A' A B C D E N F G H I J K LEGEND:

AR-53
2470 30970 NEW WALLS/PARTITION KEY

1750 8300 ARLEGUI ST 8300 5245 3015 875 3285 DP Ch1 GW2
4640 3715 4535 3765 4355 885
DRYWALL PARTITION CHB WALL GLASS PARTITION

GLASS WALL / WINDOW KEY:

1200

1200
6mm THK. FRAMELESS INTERIOR CLEAR GLASS
GW2
WALLS & SIDELIGHTS

B' W
WINDOW SET, 6MM THK CLEAR GLASS ON
POWDER COATED ALUMINUM FRAMES
AR-55A

3600

3600
OUTLINE OF PORTAL GREEN
OUTLINE OF SHUTTER HOUSING CURTAIN WALL (12mm THK. LOW-E TEMPERED
PROVISION FOR MOTORIZED OVERHEAD PROVISION FOR MOTORIZED SECURITY
ABOVE (BY OTHERS) CW GLASS WITH STRUCTURAL SEALANT & POWDER
SECURITY BARRIER (BY OTHERS) ENTRY BARRIER (BY OTHERS) COATED ALUMINUM FRAMES AT THE BACK)

3915 660 7740 600 7540 570 3485 3680 VERTICAL GARDEN DOOR KEY:
(BY OTHERS)
DG

545
GLASS DOORS (REFER TO DOOR SCHEDULE)

1475

1505
1535
EXIT SOLID CORE WOODEN DOOR

930

930
DG1 CW1 600 600 750 655 985 DW
DG1 (REFER TO DOOR SCHEDULE)

1 FLUSH HOLLOW CORE DOORS

725
CW2 ATM STO. DH (REFER TO DOOR SCHEDULE)

1800

1800

1800
1790
DM METAL DOORS (REFER TO DOOR SCHEDULE)
DH1
DM4 FLUTED GLASS DOORS ON METAL FRAMES & JAMBS

645
DF (REFER TO DOOR SCHEDULE)
3700 5065 7510

5600
MAIN LOBBY 21

3800

3800
WAITING AREA

7770

5600
6765
±0.150 M FFL

5620
E

5600
DW7

3700 4210 20

1800
2060
DW6 1140 3550 2570 640 395 S

765
MAIL ROOM
±0.100 M FFL

705
1100
830

620
DW5

700
W DG2
E

2590

2790
AR-54A 1245
DH1
1705 1100 2430 2775

2625
FT AR-53A

5380
3785 2160 DW1

3590
2965

3030
2955
MT DW1
MOTOR STORAGE
DM1 PWD

4655

1260
DW1 FE

625
625
3

680
830
PUMP ROOM 1

A A'

±1300
1 DW6 1870

2315
3070
AR-55 ±11910 2660 AR-55

2120
±1495 ±4645 ±2350 19

±3450
±0.150 M FFL
VIP DROP OFF

2410
6245
7585

2080

2080

1800
DG2 DG2

±8100
ELEVATOR LOBBY 18
00
±0.100 M FFL R6
34540

WSP DM5

1175
±1755
295 2400 2665

2620

3200
±2210
EE
IDF

1145
DM1 DH3
830

2
4
630
865

R3
00
±8805
1300
1980
3020
3285

13 14 17
DM1

4780
1900

1900

5
PUMP ROOM 2 12

3 16
1730

±0.100 M FFL
2830
50
22

10
50

4
6200

25

OUTLINE OF WALL
43

ABOVE
700 15 5135
5 3250 200 945 140
600
DH1
5
67

W6
6

1825

1825
6
F.E. PULL DOWN STAIR
BMS CONTROL ROOM
2515

(FROM 2F)

495 1000
DH1
+0.150 M FFL
7 8 9 10 11
7
5910

4185
800 11780
4520 800 6460 W3a

2100
2150

8 W6

585
DH1 DH1
1245

F.E. PULL DOWN STAIR

1230
CABINET
(FROM 2F)
9

1485
W6 GUARDS QUARTERS
JANITORS QUARTER
00

37
10
5

NOTE: GARBAGE CABINET 05


97

1145
LO DH2
PURSUANT TO ITEM 5 OF ANNEX 'A' OF THE REVISED IMPLEMENTING RULES CK FEMALE
2200
ER CHANGING 700 1580
AND REGULATION OF R.A. 9184, THE APPROVAL BY THE AUTHORIZED S CH
AN ROOM
00

GOVERNMENT OFFICIALS OF DETAILED ENGINEERING SURVEYS AND DESIGNS GIN


13

1375
UNDERTAKEN BY CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY 20 DH2 GR DH2
OF THE LATTER FOR THE TECHNICAL INTEGRITY OF THE SURVEYS AND
DESIGNS NOR TRANSFER ANY PART OF THE RESPONSIBILITY TO THE
S
85
FEMALE
OO
DH2
M MALE 1 GROUND FLOOR PLAN
APPROVING OFFICIALS. AR-54A AR-02 SCALE: 1:100 MTS
16
50
35

THE DESIGN CONSULTANT SHALL BE HELD FULLY RESPONSIBLE FOR THE MALE
23

FAILURE OF THE FACILITIES / STRUCTURES DUE TO FAULTY DESIGN EXCEPT 15 1750 4185
50
FOR THE CHANGES MADE WITHOUT THE CONFORMITY OF THE CONSULTANTS.

REPUBLIC OF THE PHILIPPINES


DESIGNED: SUBMITTED: PROJECT AND LOCATION: SHEET CONTENTS: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS SET NO. SHEET NO.
BUILDINGS DIVISION
DESIGN-AND-BUILD SCHEME FOR THE COMPLETION OF GROUND FLOOR PLAN BONIFACIO DRIVE PORT AREA, MANILA
ARLEGUI STREET, SAN MIGUEL, MANILA

IRENEO P. ROQUE RETROFITTING / RESTORATION OF - REVIEWED AS TO DESIGN CONCEPT: RECOMMENDING APPROVAL: APPROVED CONCURRED - AR
ARCHITECT PRESIDENTIAL MANAGEMENT STAFF - SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE SEE COVER SHEET FOR SIGNATURE
- 01
PRC NO. / IAPOA 11009 / 09239 244543 102218
(PMS) BUILDING PHASE II, ARLEGUI ST., SAN MIGUEL, MANILA -
JOSEPHINE P. ISTURIS LEA N. DELFINADO, CESO IV EMIL K. SADAIN, CESO 1 FERDINAND B. CUI, JR.
-
PTR NO. / DATE & PLACE ISSUED 5641332 / 01-10-18/QUEZON CITY PRESIDENT / MANAGER (REVISED OCTOBER 9, 2018) DIVISION CHIEF, BUILDING DIVISION DIRECTOR IV, BUREAU OF DESIGN Undersecretary for UPMO Operations and Technical Sevices UNDERSECRETARY, ACTING HEAD