Professional Documents
Culture Documents
Viyellatex Spinning Limited: Clearance Report From Concern Department
Viyellatex Spinning Limited: Clearance Report From Concern Department
Viyellatex Spinning Limited: Clearance Report From Concern Department
Date: 31.10.2014
1 Production Planning
2 Quality Assurance
Plant maintenance
3
4 Human Resources
5 Material
Management
6 Administration
Viyellatex Spinning Limited
Mulaid, Sreepur, Gazipur
Date: 31.10.2014
Sub: Charge hand over & take over
Equipments:
Uster tester UT-4SX -01 set
Uster AFIS -01 set
Uster HVI -01 set
Autosorter-4 -01 set
Wira wrap reel -01 set
Auto Wrap XT -01 Set
Wira digital twist tester -01 set
Wira sliver roving reel -01 set
Auto Winder XT -01 Set
Mag Elestretch -01 Set
Portable scale -02 set
Moisture meter -01 set
Tachometer -01 set
Tension meter -01 set
Manual wrap block -01 set
Calculator -04 set
Key -13 pcs
Documents:
Operating manual of UT-4SX -01 set
Operating manual of AFIS -01 set
Operating manual of HVI -01 set
Operating manual of Autosorter-4 -01 set
Operating manual of Twist tester -01 set
Operating & program CD -15 set
File & Register -All maintained in Q.A deptt
_____________ ____________
Handed over by Taken over by
_______________
Team Leader (HR)