Professional Documents
Culture Documents
Canton Tower Engineering The Elegance PDF
Canton Tower Engineering The Elegance PDF
19 October, 2016
Canton Tower
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
i l d
15,000 visitors on Festive Days
Bu
a ll
n T at
Construction Period: 2005 – 2010
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Architectural Functions
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The World’s Tallest
Amusement Park
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
New Icon of Guangzhou
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Design Team
Architect: IBA (Information Based Architecture)
Engineer: Arup
• Structure / Geotechnical
• Wind
• Building Services
g s
in
• Fire Engineering
• Special Effect Lighting
i l d
B u
ll
LDI: GZDI (Guangzhou Design Institute)
a
n T at
l o b i t
c i a
n
u an H
C rbo
© dU
an
g s
in l d
u i
B
ll Evolution
Form and Shape a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Form & Shape Evolution
g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Densification
of rings
Form & Shape Evolution
Core Size
Top Ellipse
g s
l din Base Ellipse
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an Plan at waist
Form & Shape Evolution
g s
l d in
u i
ll B
a
T at
o n i t
l b
Aspect Ratio
ci a
@ Waist = 7.3
n
u an H
o
C rb
© dU
an
Aspect Ratio
@ Base = 7.5
g s
inl d
u i
ll
Total DesignaApproach B
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Total Design
• Geometry 多遇地震人工时程波(竖向)
l d in 1
• Stability 0.2
u i
ll B
加速度(m/s
0.1
• Seismic a
T at 0 2
o n i t
-0.1 0 10 20 30 40 50 60 70 80
• Construction
ci l a b
n H
-0.2
• Fire engineering
o u an -0.3
C rb 3
© dU
-0.4
• Material -0.5
• Computational fluidan
时间(T)
dynamic
广州太阳轨迹图
• Comfortability
• Performance design
approach
g s
in
l d
u i
StructuralaSystemll B
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Structural Design Challenges
- Study and specify the performance
based comfort design and lateral
building deflection limit.
- Accurate assessment of wind loading.
- Structural design to achieve a perfect
g s
architectural/structural form.
l din
u i
B
- Ensure constructability of tower, cost-
effective design and control the
a ll
construction cost to within the project
n T at
budget.
l o b i t
ci a
n
u an H
o
C rb
© dU
an
Structural System : tube in tube
g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
s
Upper Steel Structure
in g (Closed Structure)
i l d
Bu
a ll
n T at
l o b i t
i
Middle Steel
n c H a Structure (Latticed)
o u an
C rb
© dU
an Lower Transfer
Structure
Structural System : Eccentric Joint
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
B
ll Study
Wind Engineering a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Wind Engineering
g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Bu
a ll
n T at
l o b i t
i Pressure
SectionalcCladding a Study
n
u an H Wind pressure
Topographic study o
CCladdingrbPressure study
Distribution
© dU
an
Wind Engineering Study Flowchart
Wind Engineering
g s
l in
d
u i
ll B
a
TEntire models
t to
Site Topography & n
o measure t a
i wind pressure Sectional models cladding
Physiognomy Test
ci l a b pressure test
n
u an H
o
C rb
© dU
an
s
500 293 68 157.5° 22.5°
g
90 deg 20000 1.67m
1.07m
in
281 10000 79
400 135 deg
高度 (m)
d
1.56m
l
270 0 90
180° 0.00
i
180 deg 0°
最大位移1.77m
u
300 259 101
225 deg
B
248 113
ll
200 270 deg 1.70m
202.5°
236 124
a
315 deg -1.00
1.68m
T at
100 225 135 1.12m
315 deg 214 146 225° 1.41m
n
203 158
i t
191 169
o
0
180 247.5°
l b
0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2
-2.00
i
270°
平均风速 , Uz /UR
n c H a
o u Load from
Results of Tower Acceleration under Wind
n the Aero-elastic Model
C rbaWind Tunnel Test Result
Period © dU
Limiting Acceleration for the Return
Limiting Value
Build model
Parameter
g s
setting
l in
d
Climate data
3D modeling
u i • Climate
l l B • Sun radiation
calculation T a t
• Wind speed
o n i t a
Consideration
c i l a b
n
u an
Various of structure temperature H Outdoor temperature
o
C analysis b
© dU r
Consideration
Maximum increaseanof Structure temperature Global warming
analysis
+ 30 0C + 20 0C + 20 0C
- 10 0C - 20 0C
- 20 0C
g s
l din
Case 1 Temperature increase/
u
Case 2 Temperature increase/i Case 3 Temperature increase/
decrease on all structural elements
ll B
decrease on exposure elements decrease on one side
a
T at
o n i t
c i l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
Other Structural B
ll Analysis
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Structural Analysis - Elastic
g s
T1 10.23 10.24
l d in
u i
ll B
T2 7.09
a7.11
T at
o n i t
2.83
ci l a b
2.84
n H
T3
o u an
C rb
© dU
an
Z
Y X
O GSA Sap2000
Mode 1 Mode 2 Mode 3
model model
Structural Analysis – Overall Buckling
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
g s
l d in
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Few columns will reach the plastic
stage under rare earthquake load case
Non-linear Analysis under Severe Earthquake
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The elastro–plastic The elastro–plastic response of
response of Inner core Antenna and Transfer Truss
Joint Design and Analysis
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Damper
MTMD ngs
i l di
TMD
Bu
a ll
n T at
l o b i t
ci a
n
u an H
o
C rb
© dU TMD
an
Structural Health Monitor
g s
Anemometer
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© d U Accelerometer
an
Seismograph
Seismic Design – Shaking Table Test
g s
l din
u i
ll B
a
T at
o n i t
Model Scale 1:50 ci l a b
n
u an H
o
C rb
© dU
an
g s
in l d
u i
B
ll Studies
Constructability a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Segmental Erection of Steelwork
1. Column – one section of length of 8-12
metres including the connecting joint with
ring and diagonal.
2. Diagonal – 8-12 metres long.
g s
3. Ring – 3-6 metres long
l din
u i
立柱
ll B
Column
a
T1 at
o n i t
ci l a b
环构件
Ring u n H
n 2
o
C rb a
© dU
a斜撑n 3
Bracing
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Construction Process – Completed on Schedule
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
Construction Process – Completed on Schedule
g s
in
l d
i
高度Height: 610m – 10m = 600m
u
ll B
a
T at
o n i t
ci l a b
航空限高原因,天线桅杆缩短10m.
n H
u an Due the aviation restriction, the antenna
o
C rb should be shortened by 10 meter.
© dU
an
12 November, 2010
The 16th Asian Games Openning
Ceremony, Guangzhou, China
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The Three Tallest
Towers in Guangzhou
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an
The Zhujiang New Town,
Guangzhou
g s
l din
u i
ll B
a
T at
o n i t
ci l a b
n
u an H
o
C rb
© dU
an