APPROVAL NOTE

MHS PROJECTS - KPCL


Reference No : - AN/MHS(P)/18-19/001 Date : - 2/4/2019
1. Name of the work & location : - Feeding CR-2 Conveyor Stream from Zone-2 by new Conveyor at Zone -2

2. Name of the department : - MHS-Projects

3. Name of the person initiated:- P.Manikya Rao

DGM, MHS-Projects

4. Scope of the work:- 1. Dismantling of existing ND4-A conveyor at APGENCO silo


2. Shifting of dismantled structure from APGENCO silo to ZONE-2
3. Installation of Belt Conveyor ZC-1 (for feeding cargo from ZONE-2 to
CR-2, 80 m long) along with all associated accessories
4. instalation of new hopper for feeding of cargo

5. Modification of Existing structure as per site requirement

5. ELE/IT works:- Included Above

6. Specialized Items:- Motor, GearBox, Fluid Coupling, Gear Coupling, Pulleys, Belt, Idlers,
Hopper, Take-UP.

7. Total Estimated Cost : - 2.35 Crores For Total Project.


0.96 Crores worth Materials are Available,
Balance Cost: 1.4 Crores.

Prepared by Verified by HOD

K. Prudhvi P. Manikya Rao


Mgr., MHS-Projects DGM, MHS-Projects COO-DCO

Approved by

CEO