Viyellatex Spinning Limited: Clearance Report From Concern Department

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Viyellatex Spinning Limited

Mulaid, Sreepur, Gazipur

Date: 31.10.2014

Clearance Report from concern department

Name: Md. Monirul Islam


Designation: Manager (Q.A)
Date of joining: 06.11.2007

SL NO. DEPARTMENT OPINION SIGN. OF DEPT. HEAD

1 Production Planning

2 Quality Assurance

Plant maintenance
3

4 Human Resources

5 Material
Management

6 Administration
Viyellatex Spinning Limited
Mulaid, Sreepur, Gazipur

Date: 31.10.2014
Sub: Charge hand over & take over

As per discussion with Team Leader (HR), Viyellatex Spinning, Concern of


Viyellatex Group,Md.Monirul Islam, Manager (Q.A) handed over the following
documents & equipments to Md.Ahsanullah, Technical Adviser.

Equipments:
Uster tester UT-4SX -01 set
Uster AFIS -01 set
Uster HVI -01 set
Autosorter-4 -01 set
Wira wrap reel -01 set
Auto Wrap XT -01 Set
Wira digital twist tester -01 set
Wira sliver roving reel -01 set
Auto Winder XT -01 Set
Mag Elestretch -01 Set
Portable scale -02 set
Moisture meter -01 set
Tachometer -01 set
Tension meter -01 set
Manual wrap block -01 set
Calculator -04 set
Key -13 pcs

Documents:
Operating manual of UT-4SX -01 set
Operating manual of AFIS -01 set
Operating manual of HVI -01 set
Operating manual of Autosorter-4 -01 set
Operating manual of Twist tester -01 set
Operating & program CD -15 set
File & Register -All maintained in Q.A deptt

_____________ ____________
Handed over by Taken over by

_______________
Team Leader (HR)

You might also like