Professional Documents
Culture Documents
ERP
ERP
Journaling and General Ledger accumulate financial transactions into data that can be
handled by accounting and bookkeeping departments, and which is reported to the
General Ledger.
Process Map
The AR component has a batch Journal Extract process that extracts all the financial
activities that were posted to the system (and were not reported to G/L from the last
Journaling Process run), and extracts these activities, with all the relevant information
that will be required for the Journaling process.
Journal Analyze handles the Journal Extract file that was produced by the Journal Extract
process, and for each financial transaction, it assigns logical accounts based on the
qualification rules defined during the implementation phase. For each logical account, the
relevant breakdown attributes are needed, and attached to the activity. The process
produces the Journal Analyze file.
Journal Accumulation process performs G/L accumulation of similar G/L transactions. If
there are similar G/L transactions (same logical account (GL code) and same breakdown
fields), the activities are summed. For the accumulated transaction, the process will map
to the relevant G/L physical account (GL code).
GL Entry
The AR component will provide flexibility for mapping financial transactions to various
GL codes (defined by implementation). Even single financial activity, such as invoice or
credit may be broken to the charge level and therefore will have multiple G/L
transactions sent to oracle each containing different G/L physical account.
GL feed is required in Oracle specific format on circle wise basis. There should be
control total with of number of records and total amount should come as file header at file
level and batch level and total of all the detail lines of a batch should tally with batch
control total and total of all the detail lines in a file should tally with total of file header.
The AR component will report every immediate financial activity that affects the account
balance to the transaction log which, as part of end-of-day processing, is reported to the
G/L module.
When a bill cycle is confirmed, all pending transactions and all the charges that are
billed, also generate transaction log entries and are reported to G/L at the end-of-day. The
financial activities that are part of G/L reporting are:
Invoice
Payment
Backout
Fund transfer from
Fund transfer to
Credit (all levels – account, invoice and charge)
Credit Reversal
Refund
Refund Reversal
Deposit Creation
Deposit Release
Deposit Cancel
Dishonored Check
Dispute Creation
Dispute Cancel
Dispute Justify
Dispute Reject
Write Off
Write Off Reversal
AR component provides flexibility to run G/L process on required basis for more than
once in a day. It provides an extract that has accumulated financial data at G/L code level
to Oracle.
Revenue streams
System Enabled. We may define different charge codes for different services. Set of/each
charge code(s) can be mapped to a different GL code for journaling.
Asset Receivables
System Enabled. Break down rules can be configured to map different security deposits,
rentals and tax to different GL codes.
Audit Trail for G/L transactions
The AR component maintains detailed GL information. This provides audit trail for G/L
posting down to the transaction level.
Subscriber wise details (mentioning the bill cycle too) will be required for each GL feed
as a document support for entries in ERP through GL feed. These details are available in
data base and using Extract Tool, data can be extracted by account in excel readable
format.
Extract
Extract UB
UB Report
Report
Unbilled OC data relevant to the current calendar month is extracted from Amdocs
Invoicing and Unbilled UC is extracted from Rater.
The files are sent to Amdocs Accounts Receivable. The GL processes are activated with
the Rater and Invoicing input files. The GL groups and maps the data into the GL table
according to the GL rules defined in the implementation stage.
An extract process extracts the unbilled information at the end of the month in CSV
format.
While calculating unbilled usage, recurring charges and one time charges, all discounts
allowances & loyalty points, whether on real time basis (callable) or on billing basis,
should have been factored. Objective is to book the net revenue accruing to the company.
The unbilled usage charges considered for Journaling are including event discounts.
The journalized data would be like below where journal calendar month end is
30/04/2008:
Acct1
Acct2
Acctn
Buckets should be configurable. Total Security Deposit amount against each customer
account along with breakup i.e. ISD Security Deposit, Intl. Roaming security deposit etc..
Above report should also include Secured debtors & unsecured debtors.
All the Interfacing GL fees is required in readable excel report format on periodic basis,
available before the end of the month also
Subscriber related general information and security deposits details like date and month
of deposits etc is also required.
ADDITIONAL FUNCTIONAL REQUIREMENTS (TO
BE ANALYZED FOR FEASIBILITY)
Requirement Feasibility
Sl. Assessmen
No. t Date Feasibility Comment
Daily earned and unearned rental (daily 12/10/2009
prorated RC) + unbilled usage updates to Not supported in product
1 external GL
User should be able to extract the report for 20/10/2009
unbilled transactions, during the month also, The product supports journalizing
starting from 1st calendar day to date of unbilled transactions at end of month
extraction or date mentioned for reports and only.
