SC Recomendation IPC No 29 (21 Dec 2018)
SC Recomendation IPC No 29 (21 Dec 2018)
Valuation Total Limit (85%) of the Adjusted Contract Value QAR 6,460,000,000.00
Consultant : KEO International Consultants Last Addendum / Variation No. 0
* Total KPI Amount Certified at the End of Year One QAR 0.00 Total Additions QAR 0.00
5 KPI Deduction : (* to be subtracted)
* Held KPI amount (from Work Value to Date) QAR 0.00
Total Consultant Fee for this period QAR 0.00 Total QAR 0.00
Total Recovery of Advance Payment no.1 (….. from Work Value To Date) QAR 978,488,876.76
Additional Advance Payment No.2 ..% (from remaining Contract Amt... QAR) QAR 0.00
1 GENERAL ITEMS 739,024,000.00 575,813,939.20 0.00 575,813,939.20 77.92% 575,813,939.20 0.00 575,813,939.20 77.92% 0.00
2 DESIGN 147,820,000.00 147,184,374.00 0.00 147,184,374.00 99.57% 147,184,374.00 0.00 147,184,374.00 99.57% 0.00
3 CONSTRUCTION OF BU THELAH ROAD 119,928,000.00 119,014,148.64 0.00 119,014,148.64 99.24% 119,014,148.64 0.00 119,014,148.64 99.24% 0.00
AL KHOR EXPRESSWAY ROAD WORKS
4.1 AKE-ROAD WORKS - PACKAGE 1 809,783,600.90 377,139,641.08 0.00 377,139,641.08 46.57% 377,152,288.01 0.00 377,152,288.01 46.57% (12,646.93)
4.2 AKE-ROAD WORKS - PACKAGE 2 & 3 818,197,463.60 473,805,523.76 0.00 473,805,523.76 57.91% 473,807,812.81 0.00 473,807,812.81 57.91% (2,289.05)
4.3 AKE-ROAD WORKS - PACKAGE 4 906,314,935.50 535,358,230.26 0.00 535,358,230.26 59.07% 535,358,282.07 0.00 535,358,282.07 59.07% (51.81)
INTERCHANGES WORKS
5.1 INTERCHANGE A 221,616,000.00 205,471,803.20 0.00 205,471,803.20 92.72% 205,471,842.09 0.00 205,471,842.09 92.72% (38.89)
5.2 INTERCHANGE B 263,720,000.00 239,295,928.24 0.00 239,295,928.24 90.74% 239,295,852.59 0.00 239,295,852.59 90.74% 75.65
5.3 INTERCHANGE C 285,228,000.00 247,495,186.66 0.00 247,495,186.66 86.77% 247,495,169.47 0.00 247,495,169.47 86.77% 17.19
5.4 INTERCHANGE D 217,360,000.00 203,827,521.40 0.00 203,827,521.40 93.77% 203,827,523.69 0.00 203,827,523.69 93.77% (2.29)
5.5 INTERCHANGE E 56,772,000.00 51,373,777.50 0.00 51,373,777.50 90.49% 50,894,724.08 0.00 50,894,724.08 89.65% 479,053.42
5.6 INTERCHANGE F & F1 272,536,000.00 261,990,479.97 0.00 261,990,479.97 96.13% 261,990,479.96 0.00 261,990,479.96 96.13% 0.01
5.7 INTERCHANGE G & G1 185,744,000.00 176,970,650.05 0.00 176,970,650.05 95.28% 176,970,628.05 0.00 176,970,628.05 95.28% 22.00
5.8 INTERCHANGE H 173,432,000.00 151,634,766.03 (903,718.01) 150,731,048.02 86.91% 151,634,762.12 0.00 151,634,762.12 87.43% (903,714.10)
UTILITIES WORKS
6.1 STORMWATER DRAINAGE 613,139,644.80 307,443,295.01 (58,680,765.76) 248,762,529.25 40.57% 307,444,240.00 0.00 307,444,240.00 50.14% (58,681,710.75)
6.2 STORM WATER TUNNEL AND SHAFTS 315,400,000.00 210,614,265.32 (31,305,222.54) 179,309,042.78 56.85% 210,447,452.89 0.00 210,447,452.89 66.72% (31,138,410.11)
6.3 CONSTRUCTION OF PUMP STATION 3,753,676.80 0.00 0.00 0.00 0.00% 0.00 0.00 0.00 0.00% 0.00
7 KAHRAMAA - WATER WORKS 131,691,494.40 104,501,200.26 (10,095,244.77) 94,405,955.49 71.69% 104,501,111.59 0.00 104,501,111.59 79.35% (10,095,156.10)
8 TSE WORKS 311,261,918.40 126,999,531.28 (33,872,234.57) 93,127,296.71 29.92% 127,000,302.00 0.00 127,000,302.00 40.80% (33,873,005.29)
9 FOUL SEWER 20,293,315.20 16,378,006.29 (40,586.64) 16,337,419.65 80.51% 16,378,006.29 0.00 16,378,006.29 80.71% (40,586.64)
10 KAHRAMAA - ELECTRICAL WORKS 370,147,723.20 325,409,962.99 (58,092,604.93) 267,317,358.06 72.22% 325,409,743.92 0.00 325,409,743.92 87.91% (58,092,385.86)
11 STREET LIGHTING 252,473,865.60 67,622,789.52 (36,487,964.87) 31,134,824.65 12.33% 67,623,112.35 0.00 67,623,112.35 26.78% (36,488,287.70)
12.0 TELECOM - QNBN, OOREDOO AND VODAFONE WORKS 53,528,995.20 43,884,301.43 (1,524,318.44) 42,359,982.99 79.13% 43,884,230.50 0.00 43,884,230.50 81.98% (1,524,247.51)
13 QAF WORKS 41,231,793.60 21,017,226.47 (5,188,821.26) 15,828,405.21 38.39% 20,984,050.24 0.00 20,984,050.24 50.89% (5,155,645.03)
UGN WORKS
14 157,517,572.80 90,929,964.48 (19,091,098.32) 71,838,866.16 45.61% 90,929,906.86 0.00 90,929,906.86 57.73% (19,091,040.70)
(MOI - SSD)
15 TESTING, COMMISSIONING AND HANDING OVER 12,084,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
16 PROVISIONAL SUM - LANDSCAPE AND IRRIGATION NETWORK 100,000,000.00 0.00 0.00 0.00 0.00
Total - BoQ Items 7,600,000,000.00 5,081,176,513.04 (255,282,580.11) 4,825,893,932.93 63.50% 5,080,513,983.42 0.00 5,080,513,983.42 66.85% (254,620,050.49)
(A) Total Sum QR 7,600,000,000.00 5,081,176,513.04 (255,282,580.11) 4,825,893,932.93 5,080,513,983.42 0.00 5,080,513,983.42 (254,620,050.49) (A)
(B) Payment on Account for Variations (Appendix-B5), QR 0.00 (B) Refer to Appendix B5 for the details.
