Professional Documents
Culture Documents
CW Duct ECW System and Condenser Water Box Charging
CW Duct ECW System and Condenser Water Box Charging
CW Duct ECW System and Condenser Water Box Charging
12. Close ECW strainer drain and vent after proper venting.
15. After proper venting close APH GB cooler vent , ID/FD cooler line drain/vent.
16. Charge condenser water box by crack opening CW-1 and CW-2. Condenser water box drain/vent
should be in open condition and maintain normal hotwell level.