MDRF Format

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Wireless Infrastructure R4G-70-CQM-QAP-PR-001

Quality Management Plan

24. Material Discrepancy Report Format:


Material Discrepancy
Report

State/Circle: City/Area: MDR No.:


Originator/Field Engineer: W.O. No.: Date:
Material
Duct OFC Mast Others (Please Specify)
Category

Description Of Material Discrepancy (By Originator):

Signature:
Field Engineer
Corrective Action Recommended By Area Manager / Materials Control Group for
Replacement of Material / substitution

Signature: Signature: Date:


Area Manager Quality Engineer
Rework Quantity In Case Recommendation Results In Rework
Effect in Cost :- Effect in Time

Field Engineer: Area Manager: Circle Head:

Action Taken To Prevent Recurrence (By Warehouse)

Signature:______________Date:_________
Warehouse In-Charge

Closed By:

Name Sign Date


Warehouse In-Charge
Area Manager For Record
Quality Team For Rework Data Compilation
C.C.

Format No.: R4G-70-CQA-FMT-PR-003-00

Reliance Jio Infocomm Limited Rev. 01 Issue date : 1-July-13 Page 23 of 28

You might also like