(C) Day works, QR 0.00 (C )
(D) NEW RATES (Appendix B5 added by contractor ),QR 0.00 (D)
(E) Material on Site (Appendix-B8),QR 43,978,553.77 22,829,197.10 66,807,750.87 43,978,553.77 20,467,526.43 64,446,080.20 2,361,670.67 (E)
(F) Less: Deduction for NCR & Other Items (257,300.00) 0.00 (257,300.00) (257,300.00) (F)
(G) Total Valuation,QR 7,600,000,000.00 5,124,897,766.81 (232,453,383.01) 4,892,444,383.80 64.37% 5,124,492,537.19 20,467,526.43 5,144,960,063.62 67.70% (252,515,679.82) (A+B+C+D+F)= (G)
(H) Add Unrecovered Advance Payment (Appendix_B7),QR 706,015,255.92 (164,504,132.68) 541,511,123.24 495,101,492.56 (4,093,505.28) 491,007,987.28 50,503,135.96 (H)
(I) Less Retention (Appendix-B6),QR (203,496,186.02) (41,126,033.17) (244,622,219.19) (256,224,626.86) (1,023,376.32) (257,248,003.18) 12,625,783.99 (G *0.05)= (I)
Add: Release of Retention 203,496,186.02 - 203,496,186.02 158,244,532.63 - 158,244,532.63 45,251,653.39 (J)
Less: Penalty for Delay (1,000,419.00) - (1,000,419.00) (1,000,419.00)
- 0.00
Other Additions (by contractor as financial costs) 0.00
EOT for Completion and Recovery Costs 0.00
(J) Total Certified (QR) - Incl Adv.P 5,829,912,603.73 (438,083,548.86) 5,391,829,054.87 5,521,613,935.52 15,350,644.83 5,536,964,580.35 J=G+H+I
(K) Less Advance Payment ,QR (1,520,000,000.00) (1,520,000,000.00) (1,520,000,000.00) (1,520,000,000.00) 0.00 (K)
(L) Net Valuation (QR) 4,309,912,603.73 (438,083,548.86) 3,871,829,054.87 50.95% ### 15,350,644.83 4,016,964,580.35 52.85% (145,135,525.48) L= J+K
16 PROVISIONAL SUM - LANDSCAPE AND IRRIGATION NETWORK 100,000,000.00 0.00 0.00% 0.00% 0.00%
1 GENERAL ITEMS
Remarks
Advance Payment
Interim Payment (Nov & Dec 2016)
Release of Retention
Interim Payment (21 Apr 2018)
Release of Retention
Interim Payment (21 May 2018)
- -
- -
Net Retention
Payment Cumulative Gross Cumulative
S/N Description Date Amount
No. Certified Retention
(a)
1 1 Advance Payment
2 2 Payment for Works done as of End 25 December 2016 12-Feb-17 28,871,456.00 1,443,572.80 1,443,572.80
3 3 Payment for Works done as of End 25 January 2017 2-Mar-17 216,653,932.50 10,832,696.63 9,389,123.83
4 4 Payment for Works done as of End 25 March 2017 3-Apr-17 337,479,780.91 16,873,989.05 6,041,292.42
5 5 Payment for Works done as of End 25 April 2017 3-May-17 457,693,684.70 22,884,684.24 6,010,695.19
6 6 Payment for Works done as of End 25 May 2017 6-Jun-17 565,356,297.11 28,267,814.86 5,383,130.62
7 7 Payment for Works done as of End 25 June 2017 2-Jul-17 667,215,143.81 33,360,757.19 5,092,942.33
8 8 Payment for Works done as of End 25 July 2017 2-Aug-17 774,540,026.94 38,727,001.35 5,366,244.16
9 9 Payment for Works done as of End 25 August 2017 28-Aug-17 934,444,803.52 46,722,240.18 7,995,238.83
10 10 Payment for Works done as of End 10 October 2017 10-Oct-17 1,194,772,620.16 59,738,631.01 13,016,390.83
11 11 Payment for Works done as of End 21 October 2017 22-Nov-17 1,274,419,952.30 63,720,997.62 3,982,366.61
12 12 Payment for Works done as of End 21 November 2017 22-Nov-17 1,494,600,215.45 74,730,010.77 11,009,013.15
13 13 Payment for Works done as of End 10 December 2017 17-Dec-17 1,811,930,842.08 90,596,542.10 15,866,531.33
14 14 Payment for Works done as of End 21 January 2018 30-Jan-18 2,158,182,270.86 107,909,113.54 17,312,571.44
15 15 Payment for Works done as of End 21 February 2018 5-Mar-18 2,506,320,823.04 125,316,041.15 17,406,927.61
16 16 Payment for Works done as of End 21 March 2018 5-Apr-18 2,796,205,715.19 139,810,285.76 14,494,244.61
18 18 Payment for Works done as of End 21 April 2018 10-May-18 3,164,890,652.63 158,244,532.63 18,434,246.87
20 20 Payment for Works done as of End 21 May 2018 5-Jun-18 3,515,851,753.72 175,792,587.69 17,548,055.06
21 21 Payment for Works done as of End 21 June 2018 1-Jul-18 3,762,838,326.63 188,141,916.33 12,349,328.64
Net Retention
Payment Cumulative Gross Cumulative
S/N Description Date Amount
No. Certified Retention
(a)
22 22 Payment for Works done as of End 21 July 2018 1-Aug-18 4,069,923,720.41 203,496,186.02 15,354,269.69
24 24 Payment for Works done as of End 21 August 2018 4-Sep-18 4,892,444,383.80 244,622,219.19 41,126,033.17
Release of Retention
Remarks
(b)
Release of Retention
Remarks
(b)
203,496,186.02
41,126,033.17 c=a-b
Remarks
a-b = c
Certified MOS
S.No BoQ Bill Material Type Amount (QR)
Previous This Month
Certified MOS
Amount (QR) Remarks
To Date
591,910.80
54,560,916.79
11,654,923.28
ix H: 30m High Mast Column Pole; 3x400W no. 130 130 22,776.00 2,960,880.00 80%
x H: 30m High Mast Column Pole; 3x600W no. 204 204 21,447.40 4,375,269.60 80%
xi H: 30m High Mast Column Pole; 3x600W no. 312 312 160 152 22,776.00 3,461,952.00 80%
Subtotal
6.2 STORM WATER TUNNEL AND SHAFTS
RC Jacking Pipe (ID-3000mm Dia) - for Storm
i m NA NA 3,366.00 0.00 3,366.00 3,366.00 0.00 5,100.00 0.00 80%
Water Micro Tunnel
i 600mm Dia DI pipes for Portable Water Works m NA NA 4,998.00 0.00 4,998.00 4,998.00 0.00 486.80 0.00 80%
Subtotal
iii Lime Stone 0-5 mm t NA NA 1,012.06 0.00 1,012.06 1,012.06 0.00 76.46 0.00 80%
Subtotal
SubTotal (BOQ Items)
0.00
0.00
0.00
0.00
876,082.61
9,007.94
988,299.26
10,659.84
19,435.52
11,661.31
835,727.36
265,568.16
2,368,704.00
3,500,215.68
2,769,561.60
11,654,923.28
0.00
591,910.80
0.00
0.00
54,560,916.79
66,807,750.87
Amount of De
S/N REFERENCE # Description
Previous
The insitu air voids and density of Asphalt Wearing Course at CH22+240 to
4 AKE-BTR-KEO-NCR-RD-00076 75,000.00
CH23+880 LHS (both lanes)….
The Supervision Consultant observed the poor quality work and many uncompleted
5 AKE-PH0-KEO-NCR-SL-00097 12,000.00
items related to Street lighting system at TTM2….
Please find attached Asphalt Base Course class A- 151 layer (Location CH:11+190
6 AKE-PH0-KEO-NCR-RD-00172 to 11+430 RHS}, Core samples in place air voids tests results not complying with 11,500.00
QCS 2014 requirements between 6 to 8 % (ACES and Fugro labs).
Package 1, IC-A - Ch. 1 +300 - One portion of EN6 road crossing ducts was found
7 AKE-PH0-KEO-NCR-EL-00204 10,000.00
demolished due to clashing with wet utility line as…..
Layers of BC Class A at 0+324 to 0+615 (RHS). No coring was done on the
8 AKE-PH0-KEO-NCR-RD-00224 14,600.00
preceding layers (BC Class A….