2 on adhoc basis
Unapplied Receipts 20/10/2009 Not supported in product
3
STARTUP KIT PROCESS
The “Startup Kit process” will include processes related to startup kit component
procurement, kitting, distribution, payment, receipts and return processes. This section
covers the processes under all such scenarios.
The Startup Kit process can be broadly divided into three high level processes
1. Procurement, Receipt and Payment
2. Pairing and Kitting
3. Distribution and Activation.
A high level process flow diagram is shown below:
Startup Kit components procurement & payment process
The procurement of the components for startup kit is explained in the following flow
diagram.
Sub-Processes Requirements
Purchase - Based on the monthly projection, the Marketing department creates
Requisition requisitions. The requisition can be monthly for each circle and will be
created by a pre-defined date.
Creation
- Business user will specify the item code (SIM, etc.) in the requisition.
- Business user can create requisitions from pre-defined requisition
templates.
- Business user will attach the SIM series (from Technical team)
information to be sent to the SIM vendor along with the requisition.
- Other requirements:
o Business user can query on the existing requisitions.
o Business user can cancel existing requisitions.
o Business user can change the existing requisitions in incomplete state.
o Business user can query on the existing stock status information.
o Business user can access the existing pre-negotiated prices from the
purchase agreements from the existing catalogue.
o Business user can create a new requisition by copying an existing
requisition.
o Buyer can see the existing list of open requisitions.
o Business user can create requisitions against valid account codes only.
o Business user can create requisitions against multiple account codes.
o Auto-generation of requisitions can be possible if Min-Max planning
process is adopted.
o Ability to prevent users entering invalid account codes (Circle code,
department/division, account, etc). Account alias functionality is
required make selection of account codes easier and more user-friendly.
Purchase - The requisition will be approved based on given delegation of
Requisition authority (if applicable).
- Approvers will get notifications with details for taking actions.
Approval
- Approver should have visibility of total budget, approved requisitions
till date and unconsumed budget.
- An approver can forward the requisition to another person by adding
the approver name.
- The approval hierarchy will based on authorization limits by amount,
item category, charge account and location. - Users can impose
budgetary controls to stop users creating Requisition if allocated budget
is already consumed. It can be at GL account level or based on
predefined budget parameters. A message should popup to user if it is
over budget and user should not able to save the transaction.
Purchase - Business users can cancel the open purchase requisition completely or
Requisition partially.
Cancellation - Only authorized users can cancel a requisition.
Reporting - A Report should available for buyer with all the open requisition along
with a list of potential vendors who provides the requested items, these
vendors history, details of all the contract made with them, Pending
releases, purchase documents currently released to them with received,
un-received, in-transit quantity details, Vendors past performance
analysis etc
- List of open requisitions with details for starter kit components/
recharge vouchers.
- List of requisitions based on different criteria like items, dates, status
(approved, cancelled, open, close), etc.
- Requisition summary
- Requisition details
- Requisition analysis
- Requisition approval DOA
- Requisition reconciliation
Sub-Processes Requirements
- On physical receipt of material from the vendor, the receiver (SCM)
GRN creation
will create a GRN in the system and record the actual quantity
received based on the purchase order selected.
- GRN will be created against purchase order.
- Each receipt can be associated with a lot number.
- Suppliers can submit advance shipment notice on portal where
vendor can enter shipment details prior to the actual physical shipment
of material. ASN should contain all the details required to create GRN
in the system and can be referred while creating GRN to avoid manual
data entry.
- Date wise dispatch schedule against purchase orders will be available
On the portal for the supplier.
- Needs ability to capture all the documents supplier requires from
Datacom before shipment take place.
- Once the GRN has been made ASN should not be updatable.
- Inspection can be performed at the vendor site before physical
Inspection
dispatch of the shipment. In case of any issues, it should be fixed
before the shipment is physically dispatched.
- Receiver (SCM) will inspect the received goods for quantity or other
visible issues and Approve/ Reject before delivering the goods into
inventory.
- Receiver (SCM) will capture the reasons in case of Rejections.
Deliver to - Once the above steps are completed, the goods will be delivered to
inventory and be available for use.
inventory
- SCM will deliver the material in the relevant sub-inventory in the
warehouse for stocking the material.
- List of GRNs/ material delivered to inventory based on different
Reporting
criteria like items, dates, suppliers, etc.
- List of receipts based on the inspection result.
- Stock details report.
- Inventory ageing report
- Obsolete inventory report
- Written off inventory report
- Stock register report.
Vendor invoice generation and payment
Sub-Processes Requirements
- Finance users will create vendor invoice against a purchase order on
Invoice creation
receipt of the original invoice.
