1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B.T. Patch Repair+EW main.in
1 VR 18 to 0 4.03 30 12 2009 30 12 2014 0.72 0.72
Gadchiroli Korchi V 1.60 30.78 4.03 1.60 shoulder+Bushesh cutting+km
Daberi stone painting+white washing
SH 233 to
B.T. Patch Repair+EW main.in
3 Tulshi 0 325.10 30 6 2012 30 6 2017 3.50 3.50
Gadchiroli Vihirgaon Wadsa VI 14.00 361.66 325.10 14.00 shoulder+Bushesh cutting+km
Shirpur stone painting+white washing
Narchuli
road
Koregaon
B.T. Patch Repair+EW main.in
4 Mendha 0 541.46 27 12 2009 27 12 2014 8.10 8.10
Gadchiroli Armori VI 18.00 594.30 541.46 18.00 shoulder+Bushesh cutting+km
Dongartam stone painting+white washing
Rangi
ashiBori
Nimgaon
Thotebodi B.T. Patch Repair+EW main.in
5 Michgaon
Yengada 0 877.83 25 11 2009 25 11 2014 10.13 10.13
Gadchiroli Dhanora VI 22.50 857.38 877.83 22.50 shoulder+Bushesh cutting+km
Yerandi stone painting+white washing
Deulgaon
Kunghada
road
Navtala B.T. Patch Repair+EW main.in
6 Chamor 0 303.65 27 7 2009 27 7 2014 4.73 4.73
Gadchiroli Jogana VI 10.50 416.66 303.65 10.50 shoulder+Bushesh cutting+km
shi stone painting+white washing
Dhekani
road
Rajaram
B.T. Patch Repair+EW main.in
7 Challewada 0 188.91 30 5 2012 30 5 2017 2.13 2.13
Gadchiroli Aheri VI 8.50 266.98 188.91 8.50 shoulder+Bushesh cutting+km
Kamalapur stone painting+white washing
road
Nandigaon B.T. Patch Repair+EW main.in
8 Gadchiroli Laxmipur Sironcha VI 9.00 456.83 397.95 0 397.95 20 10 2010 20 10 2015 9.00 3.15 shoulder+Bushesh cutting+km 3.15
road stone painting+white washing
SH 233
B.T. Patch Repair+EW main.in
9 -Lendhari - Kurkhed 0 222.94 30 6 2012 30 6 2017 2.59 2.59
Gadchiroli VII 10.35 247.24 222.94 10.35 shoulder+Bushesh cutting+km
Yengalkhed a stone painting+white washing
a
B.T. Patch Repair+EW main.in
10 Kurkheda Kurkhed 0 169.74 22 2 2010 22 2 2015 1.89 1.89
Gadchiroli VII 5.40 154.67 169.74 5.40 shoulder+Bushesh cutting+km
-Anjantola a stone painting+white washing
Sr. District Name of Block Original PMGSY GoI Sanction & Execution Details (Cost Rs. in Lac) Zonal Repairs Scope of work (Cost Rs. in Lac)
No. Road work Phas Lengt GoI Completion Cost Date of End date of 5 Reas Length Estimat Scope of work with Fund
e h Cost original work Year DLP Maint. on of (Km) ed Cost Chainage of Requir
flood
Completion Dama (Rs. In renewal/Embankment ed in
ge Lac) Repairs/CD work 2016-
Repairs etc. 17
Original PVC Total DD M YYYY DD MM YYYY
Work Paid M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Block
B.T. Patch Repair+EW main.in
11 Boundary at 0 109.53 3 1 2012 3 1 2017 1.25 1.25
Gadchiroli Wadsa VII 5.00 119.19 109.53 5.00 shoulder+Bushesh cutting+km
Usegaon stone painting+white washing
-Kurud
Antarji - B.T. Patch Repair+EW main.in
12 Gadchiroli Ravi - Armori VII 6.70 173.06 101.56 0 101.56 30 6 2012 30 6 2017 6.70 1.68 shoulder+Bushesh cutting+km 1.68
Kondhala stone painting+white washing
T 02 at
B.T. Patch Repair+EW main.in
15 Darpangud Chamor 0 115.82 6 2 2011 6 2 2016 1.47 1.47
Gadchiroli VII 4.90 131.82 115.82 4.90 shoulder+Bushesh cutting+km
aSH
- SH
269 281
- shi stone painting+white washing
at Warur
Kanargaon
Sivagatta B.T. Patch Repair+EW main.in
16 Gadchiroli Nawargaon Dhanora VII 18.30 668.10 278.11 0 278.11 30 6 2012 30 6 2017 18.30 4.58 shoulder+Bushesh cutting+km 4.58
Rajoli stone painting+white washing
Bhawaraga
Mulchera-
d Sode - Mulcher
Mohurli B.T. Patch Repair+EW main.in
17 Gadchiroli VII 9.00 343.99 339.81 0 339.81 29 4 2010 29 4 2015 9.00 3.15 shoulder+Bushesh cutting+km 3.15
Khudirampa a stone painting+white washing
lli
B.T. Patch Repair+EW main.in
18 MSH 09 - 0 165.59 5 4 2012 5 4 2017 1.50 1.50
Gadchiroli Aheri VII 6.00 202.77 165.59 6.00 shoulder+Bushesh cutting+km
Wedampalli stone painting+white washing
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
B.T. Patch Repair+EW main.in
22 T 04 - 0 63.82 30 6 2012 30 6 2017 0.78 0.78
Gadchiroli Aheri VII 3.10 129.45 63.82 3.10 shoulder+Bushesh cutting+km
Korepalli stone painting+white washing
SH 233 to
B.T. Patch Repair+EW main.in
26 Temli 0 166.36 15 3 2013 15 3 2018 1.75 1.75
Gadchiroli Korchi IX 7.00 168.57 166.36 7.00 shoulder+Bushesh cutting+km
Rajatola stone painting+white washing
Road
B.T. Patch Repair+EW main.in
27 SH 233 to 0 33.77 25 3 2013 25 3 2018 0.25 0.25