With reference to ACES lab Test Report no. TMR 18051435 Asphalt Base Course,
9 AKE-PH0-KEO-NCR-QA-00231 Class A (1st layer) In-place Air Voids and Relative Density of 6 pairs of cores from 12,000.00
Ch. 0+330 to Ch. 0+570…
Amount of De
S/N REFERENCE # Description
Previous
0.00 51,500.00
0.00 46,700.00
0.00 24,000.00
0.00 75,000.00
0.00 12,000.00
0.00 11,500.00
0.00 10,000.00
0.00 14,600.00
0.00 12,000.00
0.00 257,300.00
APPENDIX B10 - STATUS OF CLAIMS / MISSING ITEMS / OTHER DISPUTES CLAIMED BY CONTRACTOR
AMOUNT CLAIMED BY
REF DESCRIPTION
CONTRACTOR
REMARKS
DESIGN AND BUILD OF AL KHOR EXPRESSWAY Page 26 of 351 Appendix B10 - Works other than SI/VO
PAYMENT CERTIFICATE LEDGER
Contract No : C2017/113
Description : Design and Build of Al Khor Expressway
Employer : Public Works Authority
Consultant : KEO International Consultants
Contractor : TEKFEN Construction and Installation Co., Inc
Certificate No Less
Period Certificate Previous Monthly Valuation Less
Total Valuation Advance Payment Recovery of Less KPI Net Valuation
New Old Ending Date Valuation (Certified) Retention
Advance Payment
1 1,520,000,000.00
2 1 25-Dec-16 12-Feb-17 28,871,456.00 - 28,871,456.00 - (5,774,291.20) (1,443,572.80) 21,653,592.00
3 2 25-Jan-17 2-Mar-17 216,653,932.50 28,871,456.00 187,782,476.50 (37,556,495.30) (9,389,123.83) 140,836,857.37
4 3 25-Mar-17 3-Apr-17 337,479,780.91 216,653,932.50 120,825,848.41 (24,165,169.68) (6,041,292.42) 90,619,386.31
5 4 25-Apr-17 3-May-17 457,693,684.70 337,479,780.91 120,213,903.79 (24,042,780.76) (6,010,695.19) 90,160,427.84
6 5 25-May-17 6-Jun-17 565,356,297.11 457,693,684.70 107,662,612.41 (21,532,522.48) (5,383,130.62) 80,746,959.31
7 6 25-Jun-17 2-Jul-17 667,215,143.81 565,356,297.11 101,858,846.70 (20,371,769.34) (5,092,942.33) 76,394,135.03
8 7 25-Jul-17 2-Aug-17 774,540,026.94 667,215,143.81 107,324,883.13 (21,464,976.63) (5,366,244.16) 80,493,662.34
9 8 25-Aug-17 28-Aug-17 934,444,803.52 774,540,026.94 159,904,776.58 (31,980,955.31) (7,995,238.83) 119,928,582.44
10 9 10-Oct-17 10-Oct-17 1,194,772,620.16 934,444,803.52 260,327,816.64 (52,065,563.33) (13,016,390.83) 195,245,862.48
11 21-Oct-17 21-Nov-17 1,274,419,952.30 1,194,772,620.16 79,647,332.14 (15,929,466.43) (3,982,366.61) 59,735,499.10
12 21-Nov-17 21-Nov-17 1,494,600,215.45 1,274,419,952.30 220,180,263.15 (44,036,052.63) (11,009,013.15) 165,135,197.37
13 10-Dec-17 17-Dec-17 1,811,930,842.08 1,494,600,215.45 317,330,626.63 (63,466,125.33) (15,866,531.33) 237,997,969.97
14 21-Jan-18 30-Jan-18 2,158,182,270.86 1,811,930,842.08 346,251,428.78 (69,250,285.75) (17,312,571.44) 259,688,571.59
15 21-Feb-18 5-Mar-18 2,506,320,823.04 2,158,182,270.86 348,138,552.18 (69,627,710.44) (17,406,927.61) 261,103,914.13
16 21-Mar-18 5-Apr-18 2,796,205,715.19 2,506,320,823.04 289,884,892.15 (57,976,978.43) (14,494,244.61) 217,413,669.11
17 21-Mar-18 9-Apr-18 2,796,205,715.19 2,796,205,715.19 0.00 0.00 107,909,113.54 107,909,113.54
18 21-Apr-18 10-May-18 3,164,890,652.63 2,796,205,715.19 368,684,937.44 (73,736,987.49) (18,434,246.87) 276,513,703.08
19 21-Apr-18 28-May-18 3,164,890,652.63 3,164,890,652.63 0.00 0.00 50,335,419.09 50,335,419.09
20 21-May-18 5-Jun-18 3,515,851,753.72 3,164,890,652.63 350,961,101.09 (70,192,220.21) (17,548,055.06) 263,220,825.82
21 21-Jun-18 1-Jul-18 3,762,838,326.63 3,515,851,753.72 246,986,572.91 (49,397,314.59) (12,349,328.64) 185,239,929.68
Certificate No Less
Period Certificate Previous Monthly Valuation Less
Total Valuation Advance Payment Recovery of Less KPI Net Valuation
New Old Ending Date Valuation (Certified) Retention
Advance Payment
22 21-Jul-18 1-Aug-18 4,069,923,720.41 3,762,838,326.63 307,085,393.78 (61,417,078.75) (15,354,269.69) 230,314,045.34
23 21-Jul-18 9-Aug-18 4,069,923,720.41 4,069,923,720.41 0.00 0.00 45,251,653.39 45,251,653.39
24 21-Aug-18 4-Sep-18 4,892,444,383.80 4,069,923,720.41 822,520,663.39 (164,504,132.68) (41,126,033.17) 616,890,497.54
5,391,829,054.87
Contract No : C2017/113
Project Name : Design and Build of Al Khor Expressway
Employer: Public Works Authority Interim Payment No :
Consultant : KEO International Consultants Period Ending :
Contractor : TEKFEN Construction and Installation Co., Inc Recommend. Date :
Contractor Claimed
SC Certified Amount
Amount
Description
(A) (B)
(QAR) (QAR)
a) Preliminaries 575,813,939.20 575,813,939.20
2. Valuation Comments
N/A N/A
DESIGN AND BUILD OF AL KHOR EXPRESSWAY Page 31 of 351 PAYMENT CERTIFCATE RECOMMENDATION REPORT
PAYMENT CERTIFICATE RECOMMENDATION REPORT
Contract No : C2017/113
Project Name : Design and Build of Al Khor Expressway
Employer: Public Works Authority Interim Payment No :
Consultant : KEO International Consultants Period Ending :
Contractor : TEKFEN Construction and Installation Co., Inc Recommend. Date :
4. Recommendation
Pursuant to Clause 13.3 of General Conditinos of Contract, the Supervision Consultant recommendations that
IPC-24 for works executed by the Contractor up to 21 August 2018 in the net cumulative amount of
QAR 5,391,829,054.87 and period net amount of -QAR 438,083,548.86 be approved by the Authority and
subsequently paid to the Contractor.
Thomas Connolly
Senior Quantity Surveyor
KEO International Consultants
DESIGN AND BUILD OF AL KHOR EXPRESSWAY Page 32 of 351 PAYMENT CERTIFCATE RECOMMENDATION REPORT
TION REPORT
24
21 Aug 2018
4 Sep 2018
Difference
(A-B)
(QAR)
0.00
0.00
254,620,050.49
0.00
(2,361,670.67)
0.00
257,300.00
(12,625,783.99)
(45,251,653.39)
(50,503,135.96)
145,135,525.48
(308,298,668.21)
453,434,193.69
Referenced
Attachment
DESIGN AND BUILD OF AL KHOR EXPRESSWAY Page 33 of 351 PAYMENT CERTIFCATE RECOMMENDATION REPORT
TION REPORT
24
21 Aug 2018
4 Sep 2018
938
449
449
449
849
849
587
849
nt recommendations that
ive amount of
d by the Authority and
ntity Surveyor
ational Consultants
DESIGN AND BUILD OF AL KHOR EXPRESSWAY Page 34 of 351 PAYMENT CERTIFCATE RECOMMENDATION REPORT
Contract No : C2017/113
Project Name : Design and Build of Al Khor Expressway
Employer: Public Works Authority Interim Payment No :
Consultant : KEO International Consultants Period Ending :
Contractor : TEKFEN Construction and Installation Co., Inc Recommend. Date :
A B C = B-A
Page 36 of 351
B.
