Review of Civil Engineering
Course Materials
Please Review Before Class
Surveying TutorialReview of Civil Engineering
OUTLINE
* General Information
— Board for Professional Engineers and Land Surveyors
— Information for Examinees (test plan, etc.)
— Section 6731, Business and Professions Code
* Field Activities and Equipment
— Definitions, Methods, and Procedures for:
* Control Surveys;
* Construction Surveys;
* Route Surveys; and
* Topographic Surveys
— Types of Errors/Accuracy Standards
+ Field Measurements
— Angular Measurements (Horizontal and Vertical)
— Horizontal Measurements (Distance)
— Vertical Measurements (Leveling)
— Global Positioning (GPS)
* Other Office Calculations
~ Use of Decimal Degrees
— Trigonometric Formulae
— Horizontal Curves
~ Vertical Curves
— Traverse Surveying and Adjustment
— Area Calculation of a Closed Figure
+ More “Stuff”
— Metrication (International Foot vs. U.S. Survey Foot)
— U.S. Public Lands Survey System (USPLSS)
— Horizontal Datums
— Vertical Datums
— Photogrammetry
— Scales
— Geographic Information Systems (GIS)Review of Civil Engineering
OUTLINE (Continued)
* Sample Problems and Solutions
+ Reference Materials
— CalTrans Staking Information
— Abbreviations (CT-typical for CalTrans Survey Manual
as source)
— Field Note Topo Symbols (CT)
— Curves (CT)
* Horizontal, Vertical, Parabolic Flares/Tapers
— Plane Geometry (CT)
— Area of Polygons (CT)
— Constants and Useful Data (CT)
~ Surveyors Measures (CT)
— Section 8801, Public Resources Code (California
Coordinate System)
— Survey Datums and the California Coordinate System
(CT)
¢ Horizontal Datums (1976)
¢ Vertical Datums (1976)
* Califomia Coordinate System (1976-Note: there is
no Zone 7 in CCS83)
— Metric Quick Reference Sheet (CT)
— Portion ASTM E380-92, Section 5