This document contains calculations to determine the heating and cooling load for Room 10 Monsoon. It lists various building structures and their associated heat gains. It calculates the total sensible heat at 6575.38 BTU/hr and total latent heat at 2240.89 BTU/hr. Adding these gives a total space heat of 8816.27 BTU/hr, equivalent to 0.7347 tons of cooling required.
This document contains calculations to determine the heating and cooling load for Room 10 Monsoon. It lists various building structures and their associated heat gains. It calculates the total sensible heat at 6575.38 BTU/hr and total latent heat at 2240.89 BTU/hr. Adding these gives a total space heat of 8816.27 BTU/hr, equivalent to 0.7347 tons of cooling required.
This document contains calculations to determine the heating and cooling load for Room 10 Monsoon. It lists various building structures and their associated heat gains. It calculates the total sensible heat at 6575.38 BTU/hr and total latent heat at 2240.89 BTU/hr. Adding these gives a total space heat of 8816.27 BTU/hr, equivalent to 0.7347 tons of cooling required.
This document contains calculations to determine the heating and cooling load for Room 10 Monsoon. It lists various building structures and their associated heat gains. It calculates the total sensible heat at 6575.38 BTU/hr and total latent heat at 2240.89 BTU/hr. Adding these gives a total space heat of 8816.27 BTU/hr, equivalent to 0.7347 tons of cooling required.