2,000,000,000
3,000,000,000
4,000,000,000
5,000,000,000
6,000,000,000
7,000,000,000
8,000,000,000
Contract No : C2017/113
187,782,477.00
187,782,477.00
120,825,848.00
Employer: Public Works Authority
120,825,848.00
120,213,904.00
120,213,904.00
Consultant : KEO International Consultants
107,662,612.00
107,662,612.00
101,858,847.00
101,858,847.00
107,324,883.00
Project Name : Design and Build of Al Khor Expressway
107,324,883.00
Contractor : TEKFEN Construction and Installation Co., Inc
159,904,777.00
159,904,777.00
260,330,000.00
260,327,817.00
,647,332.00
,647,332.00
Recommended Gross Value vs Planned Gross Value Histogram
220,180,263.00
220,180,263.00
317,330,627.00
317,330,627.00
346,251,429.00
346,251,429.00
355,843,819.00
348,138,551.00
Page 37 of 351
389,474,330.00
289,884,892.00
441,123,149.00
368,684,937.00
409,595,467.00
350,961,101.00
327,038,000.00
246,986,573.00
412,538,958.00
307,085,394.00
455,784,510.00
379,100,000.00
295,212,000.00
414,374,000.00
297,034,000.00
285,483,805.00
293,543,246.00
208,293,879.00
111,083,769.00
,803,322.00
Recommend. Date :
Interim Payment No :
Period Ending :
10.00
Employer:
1,000,000,000
2,000,000,000
3,000,000,000
4,000,000,000
5,000,000,000
0
IPC-2 28,871,456.00
(25-Dec-16) 28,871,456.00 Contract No : C2017/113
IPC-3 187,782,477.00
(25-Jan-17) 187,782,477.00
IPC-4 120,825,848.00
(25-Mar-17)
Public Works Authority
120,825,848.00
IPC-5 120,213,904.00
(25-Apr-17) 120,213,904.00
Consultant : KEO International Consultants
IPC-6 107,662,612.00
(25-May-17) 107,662,612.00
IPC-7 101,858,847.00
(25-Jun-17) 101,858,847.00
IPC-8 107,324,883.00
Project Name : Design and Build of Al Khor Expressway
(25-Jul-17) 107,324,883.00
Contractor : TEKFEN Construction and Installation Co., Inc
IPC-9 159,904,777.00
(25-Aug-17) 159,904,777.00
IPC-10 260,330,000.00
(10-Oct-17) 260,327,817.00
IPC-11 79,647,332.00
(21-Oct-17) 79,647,332.00
Monthly Cashflow IPC-12 220,180,263.00
(21-Nov-17) 220,180,263.00
IPC-13 317,330,
(21-Dec-17) 317,330,
IPC-14 34
(21-Jan-18) 34
IPC-15
(21-Feb-18) 3
Page 38 of 351
IPC-16
(21-Mar-18) 289,884,892.0
Recommended Amount
IPC-18
(21-Apr-18)
IPC-20
(21-May-18) 3
IPC-21 327,03
(21-Jun-18) 246,986,573.00
IPC-22
(21-Jul-18) 307,085,39
IPC-24
(21-Aug-18)
Accumulative Cashflow
IPC-25
(21-Sep-18)
IPC-26 295,212,000.
(21-Oct-18)
IPC-27
(21-Nov-18)
IPC-28 297,034,000.
(21-Dec-18)
IPC-29 285,483,805.00
(21-Jan-19)
IPC-30 293,543,246.0
(21-Feb-19)
IPC-31 208,293,879.00
(21-Mar-19)
Accumulative Recommended Amount
IPC-32 111,083,769.00
(21-Apr-19)
IPC-33 80,803,322.00
(21-May-19)
Recommend. Date :
Interim Payment No :
Period Ending :
IPC-34 53,520,910.00
(21-Jun-19)
24
21 Aug 2018
4 Sep 2018
Planned %
Remarks
Page 39 of 351
24
21 Aug 2018
4 Sep 2018
Page 40 of 351
409,595,467.00
350,961,101.00
327,038,000.00
246,986,573.00
412,538,958.00
307,085,394.00
455,784,510.00
379,100,000.00
295,212,000.00
414,374,000.00
297,034,000.00
285,483,805.00
293,543,246.00
208,293,879.00
111,083,769.00
,803,322.00
10.00
,354,218.00
1,131.00
.00
24
4 Sep 2018
21 Aug 2018
Page 41 of 351
100,000,000
150,000,000
200,000,000
250,000,000
300,000,000
350,000,000
400,000,000
450,000,000
500,000,000
IPC-20
(21-May-18) 3
IPC-21 327,03
(21-Jun-18) 246,986,573.00
IPC-22
(21-Jul-18) 307,085,39
IPC-24
(21-Aug-18)
Accumulative Cashflow
IPC-25
(21-Sep-18)
IPC-26 295,212,000.
(21-Oct-18)
IPC-27
(21-Nov-18)
IPC-28 297,034,000.
(21-Dec-18)
IPC-29 285,483,805.00
(21-Jan-19)
IPC-30 293,543,246.0
(21-Feb-19)
IPC-31 208,293,879.00
(21-Mar-19)
IPC-33 80,803,322.00
(21-May-19)
IPC-34 53,520,910.00
(21-Jun-19)
IPC-35 79,354,218.00
(21-Jul-19)
IPC-36 67,261,131.00
(21-Aug-19)
IPC-37 43,342,671.00
(21-Sep-19)
24
IPC-38 26,724,602.00
(21-Oct-19)
4 Sep 2018
21 Aug 2018
IPC-39 15,290,000.00
Page 42 of 351
(25-Nov-19)
-
50,000,000
100,000,000
150,000,000
200,000,000
250,000,000
300,000,000
350,000,000
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B01/1/A Performance Bond; in accordance with the Clause 4.2 of 123,120,000.00 100.00% 0.00% 100.00%
General Conditions of Contract
B01/1/B All insurances required for the contract; in accordance with Included
the Clauses 18.1, 18.2, 18.3 & 18.4 of General Conditions
of Contract
B01/1/C Provision of Engineer's Site Office and Facilities as per 8,436,000.00 100.00% 0.00% 100.00%
QCS 2014 Section 1 - General Part 11
B01/1/D Provision of Contractor's Site Office and Facilities as per 70,300,000.00 100.00% 0.00% 100.00%
QCS 2014 Section 1 - General Part 12
B01/43 Bill.1
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B01/1/F Allow for Obligations & Liabilities complying with Conditions 32,000,000.00 67.580% 0.000% 67.580%
of Contract
B01/1/G Allow for Quality Assurance, Testing and Health & Safety as 27,960,000.00 67.580% 0.000% 67.580%
per required by Conditions of Contract
B01/1/H Allow for other all necessary reuirements; such as 443,464,000.00 67.580% 0.000% 67.580%
superindendence, maintenance works and etc as per the
Conditions of Contract, except the temporary road
measured under bill 5.
