Professional Documents
Culture Documents
Igc 3
Igc 3
1. Excavation(Physical
hazard.
personnel “only.
activity of painting.
respirator.
chemical hazards.
1 day
1 Month.
Immediately
1 month.
1 Month.
Immediately
1 month.
collision.
damage.
death.
head injuries.
movements.
corners.
construction site.
procedures.
1 week.
1month(Hiring
competent
person)
1 month.
1 day.
1 month.
1 day.
1 Month.
Immediately
3 weeks
1 week.
and vibration.
drilling machine.
done by instructions.
40Kgs.
limit.
facility.
workplace culture.
1 month
3 weeks
1 week.
4 weeks.
2 days
4 weeks.
1 Week
1 month.
4hrs.
1 month.
1 day
1 month
2 days.
3 weeks
irritation to eyes.
fracture of bones
17. Trip Hazard: Trailing of cables at
injury.
pain.
diseases or Dermatitis,Legionellosis.
Ventilation system.
door.
housekeeping.
ceiling.
cables,
bacteria.
1 month
1 day
4 Weeks.
3 days.
4 weeks.
1 week.
1 month
2 days.
1 month
orientation mandatorily.
needs.
cafeteria.
Demonstrates the management
of their employees.
work site.
employees