Gadchiroli Korchi IX 1.00 28.25 33.77 1.00 shoulder+Bushesh cutting+km
Mohgaon stone painting+white washing
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
SH 281 to - B.T. Patch Repair+EW main.in
33 Chamor 0 82.39 25 6 2013 25 6 2018 0.53 0.53
Gadchiroli Palaspur IX 2.10 51.84 82.39 2.10 shoulder+Bushesh cutting+km
shi stone painting+white washing
Road
Warur to - B.T. Patch Repair+EW main.in
34 Chamor 0 54.84 14 5 2013 14 5 2018 0.25 0.25
Gadchiroli Gandhinag IX 1.00 48.07 54.84 1.00 shoulder+Bushesh cutting+km
shi stone painting+white washing
ar road
MDR 28 to -
B.T. Patch Repair+EW main.in
37 Zinganur 0 50.15 10 10 2012 10 10 2017 0.25 0.25
Gadchiroli Sironcha IX 1.00 33.29 50.15 1.00 shoulder+Bushesh cutting+km
chek no 2 stone painting+white washing
Road
MDR 28 to - B.T. Patch Repair+EW main.in
38 Gadchiroli Zinganur Sironcha IX 1.00 50.30 75.74 0 75.74 10 10 2012 10 10 2017 1.00 0.25 shoulder+Bushesh cutting+km 0.25
mal Road stone painting+white washing
tenance under3 Special repais as per the PCI & Maintenance priority list prepared at the district level.
4 District costing Rs..............Lac are physically verified and confirmed.
ad works for the
Sr. District Name of Block Original PMGSY GoI Sanction & Execution Details (Cost Rs. in Lac) Zonal Repairs Scope of work (Cost Rs. in Lac)
No. Road work Phas Lengt GoI Completion Cost Date of End date of 5 Reas Length Estimat Scope of work with Fund
e h Cost original work Year DLP Maint. on of (Km) ed Cost Chainage of Requir
flood
Completion Dama (Rs. In renewal/Embankment ed in
ge Lac) Repairs/CD work 2016-
Repairs etc. 17
Original PVC Total DD M YYYY DD MM YYYY
Work Paid M
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
taken previously
5 or presently under any other Govt. programme excluding this proposal.
er consideration
6 has been completed. No road is proposed for repairs whose defect liability contract is in force.
17
Job No.
17
Job No.
17
Job No.
17
Form - SR - 2018-19
Details of Works Proposed for maintenance Special Repairs 2018-19
Sr. District Block Original PMGSY GoI Sanction & Execution Details (Cost Rs. in Lac) Present Special Repairs Scope of work Job No.
No. Pha Length GoI Completion Cost Date of original End date of 5 (Cost Rs.Scope
Prio Lengt Estima in Lac)of Fund
se Cost Original PVC Total DD MM work YYYY Year
DD DLPMMMaint.
YYYY rity h ted work with Require
Work Paid Nu (Km) Cost Chainage d in
Name of Road work mbe (Rs. In of renewal 2014-15
r of Lac) etc.
the
roa
d in
1 2 3 4 5 6 7 8 9 10 11 12 13.00 14 15 16
SH 269 - Kanargaon
35.00 +Patch
Gadchir Sivagatta Nawargaon repair
2 Dhanora VII 18.30 668.10 278.11 0 278.11 30 6 2012 30 6 2017 3.50 35.00
oli Rajoli Bhawaragad BT renewal
Sode
MDR 16 to Chakalpeth
25.00 +Patch
Gadchir Chamorsh repair
3 Murkhala Kanholi VI 7.00 207.87 174.97 0 174.97 10 5 2009 30 5 2014 2.50 25.00
oli i BT renewal
road(0/00 to 2500)
Talegaon Moushi
10.00 +Patch
Gadchir repair
4 Kurkheda Palasgad Charbhatti VI 12.15 256.33 169.49 0 169.49 31 12 2009 31 12 2014 1.00 10.00
oli BT renewal
Kotaldoh Lawari road
40.00 +Patch
Gadchir repair
5 Kurkheda Kurkheda -Anjantola VII 5.40 154.67 169.74 0 169.74 22 2 2010 22 2 2015 3.00 40.00
oli BT renewal
20.00 +Patch
Gadchir SH 233 to Yerandi repair
6 Kurkheda IX 2.40 41.99 48.97 0 48.97 15 4 2013 15 4 2018 2.00 20.00
oli Road BT renewal
10.00 +Patch
Gadchir repair
7 Kurkheda SH 233 to Chichtola IX 0.80 27.25 30.55 0 30.55 10 7 2012 10 7 2017 0.80 10.00
oli BT renewal
20.00 +Patch
Gadchir repair
8
oli
Gadchiroli VR 35 -Maregaon VII 3.40 89.35 83.58 0 83.58 16 2 2009 29 6 2010 2.00 BT renewal 20.00
3 All the roads proposed for maintenance are due for maintenance under Special repais as per the PCI & Maintenance priority list prepared at the district level.
4 The scope of the special repairs to all the road works for the District costing Rs..............Lac are physically verified and confirmed.
5 The work scope proposed for the road is not taken previously or presently under any other Govt. programme excluding this proposal.
6 The defect liability / 5 year maintenance period of all the roads under consideration has been completed. No road is proposed for repairs whose defect liability contract is in force.
Executive Engineer
PMGSY, MRRDA
District