B01/44 Bill.1
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B01/45 Bill.1
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
123,120,000.00 - 123,120,000.00
8,436,000.00 - 8,436,000.00
70,300,000.00 - 70,300,000.00
B01/46 Bill.1
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B01/47 Bill.1
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B01/48 Bill.1
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B02/49 Bill.2
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B02/50 Bill.2
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
147,184,374.00 - 147,184,374.00
B02/51 Bill.2
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
147,184,374.00 - 147,184,374.00
B02/52 Bill.2
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/1/B Relocation of Electrical Over Head Cables 562,162.50 100.00% 0.00% 100.00%
B03/53 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/54 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/2/B Relocation of Electrical Over Head Cables 4,065,559.20 100.00% 0.00% 100.00%
B03/55 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/56 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/3/B Relocation of Electrical Over Head Cables 503,697.60 100.00% 0.00% 100.00%
Earth Works including exacavation & filling works as
B03/3/C 3,813,710.40 100.00% 0.00% 100.00%
required
B03/3/D Road Crossing Ducts as required 239,856.00 100.00% 0.00% 100.00%
B03/57 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
CONSTRUCTION OF SUBSTATIONS
B03/58 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B03/59 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B03/60 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
111,982.77 - 111,982.77
562,162.50 - 562,162.50
972,915.90 - 972,915.90
8,224,152.55 - 8,224,152.55
3,746,250.90 - 3,746,250.90
4,310,811.96 - 4,310,811.96
7,152,206.10 - 7,152,206.10
B03/61 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,141,629.25 - 2,141,629.25
709,404.10 - 709,404.10
266,060.27 - 266,060.27
1,238,856.24 - 1,238,856.24
29,436,432.54 - 29,436,432.54
B03/62 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
215,870.40 - 215,870.40
4,065,559.20 - 4,065,559.20
1,457,125.20 - 1,457,125.20
25,112,923.20 - 25,112,923.20
4,317,408.00 - 4,317,408.00
5,036,976.00 - 5,036,976.00
9,678,189.60 - 9,678,189.60
6,961,820.40 - 6,961,820.40
B03/63 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
5,360,781.60 - 5,360,781.60
5,451,627.06 - 5,451,627.06
1,390,565.16 - 1,390,565.16
390,365.64 - 390,365.64
2,230,660.80 - 2,230,660.80
71,669,872.26 - 71,669,872.26
B03/64 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
23,985.60 - 23,985.60
503,697.60 - 503,697.60
3,813,710.40 - 3,813,710.40
239,856.00 - 239,856.00
887,467.20 - 887,467.20
1,607,035.20 - 1,607,035.20
1,367,179.20 - 1,367,179.20
887,467.20 - 887,467.20
B03/65 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,526,683.44 - 1,526,683.44
143,913.60 - 143,913.60
71,956.80 - 71,956.80
839,496.00 - 839,496.00
5,995,395.60 - 5,995,395.60
17,907,843.84 - 17,907,843.84
B03/66 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
29,436,432.54 - 29,436,432.54
71,669,872.26 - 71,669,872.26
17,907,843.84 - 17,907,843.84
B03/67 Bill.3
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
119,014,148.64 - 119,014,148.64
B03/68 Bill.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.1/1/J Prime Coat and Asphalt Road Base Course 150,028,607.75 35.640% 0.000% 35.640%
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.1/1/L Tack Coat and Asphalt Wearing Course 71,771,120.55 0.960% 0.000% 0.960%
B4.1/1
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.2/1/J Prime Coat and Asphalt Road Base Course 166,945,010.47 66.560% 0.000% 66.560%
B4.2/1/K Tack Coat and Asphalt Intermediate Course 97,880,962.57 39.530% 0.000% 39.530%
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.2/1
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.3/1/J Prime Coat and Asphalt Road Base Course 147,774,650.24 58.820% 0.000% 58.820%
B4.3/1/K Tack Coat and Asphalt Intermediate Course 102,359,208.82 30.156% 0.000% 30.156%
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B4.3/1
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
56,213,713.49 - 56,213,713.49
27,289,707.35 - 27,289,707.35
62,599,348.72 - 62,599,348.72
85,285,078.37 - 85,285,078.37
36,568,716.39 - 36,568,716.39
13,589,951.16 - 13,589,951.16
18,221,189.41 - 18,221,189.41
16,418,122.81 - 16,418,122.81
53,470,195.80 - 53,470,195.80
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
689,002.76 - 689,002.76
- - -
929,316.57 - 929,316.57
- - -
- - -
377,139,641.08 - 377,139,641.08
Bill 4.1
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
38,599,629.15 - 38,599,629.15
16,773,048.00 - 16,773,048.00
21,268,500.11 - 21,268,500.11
109,853,770.42 - 109,853,770.42
43,111,024.81 - 43,111,024.81
29,738,602.82 - 29,738,602.82
32,321,076.04 - 32,321,076.04
30,925,332.13 - 30,925,332.13
111,118,598.97 - 111,118,598.97
38,692,344.50 - 38,692,344.50
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
- - -
824,779.13 - 824,779.13
290,641.17 - 290,641.17
- - -
473,805,523.76 - 473,805,523.76
Bill 4.2
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
14,760,324.80 - 14,760,324.80
37,530,501.48 - 37,530,501.48
40,918,836.90 - 40,918,836.90
181,540,546.05 - 181,540,546.05
57,143,209.25 - 57,143,209.25
25,230,600.59 - 25,230,600.59
33,780,300.79 - 33,780,300.79
25,450,327.22 - 25,450,327.22
86,921,049.27 - 86,921,049.27
30,867,443.01 - 30,867,443.01
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
- - -
893,686.34 - 893,686.34
321,404.56 - 321,404.56
- - -
-
535,358,230.26 - 535,358,230.26
Bill 4.3
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.1/81 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/82 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/83 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.1/84 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/85 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.1/3/B Bridges - Top Slab (Girder) - Production 23,620,833.17 100.000% 0.000% 100.000%
B5.1/3/C Bridges - Top Slab (Girder) - Installation 7,354,142.04 100.000% 0.000% 100.000%
B5.1/86 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/87 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/88 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/89 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/90 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.1/91 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.1/92 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
4,797,532.38 - 4,797,532.38
142,046.68 - 142,046.68
982,384.79 - 982,384.79
31,787,030.31 - 31,787,030.31
894,391.27 - 894,391.27
36,454.46 - 36,454.46
263,980.56 - 263,980.56
5,798,144.39 - 5,798,144.39
B5.1/93 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.1/94 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.1/95 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
19,678,551.26 - 19,678,551.26
4,765,049.19 - 4,765,049.19
4,160,177.59 - 4,160,177.59
8,153,445.96 - 8,153,445.96
9,735,596.64 - 9,735,596.64
B5.1/96 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
46,492,820.64 - 46,492,820.64
B5.1/97 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
4,755,257.82 - 4,755,257.82
23,620,833.17 - 23,620,833.17
7,354,142.04 - 7,354,142.04
14,160,340.48 - 14,160,340.48
1,968,864.51 - 1,968,864.51
5,356,302.70 - 5,356,302.70
5,343,989.36 - 5,343,989.36
890,793.16 - 890,793.16
6,706,922.13 - 6,706,922.13
B5.1/98 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
71,275,265.73 - 71,275,265.73
B5.1/99 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,469,565.24 - 2,469,565.24
3,704,347.87 - 3,704,347.87
7,010,761.49 - 7,010,761.49
6,242,930.98 - 6,242,930.98
5,423,597.49 - 5,423,597.49
B5.1/100 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.1/101 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
24,851,203.07 - 24,851,203.07
B5.1/102 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
62,852,513.76 - 62,852,513.76
46,492,820.64 - 46,492,820.64
71,275,265.73 - 71,275,265.73
24,851,203.07 - 24,851,203.07
B5.1/103 Bill.5.1-IC A
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
205,471,803.20 - 205,471,803.20
B5.1/104 Bill.5.1-IC A
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.2/1/D Bridges - Foundation (or Bottom Slab) 38,746,375.12 100.000% 0.000% 100.000%
B5.2/105 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/1/M Underpasses - Foundation (or Bottom Slab) 26,128,307.11 100.000% 0.000% 100.000%
B5.2/106 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/107 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.2/108 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/109 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.2/3/B Bridges - Top Slab (Girder) - Production 24,715,362.33 100.000% 0.000% 100.000%
B5.2/3/C Bridges - Top Slab (Girder) - Installation 9,075,418.67 100.000% 0.000% 100.000%
B5.2/110 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/111 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/112 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/113 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/114 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/115 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.2/116 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.2/117 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,376,559.19 - 2,376,559.19
145,362.36 - 145,362.36
1,280,573.16 - 1,280,573.16
38,746,375.12 - 38,746,375.12
656,822.51 - 656,822.51
40,762.99 - 40,762.99
