tunnel Test

g s
l in
d
u i
ll B
a
TEntire models
t to
Site Topography & n
o measure t a
i wind pressure Sectional models cladding
Physiognomy Test
ci l a b pressure test
n
u an H
o
C rb
© dU
an

Sectional models to Full aeroelastic model to


measure wind forces measure wind force
Wind Engineering Wind Tunnel Test
Site Topography Test Maximum loads combination (kN) Graph of Tower Top Deflection
-2.00 -1.00 0.00 1.00 2.00
现场地形地貌试验平均风速剖面 限值H/250
0 2.00
34960000 11
700 338 23
GB50009-2001 326 50000 34
(Cat C) 315 45
600 0 deg 40000 1.68m 45°
304 56
45 deg 30000 1.00

s
500 293 68 157.5° 22.5°

g
90 deg 20000 1.67m
1.07m

in
281 10000 79
400 135 deg
高度 (m)

d
1.56m

l
270 0 90
180° 0.00

i
180 deg 0°
最大位移1.77m

u
300 259 101
225 deg

B
248 113

ll
200 270 deg 1.70m
202.5°
236 124

a
315 deg -1.00
1.68m

T at
100 225 135 1.12m
315 deg 214 146 225° 1.41m

n
203 158

i t
191 169

o
0
180 247.5°

l b
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2
-2.00

i
270°
平均风速 , Uz /UR

n c H a
o u Load from
Results of Tower Acceleration under Wind
n the Aero-elastic Model
C rbaWind Tunnel Test Result
Period © dU
Limiting Acceleration for the Return
Limiting Value

10 years an 0.255m/s 2 0.30m/s2

5 years 0.155m/s2 0.20m/s2

1 year <0.1m/s2 0.15m/s2


g s
in l d
u i
B
llAnalysis
Thermal Effect a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Thermal Effects Simulation Analysis
Tower Structure and
physical property

Build model
Parameter
g s
setting
l in
d
Climate data
3D modeling
u i • Climate

l l B • Sun radiation

calculation T a t
• Wind speed

o n i t a
Consideration

c i l a b
n
u an
Various of structure temperature H Outdoor temperature
o
C analysis b
© dU r
Consideration
Maximum increaseanof Structure temperature Global warming

analysis

Maximum increase of temperature under


the global warming
Thermal Effects Simulation Analysis

+ 30 0C + 20 0C + 20 0C
- 10 0C - 20 0C
- 20 0C

g s
l din
Case 1 Temperature increase/
u
Case 2 Temperature increase/i Case 3 Temperature increase/
decrease on all structural elements
ll B
decrease on exposure elements decrease on one side
a
T at
o n i t
c i l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
Other Structural B
ll Analysis
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Structural Analysis - Elastic

Results of GSA Results of Sap2000


Period
(Including P-Δ effects) (Including P-Δ effects)

g s
T1 10.23 10.24
l d in
u i
ll B
T2 7.09
a7.11
T at
o n i t
2.83
ci l a b
2.84
n H
T3

o u an
C rb
© dU
an
Z

Y X

O GSA Sap2000
Mode 1 Mode 2 Mode 3
model model
Structural Analysis – Overall Buckling

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an

Columns Rings Bracings


Non-linear Analysis under Severe Earthquake

Results of Outside Tube

g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Few columns will reach the plastic
stage under rare earthquake load case
Non-linear Analysis under Severe Earthquake

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The elastro–plastic The elastro–plastic response of
response of Inner core Antenna and Transfer Truss
Joint Design and Analysis

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Damper

MTMD ngs
i l di
TMD
Bu
a ll
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU TMD
an
Structural Health Monitor

g s
Anemometer
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© d U Accelerometer
an

Seismograph
Seismic Design – Shaking Table Test

g s
l din
u i
ll B
a
T at
o n i t
Model Scale 1:50 ci l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
B
ll Studies
Constructability a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Segmental Erection of Steelwork
1. Column – one section of length of 8-12
metres including the connecting joint with
ring and diagonal.
2. Diagonal – 8-12 metres long.
g s
3. Ring – 3-6 metres long
l din
u i
立柱
ll B
Column
a
T1 at
o n i t
ci l a b
环构件
Ring u n H
n 2
o
C rb a
© dU
a斜撑n 3
Bracing

The tonnage of the segmental column is limited to 30 tones


maximum for lifting weight reason.
Engineer Envisaged Construction Sequence

Estimated completion in May 2009

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Construction Process – Completed on Schedule

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Construction Process – Completed on Schedule

g s
in
l d
i
高度Height: 610m – 10m = 600m
u
ll B
a
T at
o n i t
ci l a b
航空限高原因,天线桅杆缩短10m.
n H
u an Due the aviation restriction, the antenna
o
C rb should be shortened by 10 meter.
© dU
an
12 November, 2010
The 16th Asian Games Openning
Ceremony, Guangzhou, China

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The Three Tallest
Towers in Guangzhou

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The Zhujiang New Town,
Guangzhou

g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an

• Begin your presentation on this slide. •请于此页插入幻灯片正文


g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n H
Thank You