Invoice validation, - Finance users will match the vendor invoice against a purchase order
approval, cancellation, or a GRN (full or partial quantity).
matching - Invoice validation and approval process will be completed.
- Based on the approved invoice and payment terms, the Finance team
Payment
will release payment.
- Payment batch can be created by clubbing multiple invoices into a
single payment.
- List invoices in the system along with their status.
Reporting
- Payment report based on suppliers, dates, etc.
The pairing and kitting of the components into startup kit is explained in the following
flow diagram.
Process Step Description
Mobile Number Input: Mobile Number Series received from the regulatory
Series Process:
- The Marketing Department will receive the number series from the
Generation
regulatory body.
- It will segregate the number series in buckets based on the bucketing
policy (premium number series, corporate series, etc.).
Output: Bucket wise number series along with the series available for pre-
paid in the retail market.
Pairing of SIM Input:
numbers and - SIM number series received from the vendor SIM file
- Since there will be more than one file from the vendor, there should be a
Mobile numbers
check list to verify all the file received and technical team should be able to
confirm the accuracy of file and its contents in same checklist.
- Pre-paid mobile number series for retail
Process:
- SCM will receive the vendor SIM file in advance before the physical
receipt of the SIM shipment.
- Initially, CSD will do the pairing for all the available SIM series and
Mobile number but later paring activity will be done on request basis to
manage the inventory level against distributor orders. System generated
notification with order no, number of starter kit to be paired, type of starter
kit (lifetime, standard etc) will be sent to corporate CSD or a predefined
mail distribution list.
- The pairing information will be sent to the SCM circle warehouse team to
be used in the kitting process.
Output: SIM series and Mobile series pairing
Kitting of Starter Input:
- SIM series and Mobile series pairing
Packets
- Starter pack components at the kitting warehouse Process:
- SCM will arrange to move the starter pack components to the kitting area
in the warehouse outsourced to a kitting vendor.
- SCM will receive the SIM & Mobile number pairing information from
CSD.
- Kitting of starter packets performed by outsourced vendor.
- Sample inspection by SCM/ Marketing on the completed starter packets.
- Starter packets handed over to Datacom SCM personnel for storage into
inventory.
Output: Starter Packets with all the components and pairing information
Sub-Processes Requirements
Receipt of Mobile - The Number series owner from the Marketing team will receive the
Number series Mobile Number series from the Regulatory authority.
Upload of the - The Number series owner will be responsible for uploading the series
into the Subscriber Resource Management (SRM) system.
series
Number - Based on the policy framed by the Marketing department, the SRM
system will allocate the available mobile number series in buckets viz.
bucketing
premium series, corporate series, retail series, etc.
- CSD will have access to the retail series for pre-paid in the system.
Sub-Processes Requirements
Receipt of SIM file - SCM will receive the vendor SIM file in advance before the physical
receipt of the SIM shipment.
from vendor
Upload of SIM - The SIM series will be uploaded in the SRM by SCM.
series
Pairing - CSD will do the pairing of the SIM series and the mobile number series.
Release of - The pairing information will be sent to the SCM circle warehouse team
pairing to be used in the kitting process. The pairing information is also sent to the
Technical team for loading into IN and HLR.
information
Kitting process
Sub-Processes Requirements
Receipt of kitting - The components required for starter packets will be made available to
components in the kitting vendor in the kitting area by the SCM department.
kitting area
Pairing - SCM will receive the SIM & Mobile number pairing information from
information to CSD.
the kitting
team
- Based on the components received and the pairing information by the
Kitting process
kitting vendor, kitting will be done in the kitting area of the circle
warehouse.
- SCM/ Marketing will do a random sample inspection from time to time
Inspection
on the completed kits.
- Any defects will be recorded & reported to the kitting vendor by the
inspector.
- Kitting vendor to review the complete lot and take corrective actions.
Deliver to - SCM/ Marketing will do a random sample inspection from time to time
on the completed kits.
inventory
- Any defects will be recorded & reported to the kitting vendor by the
inspector.
- Kitting vendor to review the complete lot and take corrective actions.
Deliver to - Starter packets handed over to Datacom SCM.
inventory - SCM delivers the completed starter packets into inventory.
- Accounting for valuation of inventory will be on FIFO value basis.
Reporting - Tracker for reconciliation between the number of components issued
versus the number of kits produced.
Sub-Processes Requirements
Receipt of Sales - All sales orders will be placed by the distributor on its letter head or
email along with payment details. These details will be received by the
Order & Payment
Sales department.
- Sales team ensures the details to be put in a pre-defined template and
forwards it to Sales coordinator along with payment details.