585,295.00 - 585,295.00
B5.2/118 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,071,374.42 - 1,071,374.42
97,677.35 - 97,677.35
919,090.04 - 919,090.04
26,128,307.11 - 26,128,307.11
B5.2/119 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.2/120 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
15,252,115.39 - 15,252,115.39
5,315,777.77 - 5,315,777.77
7,086,393.38 - 7,086,393.38
8,603,181.44 - 8,603,181.44
19,899,068.82 - 19,899,068.82
B5.2/121 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
56,156,536.80 - 56,156,536.80
B5.2/122 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
9,282,416.56 - 9,282,416.56
24,715,362.33 - 24,715,362.33
9,075,418.67 - 9,075,418.67
18,218,598.98 - 18,218,598.98
2,199,468.61 - 2,199,468.61
- - -
4,641,208.28 - 4,641,208.28
773,689.42 - 773,689.42
B5.2/123 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
B5.2/124 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.2/125 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
3,042,165.33 - 3,042,165.33
4,563,248.00 - 4,563,248.00
6,535,013.42 - 6,535,013.42
6,731,113.75 - 6,731,113.75
6,096,779.86 - 6,096,779.86
B5.2/126 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.2/127 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
26,968,320.36 - 26,968,320.36
B5.2/128 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
76,911,300.80 - 76,911,300.80
56,156,536.80 - 56,156,536.80
79,259,770.28 - 79,259,770.28
26,968,320.36 - 26,968,320.36
B5.2/129 Bill.5.2-IC B
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
239,295,928.24 - 239,295,928.24
B5.2/130 Bill.5.2-IC B
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.3/1/D Bridges - Foundation (or Bottom Slab) 39,489,303.19 100.000% 0.000% 100.000%
B5.3/131 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/1/H Subways - Foundation (or Bottom Slab) 17,614,622.51 100.000% 0.000% 100.000%
B5.3/1/M Underpasses - Foundation (or Bottom Slab) 19,100,203.57 100.000% 0.000% 100.000%
B5.3/132 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/133 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.3/134 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/135 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.3/3/B Bridges - Top Slab (Girder) - Production 25,431,159.17 100.000% 0.000% 100.000%
B5.3/3/C Bridges - Top Slab (Girder) - Installation 9,222,391.13 100.000% 0.000% 100.000%
B5.3/136 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/137 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/138 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/139 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.3/140 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.3/141 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
4,214,803.20 - 4,214,803.20
167,965.52 - 167,965.52
1,352,427.04 - 1,352,427.04
39,489,303.19 - 39,489,303.19
1,892,005.40 - 1,892,005.40
147,948.90 - 147,948.90
629,217.99 - 629,217.99
B5.3/142 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
17,614,622.51 - 17,614,622.51
1,479,489.05 - 1,479,489.05
91,380.21 - 91,380.21
849,400.77 - 849,400.77
19,100,203.57 - 19,100,203.57
B5.3/143 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
87,028,767.35 - 87,028,767.35
B5.3/144 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
16,350,438.25 - 16,350,438.25
5,441,802.12 - 5,441,802.12
5,684,874.99 - 5,684,874.99
17,029,593.07 - 17,029,593.07
21,366,698.16 - 21,366,698.16
B5.3/145 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
65,873,406.59 - 65,873,406.59
B5.3/146 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
9,282,167.62 - 9,282,167.62
25,431,159.17 - 25,431,159.17
9,222,391.13 - 9,222,391.13
10,349,444.77 - 10,349,444.77
4,455,238.57 - 4,455,238.57
1,784,924.24 - 1,784,924.24
6,419,434.30 - 6,419,434.30
641,943.43 - 641,943.43
6,268,459.42 - 6,268,459.42
B5.3/147 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
73,855,162.65 - 73,855,162.65
B5.3/148 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,868,403.13 - 1,868,403.13
2,802,604.69 - 2,802,604.69
6,387,369.65 - 6,387,369.65
3,819,015.99 - 3,819,015.99
5,860,456.61 - 5,860,456.61
B5.3/149 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
20,737,850.07 - 20,737,850.07
B5.3/150 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
87,028,767.35 - 87,028,767.35
65,873,406.59 - 65,873,406.59
73,855,162.65 - 73,855,162.65
20,737,850.07 - 20,737,850.07
B5.3/151 Bill.5.3-IC C
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
247,495,186.66 - 247,495,186.66
B5.3/152 Bill.5.3-IC C
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.4/1/D Bridges - Foundation (or Bottom Slab) 19,040,892.61 100.000% 0.000% 100.000%
B5.4/153 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/1/M Underpasses - Foundation (or Bottom Slab) 236,222.99 100.000% 0.000% 100.000%
B5.4/154 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/155 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.4/156 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/157 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.4/158 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/159 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/160 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/161 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.4/162 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.4/163 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
888,403.81 - 888,403.81
261,899.39 - 261,899.39
823,112.37 - 823,112.37
19,040,892.61 - 19,040,892.61
4,053,204.84 - 4,053,204.84
448,970.38 - 448,970.38
2,109,867.35 - 2,109,867.35
B5.4/164 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
305,182.48 - 305,182.48
22,741.96 - 22,741.96
1,722,520.36 - 1,722,520.36
236,222.99 - 236,222.99
B5.4/165 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
73,361,173.60 - 73,361,173.60
B5.4/166 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
11,692,276.40 - 11,692,276.40
4,446,366.15 - 4,446,366.15
5,044,093.65 - 5,044,093.65
28,991,119.25 - 28,991,119.25
3,242,364.55 - 3,242,364.55
B5.4/167 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
53,416,220.00 - 53,416,220.00
B5.4/168 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
7,493,270.62 - 7,493,270.62
18,255,486.53 - 18,255,486.53
6,883,933.74 - 6,883,933.74
11,245,718.90 - 11,245,718.90
4,824,771.76 - 4,824,771.76
2,856,702.57 - 2,856,702.57
7,109,614.07 - 7,109,614.07
1,184,821.70 - 1,184,821.70
2,297,836.02 - 2,297,836.02
B5.4/169 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
62,535,128.58 - 62,535,128.58
B5.4/170 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,559,616.62 - 1,559,616.62
2,339,424.93 - 2,339,424.93
3,971,507.02 - 3,971,507.02
2,749,293.16 - 2,749,293.16
3,895,157.49 - 3,895,157.49
B5.4/171 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
14,514,999.22 - 14,514,999.22
B5.4/172 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
73,361,173.60 - 73,361,173.60
53,416,220.00 - 53,416,220.00
62,535,128.58 - 62,535,128.58
14,514,999.22 - 14,514,999.22
B5.4/173 Bill.5.4-IC D
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
203,827,521.40 - 203,827,521.40
B5.4/174 Bill.5.4-IC D
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.5/1/D Bridges - Foundation (or Bottom Slab) 8,457,830.59 100.000% 0.000% 100.000%
B5.5/175 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/176 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.5/177 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/178 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.5/3/B Bridges - Top Slab (Girder) - Production 4,707,233.14 100.000% 0.000% 100.000%
B5.5/3/C Bridges - Top Slab (Girder) - Installation 2,756,012.07 100.000% 0.000% 100.000%
B5.5/179 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/180 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/181 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/182 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/183 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/184 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.5/185 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.5/186 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,551,414.45 - 1,551,414.45
55,044.88 - 55,044.88
327,112.07 - 327,112.07
8,457,830.59 - 8,457,830.59
833,360.21 - 833,360.21
15,511.40 - 15,511.40
188,744.90 - 188,744.90
B5.5/187 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
13,726,901.87 - 13,726,901.87
B5.5/188 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
4,074,026.61 - 4,074,026.61
1,299,103.11 - 1,299,103.11
1,548,682.59 - 1,548,682.59
2,703,312.57 - 2,703,312.57
B5.5/189 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
9,625,124.88 - 9,625,124.88
B5.5/190 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,156,699.62 - 2,156,699.62
4,707,233.14 - 4,707,233.14
2,756,012.07 - 2,756,012.07
5,777,124.49 - 5,777,124.49
- - -
- - -
1,676,011.83 - 1,676,011.83
- - -
B5.5/191 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
17,073,081.15 - 17,073,081.15
B5.5/192 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,085,650.96 - 1,085,650.96
1,628,476.43 - 1,628,476.43
2,141,251.09 - 2,141,251.09
2,089,878.09 - 2,089,878.09
2,191,144.35 - 2,191,144.35
B5.5/193 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
9,136,400.92 - 9,136,400.92
B5.5/194 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
289,962.99 - 289,962.99
289,962.99 - 289,962.99
289,962.99 - 289,962.99
193,308.66 - 193,308.66
289,962.99 - 289,962.99
367,286.45 - 367,286.45
91,821.61 - 91,821.61
- - -
B5.5/195 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
