PRESENTATION
By
CABLE-STAYED BRIDGE
Connecting North DELHI with East DELHI
• Earthquake Analysis: IIT Roorkee & Structural Engg. Research center, Chennai
• Cost: 1591 Crore Estimated July,2017 (Starting Cost 631 Crore March,2010)
SITE LAYOUT
SIGNATURTE BRIDGE
• Signature Bridge is a CABLE-STAYED BRIDGE consisting of 15 wires on main span and
4 on the other span
• PYLON, a support structure for
Suspension bridge or highway
• The PYLON consists of two legs
made of steel boxes which merge
into one upper pylon zone where
cable supporting the main span
• TERREX-DEMAG is the
machine being used for lifting
PYLON parts (15000 Tones steel)
PYLON BASE & STAY CABLE
REINFORCEMENT
STEEL REINFORCEMENT
ARE USED
Cold-Worked HYSD bar
confirming IS:1786 (Fe
415,Fe 500)
• BAR-BENDING
SHEDULE
• LAP LENGTH
• ANCHORGE LENGTH
• COVER BLOCKS
SHUTTERING
• Camber is provided
in the formwork
• To counteract the
effect of Deflection
• Steel form work
• Lubricants are used
TREATMENT OF FORMWORK
• DESIGN
• REMOVAL OF FORMWORK
• CONCRETE PRODUCTION
1. Batching
2. Mixing
3. Compacting
• CURING OF CONCRETE
PILE DRIVING
WELL FOUNDATION
• Well Cap Bottom Plug
• Well Curb Sand Filling
• Cutting Edge Top Plug
• Other tests-
Compaction test, Moisture content test,
Sieve analysis of all the aggregate,
Flakiness & Elongation, Impact Value test,
Soundness test, Specific Gravity etc.
BRIDGE STRUCTURAL RESPONSE
Total of 104 sensors
171 data channels
CONCLUSION
• The "Signature Bridge" as the new landmark of New Delhi
connects the city Wazirabad across the river Yamuna
• The automated monitoring system which is being provided for the
new Signature Bridge in Wazirabad will provide enormous
amounts of information which will enable the condition to which
the bridge is subjected, and the structure’s condition and
performance
• It is a good example of the type of comprehensive service which can
be provided by modern SHM systems
• It’s just like a SIGNATURE mark towards the progress of nation
REFERENCE
• https://timesofindia.indiatimes.com/city/delhi/signature-bridge-may-not-be-ready-this-
year/articleshow/58952145.cms
• http://www.sbp.de/en/project/yamuna-bridge-at-wazirabad-1/
• http://www.thehindu.com/news/cities/Delhi/signature-bridge-still-hanging-fire-after-13-
years/article17671278.ece
• http://indiatoday.intoday.in/story/signature-bridge-delayed-wazirabad-cash-
crunch/1/852096.html
• http://www.dailymail.co.uk/indiahome/indianews/article-3273038/Now-Yamuna-Signature-
Bridge-hit-delays-authorities-miss-green-nod-deadline.html
• http://www.asianage.com/delhi/delhi-s-signature-bridge-finally-open-april-2017-304