Professional Documents
Culture Documents
Method Statement - Support Class I - III: Section A - A
Method Statement - Support Class I - III: Section A - A
1. SURVEY, DRAW 3.CHARGING, 4. REMOVE BLAST 5. WASHING, SCALING 6. SHOTCRETING, STEP 7. drill and INSTALL
2. DRILL BLAST BLASTING AND AND GEOLOGICAL THICKNESS 5-20CM ROCK BOLT, drainage
TUNNEL FACE HOLES ROCK
VENTILATION FACE MAPPING (where required) holes
STEP 1. SURVEY AND DRAW TUNNEL FACE STEP 2. DRILL BLAST HOLE
1 - Using Total Station to draw tunnel face and center 2 - Using Jumbo drill, diameter of 45mm, hole length of
3.8m according to blasting pattern.
0.15
Drainage holes
1.20
as instructed
Fiber reinforced shotcrete
Air duct 100mm-200mm
Round length L= 3.5m
Jumbo drill
5.50
Jumbo drill
4.00
Drainage holes
2.9 m
min.30cm into rock
Longitudinal spacing
3.0m
0.15
13.3 m
1
4.50
3.3 m
Note:
- This is typical method statement for rock support type I, II and III.
- All dimensions in this drawing are in metre
- The construction direction diagramp shall be seen in the General 2.6 m
Schedule of project.
- Machineries mobilization stated in the Mobilization Schedule
Annex:
Drawing Title : NE-CM-CT- 05
NAM E-MOUN HYDROPOWER PROJECT CONVEYANCE TUNNEL METHODOLOGY Date: Rev:
SONG DA 5 JOINT STOCK COMPANY 04/2018
Civil Works Contract
Scale: Sheet:
ROCK SUPPORT CLASSES I-III