The document summarizes the results of a HY-8 analysis of Culvert Crossing 1. It shows the headwater elevation, total discharge, discharge through the culvert, discharge over the roadway, and number of iterations at each elevation point. The analysis found that the culvert could handle all discharge under 3508.53 feet of headwater elevation, but there was overtopping when the elevation reached 3512.5 feet with a total discharge of 1804.59 cubic feet per second.
The document summarizes the results of a HY-8 analysis of Culvert Crossing 1. It shows the headwater elevation, total discharge, discharge through the culvert, discharge over the roadway, and number of iterations at each elevation point. The analysis found that the culvert could handle all discharge under 3508.53 feet of headwater elevation, but there was overtopping when the elevation reached 3512.5 feet with a total discharge of 1804.59 cubic feet per second.
The document summarizes the results of a HY-8 analysis of Culvert Crossing 1. It shows the headwater elevation, total discharge, discharge through the culvert, discharge over the roadway, and number of iterations at each elevation point. The analysis found that the culvert could handle all discharge under 3508.53 feet of headwater elevation, but there was overtopping when the elevation reached 3512.5 feet with a total discharge of 1804.59 cubic feet per second.