1,812,268.68 - 1,812,268.68
B5.5/196 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
13,726,901.87 - 13,726,901.87
9,625,124.88 - 9,625,124.88
17,073,081.15 - 17,073,081.15
9,136,400.92 - 9,136,400.92
1,812,268.68 - 1,812,268.68
B5.5/197 Bill.5.5-IC E
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
51,373,777.50 - 51,373,777.50
B5.5/198 Bill.5.5-IC E
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
FOUNDATION WORKS
B5.6/1/D Tunnels - Foundation (or Bottom Slab) 55,291,544.98 100.000% 0.000% 100.000%
Collection Page
13,665,863.95 - 13,665,863.95
250,579.14 - 250,579.14
675,141.17 - 675,141.17
55,291,544.98 - 55,291,544.98
15,527,152.65 - 15,527,152.65
212,281.02 - 212,281.02
1,690,588.50 - 1,690,588.50
109,423,204.01 - 109,423,204.01
36,278,734.57 - 36,278,734.57
32,809,141.43 - 32,809,141.43
69,087,876.00 - 69,087,876.00
21,989,693.07 - 21,989,693.07
3,664,948.85 - 3,664,948.85
32,749,162.53 - 32,749,162.53
5,458,193.75 - 5,458,193.75
63,861,998.20 - 63,861,998.20
2,103,977.92 - 2,103,977.92
3,155,966.88 - 3,155,966.88
4,207,955.84 - 4,207,955.84
5,043,992.51 - 5,043,992.51
5,105,508.61 - 5,105,508.61
109,423,204.01 - 109,423,204.01
69,087,876.00 - 69,087,876.00
63,861,998.20 - 63,861,998.20
19,617,401.76 - 19,617,401.76
261,990,479.97 - 261,990,479.97
FOUNDATION WORKS
B5.7/1/D Bridges - Foundation (or Bottom Slab) 33,067,682.98 100.000% 0.000% 100.000%
B5.7/1/M Underpasses - Foundation (or Bottom Slab) 6,754,762.59 100.000% 0.000% 100.000%
SUB-STRUCTURE WORKS
SUPER-STRUCTURE WORKS
B5.7/3/B Bridges - Top Slab (Girder) - Production 12,949,824.64 100.000% 0.000% 100.000%
B5.7/3/C Bridges - Top Slab (Girder) - Installation 9,209,780.23 100.000% 0.000% 100.000%
Collection Page
2,514,698.49 - 2,514,698.49
170,237.53 - 170,237.53
932,748.42 - 932,748.42
33,067,682.98 - 33,067,682.98
1,153,345.61 - 1,153,345.61
65,686.51 - 65,686.51
998,982.31 - 998,982.31
594,462.90 - 594,462.90
49,264.88 - 49,264.88
105,645.80 - 105,645.80
6,754,762.59 - 6,754,762.59
54,738,756.80 - 54,738,756.80
10,823,460.39 - 10,823,460.39
4,562,169.83 - 4,562,169.83
4,865,036.57 - 4,865,036.57
9,978,117.16 - 9,978,117.16
8,108,777.65 - 8,108,777.65
38,337,561.60 - 38,337,561.60
5,858,019.53 - 5,858,019.53
12,949,824.64 - 12,949,824.64
9,209,780.23 - 9,209,780.23
14,604,954.32 - 14,604,954.32
2,465,707.71 - 2,465,707.71
1,785,612.70 - 1,785,612.70
10,259,975.13 - 10,259,975.13
1,709,995.86 - 1,709,995.86
846,205.28 - 846,205.28
64,766,603.61 - 64,766,603.61
2,113,643.01 - 2,113,643.01
3,170,464.52 - 3,170,464.52
4,092,389.75 - 4,092,389.75
5,304,938.09 - 5,304,938.09
4,446,292.67 - 4,446,292.67
19,127,728.04 - 19,127,728.04
54,738,756.80 - 54,738,756.80
38,337,561.60 - 38,337,561.60
64,766,603.61 - 64,766,603.61
19,127,728.04 - 19,127,728.04
176,970,650.05 - 176,970,650.05
FOUNDATION WORKS
B5.8/1/D Bridges - Foundation (or Bottom Slab) 20,158,980.04 100.000% 0.000% 100.000%
B5.8/241 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/1/M Underpasses - Foundation (or Bottom Slab) 10,131,812.24 100.000% 0.000% 100.000%
B5.8/242 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/243 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUB-STRUCTURE WORKS
B5.8/244 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/245 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
SUPER-STRUCTURE WORKS
B5.8/3/B Bridges - Top Slab (Girder) - Production 13,245,353.91 100.000% 0.000% 100.000%
B5.8/3/C Bridges - Top Slab (Girder) - Installation 8,182,609.05 100.000% 0.000% 100.000%
B5.8/246 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/247 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/248 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/249 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B5.8/250 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B5.8/251 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
642,588.63 - 642,588.63
81,566.98 - 81,566.98
837,553.60 - 837,553.60
20,158,980.04 - 20,158,980.04
635,028.76 - 635,028.76
76,792.33 - 76,792.33
629,060.44 - 629,060.44
B5.8/252 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
892,064.21 - 892,064.21
73,609.22 - 73,609.22
158,757.19 - 158,757.19
10,131,812.24 - 10,131,812.24
B5.8/253 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
39,788,769.44 - 39,788,769.44
B5.8/254 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
13,578,280.53 - 13,578,280.53
3,095,135.08 - 3,095,135.08
4,137,223.55 - 4,137,223.55
5,943,951.26 - 5,943,951.26
12,158,347.42 - 12,158,347.42
B5.8/255 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
38,912,937.84 - 38,912,937.84
B5.8/256 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
5,073,039.18 - 5,073,039.18
13,245,353.91 - 13,245,353.91
8,182,609.05 - 8,182,609.05
14,796,364.26 - 14,796,364.26
1,021,367.77 - 1,021,367.77
595,097.28 - 595,097.28
5,640,599.16 - 5,640,599.16
- - -
B5.8/257 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
56,777,530.64 - 56,777,530.64
B5.8/258 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.8/259 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.8/260 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
39,788,769.44 - 39,788,769.44
38,912,937.84 - 38,912,937.84
56,777,530.64 - 56,777,530.64
B5.8/261 Bill.5.8-IC H
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B5.8/262 Bill.5.8-IC H
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Pipe Works
Manholes
B6.1/1/M Concrete Cover Slab / Metal Cover & Frame 12,262,792.90 8.060% 6.119% 14.179%
Catch Basins
B6.1/2/E R/C Pipe Culvert incl. Inlet & Outfall 41,693,495.85 63.610% 6.460% 70.070%
Gullies
Grating
Flood Basins
B6.1/2/J Flood Basins 61,927,104.13 52.708% 0.000% 52.708%
Collection Page
- - -
- - -
32,640,538.04 - 32,640,538.04
B6.2/1/B Mob. of Excavators, TBMs and STPs 13,870,000.00 100.000% 0.000% 100.000%
CONSTRUCTION
1,900,000.00 - 1,900,000.00
13,870,000.00 - 13,870,000.00
- - -
- - -
- - -
- - -
- - -
- - -
- 7,513,971.33 7,513,971.33
- 2,597,432.54 2,597,432.54
- - -
- - -
Pipe Works
B07/279 Bill.7-PW
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Chambers
B07/1/P Concrete Cover Slab / Metal Cover & Frame 658,457.47 22.857% 0.000% 22.857%
B07/280 Bill.7-PW
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B07/281 Bill.7-PW
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
846,591.94 - 846,591.94
B07/282 Bill.7-PW
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
19,161.11 - 19,161.11
553,104.28 - 553,104.28
225,757.41 - 225,757.41
500,430.31 - 500,430.31
564,390.24 - 564,390.24
112,878.05 - 112,878.05
150,503.62 - 150,503.62
60,201.45 - 60,201.45
112,878.05 - 112,878.05
B07/283 Bill.7-PW
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B07/284 Bill.7-PW
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Pipe Works
B08/285 Bill.8-TSE
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B08/1/N Concrete Cover Slab / Metal Cover & Frame 12,565,154.98 0.000% 0.000% 0.000%
B08/1/Q Ductile Iron Fitting incl. Concrete Plinth 6,282,577.50 0.000% 0.000% 0.000%
B08/286 Bill.8-TSE
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B08/287 Bill.8-TSE
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
6,395,950.26 - 6,395,950.26
B08/288 Bill.8-TSE
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- 95,876.41 95,876.41
- - -
- - -
- - -
B08/289 Bill.8-TSE
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B08/290 Bill.8-TSE
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Pipe Works
B09/291 Bill.9-FS
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B09/1/G Concrete Cover Slab / Metal Cover & Frame 30,439.97 0.000% 0.000%
B09/1/G Ductile Iron Fitting incl. Concrete Plinth 10,146.65 0.000% 0.000%
B09/292 Bill.9-FS
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B09/293 Bill.9-FS
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
356,320.17 - 356,320.17
518,055.18 - 518,055.18
B09/294 Bill.9-FS
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
B09/295 Bill.9-FS
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B09/296 Bill.9-FS
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
MV Cable Works
B10/1/F MV Excavation 8,513,397.63 83.146% 3.689% 86.835%
B10/1/G MV Bedding 4,441,772.68 82.004% 4.831% 86.835%
B10/297 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
LV Cable Works
B10/298 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Substation Works
B10/299 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B10/300 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B10/301 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B10/302 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
5,182,068.12 - 5,182,068.12
2,220,886.34 - 2,220,886.34
48,859,499.46 - 48,859,499.46
6,662,659.02 - 6,662,659.02
2,220,886.34 - 2,220,886.34
B10/303 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B10/304 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
352,787.79 - 352,787.79
- 3,664,462.46 3,664,462.46
B10/305 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
9,253,693.08 - 9,253,693.08
B10/306 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B10/307 Bill.10-EL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B10/308 Bill.10-EL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B11/1/C Supply & Installation of High Mast Columns 65,643,205.06 4.275% 9.137% 13.412%
B11/1/F Supply & Install. of Street Lighting Columns 30,296,863.87 0.545% 0.000% 0.545%
B11/309 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Feeder Pillar
Supply and Install feeder pillar including foundations,
B11/1/H 15,148,431.94 0.000% 0.000% 0.000%
earthing and all necessary works as required.
