Structural Design Calculation: Main Receiving Sub-Station (MRSS)
Structural Design Calculation: Main Receiving Sub-Station (MRSS)
Project .:
MAIN RECEIVING SUB-STATION (MRSS)
Client .:
- - - -
STRUCTURAL DESIGN CALCULATION
Project .:
MAIN RECEIVING SUB-STATION (MRSS)
Client .:
TITLE
- - - -
PROJ NAME. SUB-STATION (MRSS)
CLIENT. -
PROJ NO. -
JOB NO. -
DOC NO. -
JOB TITLE A. Design Criteria
LOC. -
A. DESIGN CRITERIA
2 DESIGN LOADS
3 MATERIAL SPECIFICATIONS
a Concrete (Cylindrical)
Compressive Strength, f'c = 24 Mpa
b Reinforcing Steel
Yield Strength, Fy = 420 Mpa
c Structural Steel
Yield Strength, Fy= 235 Mpa
Fracture Strength, Fu= 400 Mpa
4 Wind Load
a Basic Wind Speed mph
b Exposure Catergory C
c Important Factor 1
d Topographical Factor, Kzt 1
e Gust Factor 0.85
f Directionality Factor, Kd 0.85
pg 1
PROJ NAME. SUB-STATION (MRSS)
CLIENT. -
PROJ NO. -
JOB NO. -
DOC NO. -
JOB TITLE A. Design Criteria
LOC. -
5 EARTH QUAKE
a Region Yangon
b Occupancy Catergory 1.0
c Spectral Response Acceleration, Ss 0.77
d Sepctral Response Acceleration, S1 0.31
e Site Class D
f Seismic Design Catergory D
g Site Coefficient, Fa 1.192
h Site Coefficient, Fv 1.74
i Design Spectral Acce. Parameter, SDS 0.612
j Design Spectral Acce. Parameter, SD1 0.36
pg 2
PROJ NAME. SUB-STATION (MRSS)
CLIENT. -
PROJ NO. -
JOB NO. -
DOC NO. -
JOB TITLE A. Design Criteria
LOC. -
6 LOAD COMBINATION
1.) 1 - - - - -
2.) 1 1 - - - -
3.) 1 0.75 - - - -
4.) 1 1 0.75 - - -
5.) 1 1 -0.75 - - -
6.) 1 1 - 0.75 - -
7.) 1 1 - -0.75 - -
8.) 1 1 - - 0.7 -
9.) 1 1 - - -0.7 -
10.) 1 1 - - - 0.7
11.) 1 1 - - - -0.7
12.) 1 0.75 0.75 - - -
13.) 1 0.75 -0.75 - - -
14.) 1 0.75 - 0.75 - -
15.) 1 0.75 - -0.75 - -
16.) 1 0.75 - - 0.525 -
17.) 1 0.75 - - -0.525 -
18.) 1 0.75 - - - 0.525
19.) 1 0.75 - - - -0.525
20.) 0.6 - 1 - - -
21.) 0.6 - -1 - - -
22.) 0.6 - - 1 - -
23.) 0.6 - - -1 - -
24.) 0.6 - - - 0.7 -
25.) 0.6 - - - -0.7 -
26.) 0.6 - - - - 0.7
27.) 0.6 - - - - -0.7
pg 3
PROJ NAME. SUB-STATION (MRSS)
CLIENT. -
PROJ NO. -
JOB NO. -
DOC NO. -
JOB TITLE A. Design Criteria
LOC. -
1.) 1.4 - - - - -
2.) 1.2 1.6 - - - -
3.) 1.2 1.6 0.8 - - -
4.) 1.2 1.6 -0.8 - - -
5.) 1.2 1.6 - 0.8 - -
6.) 1.2 1.6 - -0.8 - -
7.) 1.2 1 1.6 - - -
8.) 1.2 1 -1.6 - - -
9.) 1.2 1 - 1.6 - -
10.) 1.2 1 - -1.6 - -
11.) 1.2 1 - - 1-
12.) 1.2 1 - - -1 -
13.) 1.2 1 - - - 1
14.) 1.2 1 - - - -1
15.) 0.9 - 1.6 - - -
16.) 0.9 - -1.6 - - -
17.) 0.9 - - 1.6 - -
18.) 0.9 - - -1.6 - -
19.) 0.9 - - - 1-
20.) 0.9 - - - -1 -
21.) 0.9 - - - - 1
22.) 0.9 - - - - -1
pg 4
PROJ NAME. SUB-STATION (MRSS)
CLIENT. -
PROJ NO. -
JOB NO. -
DOC NO. -
JOB TITLE A. Design Criteria
LOC. -
7 Design Parameters
Material Usage
1.) Piles, Pile Caps, Beam And Column 30 Mpa ( Grade 30)
8 Concrete Design
A. Concrete Cover
Cover To Alll Reinforcement To Be As Follows.
- Beams, Columns
Concrete Exposed To Salt, Salt Water And Sea Water
Walls And Slab With 16 mmm Diameter And Smaller 50 mm
All Members And Other Than Noted Above 80 mm
pg 5