- Sales coordinator will check for stock availability.
- Sales coordinator will create Sales order in the system using bulk upload
from MS Excel.
- Sales coordinator will forward the payment details to Finance along with
payment instrument in case of a demand draft.
Payment - Finance takes necessary steps towards payment realization.
processing - If the order is a new distributor, Finance verifies relevant documents
and Order before allotting a unique customer number to the party.
- Any shortage in the required documents will be coordinated with the
confirmation
distributor with the help of Sales.
- Any discrepancy in the above, order is declined and Finance conveys the
message to the Sales admin who communicates to the distributor.
- Invoice will get generated once Finance has confirmed the payment
realization from the distributor and after getting the confirmation from
Bank/ MIS.
- There will be a restriction in generating an invoice for distributors
having negative or less balance.
- Each sales order will have a unique number in a circle.
- Invoice print/ re-print & Gate pass report
Reporting
- Sales order report with status
- Distributor detail listing reporting
Order Processing
Sub-Processes Requirements
- SCM receives the information on payment confirmation mail from
Order processing
Finance. An email would go to SCM for shipment of goods and a SMS
will go to pre-defined mobile number/s in sales or other department.
- Stock issuance and valuation will be carried out on a FIFO basis
- In case of Stock out scenario, Sales to confirm on the shipment priority
on the existing open sales orders.
- SCM prepares for packaging the kits available in the circle inventory.
- Package is picked by the logistics team (part of SCM).
Distribution
- Stock gets depleted from the inventory. At this point of time a SMS will
go to Predefined mobile number/s in sales or other department with status
of shipment confirmation.
- Invoice is generated by finance (previous step) and a print out of the
invoice is attached along with the package.
- The logistics team co-ordinates with the third party shipper for package
shipment.
- Invoice copy print/ re-print
Reporting
- Sale register/ Invoice details report
- Stock transfer report
The recharge voucher process will broadly involve procurement of printed recharge
voucher, payments, distribution, receipts, activation and returns. This section covers the
processes under all such scenarios.
A high level process flow is given below:
The re-charge voucher procurement (printing job) is explained in the following flow
diagram.
Process Step Description
Demand planning - The Marketing team will collect data for sales history along with market
for Recharge research reports, if any.
vouchers - Data on the past and expected promotion schemes is gathered.
- Based on the above information, demand generation is done.
- The demand plans are presented in the form of monthly projections
distributor/ zone wise/circlewise.
- The monthly projection is communicated to the SCM department for
material planning.
Voucher Series Inputs: Demand details from SCM department
Process: Voucher series is generated by the technical team based on the
Generation
inputs received from the SCM department.
Output: File containing encrypted voucher series
Create Purchase - Based on the monthly projection, the Marketing department creates
Requisitions for requisitions. The requisition can be monthly for each circle and will be
Re-charge created by a pre-defined date.
vouchers based on - Business user will specify the item code (SIM, etc.) in the requisition.
- Business user can create requisitions from pre-defined requisition
projected demand
templates.
- Business user will attach the SIM series (from Technical team)
information to be sent to the SIM vendor along with the requisition.
- Other requirements:
o Business user can query on the existing requisitions.
o Business user can cancel existing requisitions.
o Business user can change the existing requisitions in incomplete state.
o Business user can query on the existing stock status information.
o Business user can access the existing pre-negotiated prices from the
purchase agreements from the existing catalogue.
o Business user can create a new requisition by copying an existing
requisition.
o Buyer can see the existing list of open requisitions.
o Business user can create requisitions against valid account codes only.
o Business user can create requisitions against multiple account codes.
o Auto-generation of requisitions can be possible if Min-Max planning
process is adopted.
o Ability to prevent users entering invalid account codes (Circle code,
department/division, account, etc). Account alias functionality is required
make selection of account codes easier and more user-friendly.
Create Purchase - Request for Quotation (RFQs):
Orders o SCM will create RFQs on multiple suppliers.
based on Blanket o SCM user will enter quotation against the RFQ for each supplier.
- Award of Contract:
Rate Agreements
o Buyer will perform a quote analysis.
o The best quote will be selected and a blanket purchase order agreement
(rate contract) will be created.
o The approval hierarchy for agreement approval will based on
authorization limits by amount, item category, charge account and location.
Create GRN for On physical receipt of material from the vendor, the receiver (SCM) will
the
components create a GRN in the system and record the actual quantity received based
received at the on the purchase order selected.
Warehouse - GRN will be created against purchase order.
- Each receipt can be associated with a lot number.
- Suppliers can submit advance shipment notice on portal where vendor
can enter shipment details prior to the actual physical shipment of material.