B11/310 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Cable Works
B11/2/A Trench Excavation 26,509,755.89 0.346% 1.323% 1.669%
B11/311 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B11/312 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
Collection Page
B11/313 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B11/314 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
16,511.79 - 16,511.79
72,927.08 - 72,927.08
165,117.91 - 165,117.91
B11/315 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,972,576.80 - 2,972,576.80
- - -
B11/316 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- - -
B11/317 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B11/318 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B11/319 Bill.11-SL
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B11/320 Bill.11-SL
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B12/321 Bill.12-TELECOM
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B12/322 Bill.12-TELECOM
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B12/323 Bill.12-TELECOM
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,534,801.33 - 2,534,801.33
8,337,644.18 - 8,337,644.18
13,941,407.33 - 13,941,407.33
5,069,602.66 - 5,069,602.66
2,112,334.44 - 2,112,334.44
4,113,665.81 - 4,113,665.81
1,711,803.74 - 1,711,803.74
B12/324 Bill.12-TELECOM
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B12/325 Bill.12-TELECOM
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B12/326 Bill.12-TELECOM
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B13/327 Bill.13-QAF
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B13/328 Bill.13-QAF
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,668,614.45 - 2,668,614.45
604,721.98 - 604,721.98
- - -
B13/329 Bill.13-QAF
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B13/330 Bill.13-QAF
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B14/331 Bill.14-UGN
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B14/332 Bill.14-UGN
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
2,647,996.41 - 2,647,996.41
14,110,928.23 - 14,110,928.23
23,169,968.61 - 23,169,968.61
7,582,958.96 - 7,582,958.96
B14/333 Bill.14-UGN
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B14/334 Bill.14-UGN
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B19/335 Bill.19-
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B19/336 Bill.19-
INTERIM PAYMENT METHODOLOGY
Contract No: C2017/113
Description: Design and Build of Al Khor Expressway
B19/337 Bill.19-
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
- -
- -
B19/338 Bill.19-
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B19/339 Bill.19-
ENT METHODOLOGY
Interim Payment No : 24
Period Ending : 21-Aug-2018
Recommend. Date : 04-Sep-2018
B19/340 Bill.19-
SUB 4 DESCRIPTION AMOUNT (QR) PREVIOUS % CURRENT % TO-DATE %
Performance Bond; in accordance with the Clause 4.2 of General 123,120,000.00 100.00% 0.00% 100.00%
Conditions of Contract
All insurances required for the contract; in accordance with the Clauses Included 0.00% 0.00% 0.00%
18.1, 18.2, 18.3 & 18.4 of General Conditions of Contract
Provision of Engineer's Site Office and Facilities as per QCS 2014 8,436,000.00 100.00% 0.00% 100.00%
Section 1 - General Part 11
Provision of Contractor's Site Office and Facilities as per QCS 2014 70,300,000.00 100.00% 0.00% 100.00%
Section 1 - General Part 12
Allow for mobilizing Contractor's Equipment/Plant; as per Conditions of 33,744,000.00 100.00% 0.00% 100.00%
Contract
Allow for Obligations & Liabilities complying with Conditions of Contract 32,000,000.00 67.58% 0.00% 67.58%
Allow for Quality Assurance, Testing and Health & Safety as per 27,960,000.00 67.58% 0.00% 67.58%
required by Conditions of Contract
Allow for other all necessary reuirements; such as superindendence, 443,464,000.00 67.58% 0.00% 67.58%
maintenance works and etc as per the Conditions of Contract, except
the temporary road measured under bill 5.
Design Works 147,820,000.00 99.570% 0.000% 99.570%
Earth Works including exacavation & filling works as required 8,657,002.68 95.00% 0.00% 95.00%
B01/341 Filter
SUB 4 DESCRIPTION AMOUNT (QR) PREVIOUS % CURRENT % TO-DATE %
B01/342 Filter
SUB 4 DESCRIPTION AMOUNT (QR) PREVIOUS % CURRENT % TO-DATE %
B01/343 Filter
SUB 4 DESCRIPTION AMOUNT (QR) PREVIOUS % CURRENT % TO-DATE %
Tack Coat and Asphalt Intermediate Course 91,359,785.85 6.42% 0.00% 6.42%
Tack Coat and Asphalt Wearing Course 71,771,120.55 0.96% 0.00% 0.96%
B01/344 Filter
PREVIOUS (QAR) CURRENT (QAR) TO-DATE (QAR)
123,120,000.00 - 123,120,000.00
- - -
8,436,000.00 - 8,436,000.00
70,300,000.00 - 70,300,000.00
33,744,000.00 - 33,744,000.00
147,184,374.00 - 147,184,374.00
111,982.77 - 111,982.77
562,162.50 - 562,162.50
972,915.90 - 972,915.90
8,224,152.55 - 8,224,152.55
3,746,250.90 - 3,746,250.90
4,310,811.96 - 4,310,811.96
7,152,206.10 - 7,152,206.10
2,141,629.25 - 2,141,629.25
B01/345 Filter
PREVIOUS (QAR) CURRENT (QAR) TO-DATE (QAR)
709,404.10 - 709,404.10
266,060.27 - 266,060.27
1,238,856.24 - 1,238,856.24
215,870.40 - 215,870.40
4,065,559.20 - 4,065,559.20
1,457,125.20 - 1,457,125.20
25,112,923.20 - 25,112,923.20
4,317,408.00 - 4,317,408.00
5,036,976.00 - 5,036,976.00
9,678,189.60 - 9,678,189.60
6,961,820.40 - 6,961,820.40
5,360,781.60 - 5,360,781.60
5,451,627.06 - 5,451,627.06
1,390,565.16 - 1,390,565.16
390,365.64 - 390,365.64
2,230,660.80 - 2,230,660.80
23,985.60 - 23,985.60
B01/346 Filter
PREVIOUS (QAR) CURRENT (QAR) TO-DATE (QAR)
503,697.60 - 503,697.60
3,813,710.40 - 3,813,710.40
239,856.00 - 239,856.00
887,467.20 - 887,467.20
1,607,035.20 - 1,607,035.20
1,367,179.20 - 1,367,179.20
887,467.20 - 887,467.20
1,526,683.44 - 1,526,683.44
143,913.60 - 143,913.60
71,956.80 - 71,956.80
839,496.00 - 839,496.00
5,995,395.60 - 5,995,395.60
56,213,713.49 - 56,213,713.49
27,289,707.35 - 27,289,707.35
62,599,348.72 - 62,599,348.72
85,285,078.37 - 85,285,078.37
36,568,716.39 - 36,568,716.39
13,589,951.16 - 13,589,951.16
18,221,189.41 - 18,221,189.41
16,418,122.81 - 16,418,122.81
53,470,195.80 - 53,470,195.80
B01/347 Filter
PREVIOUS (QAR) CURRENT (QAR) TO-DATE (QAR)
5,865,298.25 - 5,865,298.25
689,002.76 - 689,002.76
B01/348 Filter