ASN should contain all the details required to create GRN in
the system and can be referred while creating GRN to avoid manual data
entry. (Will be implemented as part of drop II)
- Date wise dispatch schedule against purchase orders will be available on
the portal for the supplier.
- Needs ability to capture all the documents supplier requires from
Datacom before shipment take place.
- Once the GRN has been made ASN should not be updatable.
Invoice generation - Finance users will create vendor invoice against a purchase order on
in the receipt of the original invoice.
system and
payment
processing to the
vendors
Sub-Processes Requirements
Requirements receipt - The Technical department will receive the requirements for series
for the Re-charge generation from the SCM department based on the monthly requisition
demand created by the Marketing department.
vouchers
Re-charge - Based on the above requirements, the Technical department would
voucher series generate re-charge voucher series in the voucher generation system.
- The file to be sent to the printer will be encrypted and password
generation
protected.
Communication - One of the files which is password protected and encrypted will be
of the voucher sent by the Technical team to the SCM team (for sending it to the
series and printing vendor)
uploading of - The series in the second file will be uploaded in the IN system in
inactive status.
the file
Reporting - Re-charge voucher series
Sub-Processes Requirements
Intimation by - Once the Re-charge voucher shipment reaches the distributor, he sends
distributor on information to the zonal coordinator on the same through SMS/e-mail
physical receipt of - Once the validation is done by the zonal co-ordinator, the Technical
team (IN) is intimated on the Re-charge voucher series to be activated
material
through e-mail/FAX. In exceptional cases it can be done through
SMS/Phone but e-mail or FAX confirmation will be required the next day
for future reference purpose. This process will be followed till the
automation of the recharge voucher activation happens through the
DMS system.
Activation - On getting the intimation on shipment received at the distributor end, the
Technical team activates the received Re-charge voucher series in the
process
IN system. The series will already be present in the IN system in inactive
state.
Reporting - List of re-charge vouchers activated
The following sections explain the customer creation & sales return processes.
4.1 Customer Creation/Update Process
The customer creation/ maintenance process is explained in the following flow diagram.
Sub- Requirements
Processes
New distributor - On identification of a new distributor, the Sales team gets all required
identified/ change documents from the distributor.
in existing - The documents reach the Sales administrator who fills a pre-defined
distributor customer creation/ modification template.
- The filled template for creation/ change of distributor information is sent
information
to the Finance team along with other documents and security deposit, if
applicable
Create/ Change - On receipt of the information in a pre-defined template and other
distributor documents, the Finance verifies the received documents.
- If the request is for new customer and if the documentation is in order,
information
Finance approves the customer creation request. For any change in
information, only the required documents are verified and the request is
approved- In case of any discrepancies, Finance reverts to the Sales admin
with the relevant notes and reasons for rejection.
- In case of a new customer,
o Customer classification is assigned (Pre-paid/ PCO/ etc.)
o The customer number will be a numeric automatic generated running
number.
o In case of a pre-existing customer with the same name, the new customer
name will be suffixed with some other relevant word or a star (*). The
customer number will be a unique identifier for each customer.
Reporting - A report listing all existing customers with other relevant information.
4.2 Sales Return Process (for Starter kit & Re-charge voucher)
Sub- Requirements
Processes
Identification and - Any issue at the retailer or customer end will flow to the distributor or
retailer helpdesk (Sales/CSD/Technical team needs to define policy)
intimation of issue
- Scope of BRD is limited to Oracle ERP related requirements only.
Therefore only the process of return from distributor is detailed out here
and sale made to retailer/customer or any sales return from
retailer/customer are not included in this document
- For return from distributor, the distributor informs the zonal Sales
coordinator and arranges for physical return of the defective item.
De-activation - The zonal Sales coordinator fills the information received in a predefined
template and sends it to:
process
o CSD in case of SIM de-activation
o IN team in case of Re-charge voucher de-activation
- On receipt of the request, the CSD/ IN team will do de-activate the
SIM/RC.
Inspection of - Inspection will be done by SCM/ Marketing on the count and value of the
material received RC on the physical material received.
- Based on the inspection observations, decision will be taken either to:
at warehouse
o Scrap the material
o Return to vendor
Issue of - Replacement will be issued once concerned departments (CSD -
replacement SIM/IN-RCV & RA) confirm non-usability of SIM/ Re-charge voucher.
- On receipt of confirmation, replacement from the existing stock will be
against return
issued:
o Replacement of SIM will be against a zero value invoice.
o Replacement of Re-charge voucher will be a sales return along with a
credit note.
Reporting - Sales Returns report